SLIDE 1
EXIT EXIT EXