Energy Saving Group | Retrofitting Together 2.0 | Pilot Sites BIRMIGHAM MEETING - NOV 2015 Company ATER TREVISO ITALY Veneto Region Country City TREVISO Name and General manager Flavio Bellin surname SOME BRIEF EXAMPLES OF NZE DESIGN


  1. Energy Saving Group | Retrofitting Together 2.0 | Pilot Sites BIRMIGHAM MEETING - NOV 2015 Company ATER TREVISO ITALY – Veneto Region Country City TREVISO Name and General manager Flavio Bellin surname SOME BRIEF EXAMPLES OF NZE DESIGN : 4 CASE STUDIES <pilot site name> | <company> | <name and surname> ATER TREVISO | arch. S. Manente -| ing. P. Zorzi

  2. Energy Saving Group | Retrofitting Together 2.0 | Pilot Sites 1 - BORGO FURO PILOT SITE Pilot site name BORGO FURO DI S. BONA Pilot site - first design City TREVISO Year of construction 1976 N ° of dwellings 36 ( 2 towers, 16 dw.each) N ° of floors 7 floor (6 residential floor) 1540,5 m 2 (256, 8 m 2 = 1 floor) Total floor surface AFTER Replacement of the existing one glazed metal windows ( Uw=6) with triple-glazed low-emissivity wooden aluminium ones (Uw =1,2). Total cost of works [ € ] 647.019,25 € External walls U=0,177 BEFORE Polystirole EPS cm 16 8 (light blue) (technical costs+ 98.679,85 (18%) External walls U=0,642 Aerogel cm 5 on the lodges (red) financial costs 0 Stairs walls U=0,848 548.321,40 € Aerogel cm 1.5 on the jambs (red) +works) <pilot site name> | <company> | <name and surname> BORGO FURO DI S. BONA Treviso | ATER TREVISO | - arch. S. Manente

  3. Energy Saving Group | Retrofitting Together 2.0 | Pilot Sites 1 - BORGO FURO PILOT SITE Heat recovery efficiency 80 [%] 1. Ground floor and top floor slab insulation First design 2. Residencial external walls insulation, insulated jambs. 3. Replacement of the existing metal windows with triple- glazed low-emissivity wooden aluminium ones (Uw =1,2). 4. New insulated boxes, electric blinds, insulated metal thresholds. 5. New condensing boilers (high efficiency water heaters). 6. New aluminum windows in the stairwell and in the entrance. 7. New security door in each apartment and painting stairwell walls and celings. 8. New verandas ( no thermal bridges on the wall) 9. New coat roof (with takeaway in tiles, laying waterproof membrane, repositioning of tiles and possible integration of non-reusable). 10. Safety lines on the roof. 11. Limitation devices against the consumption of water 12. CMV systems with heat exchangers : the controlled ventilation systems for energy recovery allows partial recover of heating or cooling energy that would be lost with simple air change (for example by opening windows). 13. Drywall celings in bathroom and corridors 14. Replacement of the overpanel interior door 15. CMV : Main aspirators (for the removal of stale or polluted air) and main speakers (for fresh air inlet) are positioned out of existing verandas through a suitable panel. Details <pilot site name> | <company> | <name and surname> BORGO FURO DI S. BONA Treviso | ATER TREVISO | arch. S. Manente

  4. Energy Saving Group | Retrofitting Together 2.0 | Pilot Sites 1 - BORGO FURO PILOT SITE Thanks to the national law of funding, so- called “ Deceto Lupi ”, the new solution Iinclude ALL THE PREVIOUS New design PROPOSALS ACTIONS, and also adds: 1. Solar screens/blinds with daylight sensor (home automation) 2. Ventilated facade 3. Home automation to ventilation and solar screens control high budget small budget details In this solution, one obtains the natural circulation of air in the interspace, due to the convective motion produced by the presence of openings arranged at the base and at the top of the facade. Air movement in the cavity contributes to dry any water infiltration and to remove the heat accumulated solar radiation in the coating layer, including improving the thermal insulation of the wall during the winter. The interspace between the coating and the wall is designed in such a way that the air present in it can flow for chimney effect in a natural way (medium budget solution) and / or in artificially controlled way ( high budget solution with Details automation appliances). <pilot site name> | <company> | <name and surname> BORGO FURO DI S. BONA Treviso | ATER TREVISO | arch. S. Manente

  5. Energy Saving Group | Retrofitting Together 2.0 | Pilot Sites 2- DREEAM PROJECT - call EeB -08-2015) THE PROJECT PROPOSAL FOR CALL (EeB-08-2015) Horizon2020 - call "Integrated approach to retrofitting of residential buildings", EURHONET NETWORK - DREEAM PROJECT Demonstration of an integrated renovation approach for energy efficiency at the multi building scale The Project aims to demonstrate replicable Net Zero Energy (NZE) residential building renovation approaches achieving a reduction of 75% total Net Energy Demand . There is a need to develop and demonstrate a systemic approach that allows designing and operating ( socially, economically, technically, etc..) a cost-effective and replicable renovation solution package for balancing EE and RES to achieve NZE standards from the multi building perspective. DREEAM approach: • 60% EDR energy demand reduction + 15% REG energy generation • 3 pilot site, in different climate zone ( Italy, Sweden, UK) • Social and public housing – 360 dwellings • Higher ROI and 30% reduced payback • The Dissemination and exploitation activities will ensure that the project reach majority of EU social and public housing companies. DREEEAM PROJEC | ATER TREVISO | arch. S. Manente <pilot site name> | <company> | <name and surname>

  6. Energy Saving Group | Retrofitting Together 2.0 | Pilot Sites 2 - DREEAM PROJECT - call EeB -08-2015) TREVISO PILOT SITE VIALE FRANCIA 102 DWELLING LINE-TYPE BUILDING 1) optimization of passive system (building envelope) to minimize active ones 2) geotermal optimal solution to reduce the demand for electricity . 3) electricity production from renewable sources (photovoltaic) 4) innovative design actions: • elimination of terraces in the south west • arrangement of steel frames on the facade that integrate new terraces with building integrated photovoltaic coating • replacement of the thermal boilers with heat pumps and underground het stoage (ATES techonology) • installation of roof mounted solar thermal system and storage • application of a new building shell: ventilated facade system in fbre-cement • reduction of losses through the insulation of all the facades ( outer coat) • partial redefinition of some north-east openings to reduce heat losse ( winter) • high energy efficient windows • elimination of the terraces on the north east due to reduce thermal bridges <pilot site name> | <company> | <name and surname> DREEEAM PROJEC | ATER TREVISO | arch. S. Manente

  7. Energy Saving Group | Retrofitting Together 2.0 | Pilot Sites 3 – BUILDTOG++ : NEW PILOT SITE IN TREVISO Masterplan «Feltrina»: rebuilding and innovation in the “via Cisole” district . The social housing “Via Cisole ” neighborhood is characterized by a trapezoidal area of 20,258 square meters, including between the highway Feltrina and Via Castagnole , and it is situated in Treviso near the Rugby stadium. The settlement, built in 1949, is currently only partially inhabited and consists of 12 buildings with 8 units each, for a total of 96 apartments and 65 car garage in sheet metal. The Masterplan provides for the complete demolition and reconstruction of the old district in order to create a new zero impact neighborhod with approximately 150/200 new apartments. The Masterplan also includes a participatory planning with all stakeholders, with a Neighborhood Laboratory to envolve both t current inhabitants and all associations and organizations interested in. The project includes: • Zero energy buildings and ecofriendly architecture. • Geothermal and solar energy and photovoltaic • District heat pump system. • Home automation for the management of energy and water summer cooling. • Green buildings and houses with wooden frame/structure • Public park • Redesign of road and pedestrian links to the town center and neighboring districts • Permanent district laboratories younger - elderly + (new forms of social housing). • Partnering forms of public-private partnerships or project financing. <pilot site name> | <company> | <name and surname> DREEEAM PROJEC | ATER TREVISO | arch. S. Manente

  8. Energy Saving Group | Retrofitting Together 2.0 | Pilot Sites 4 – NEAR ZERO ENERGY TIMBER BUILDING IN MOGLIANO Energy consumption monitoring and ITC control.experience. Energy Performance for heating and domestic hot water 5,00 – 6,50 kWh/mq*year <pilot site name> | <company> | <name and surname> DREEEAM PROJEC | ATER TREVISO | arch. S. Manente

  9. Energy Saving Group | Retrofitting Together 2.0 | Pilot Sites 4 – NEAR ZERO ENERGY TIMBER BUILDING IN MOGLIANO Energy consumption monitoring and ITC control experience. Why timber structure? 10+10 DWELLINGS • Living comfort : • Eco-friendliness - less CO2 production BUILDING ENVELOPE • High thermal protection 1. Wood fibre thermal insulation panel • High internal air quality thermal conductivity λ = 0,040 W/(mqK) • Static and seismic protection R30/R60 Density : 110 Kg/mc, thickness: 14 cm • energy savings 2. panel X-lam: thickness 10 cm • Protection from noise ): 3. Mineral wool insulation panel: 4 cm • Renovable resource 4. Double Plasteboard • Reduction of maintenance costs): Internal sealing of the panels X-lam • Certain times of realization and of cost with USB tape <pilot site name> | <company> | <name and surname> DREEEAM PROJEC | ATER TREVISO | arch. S. Manente

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.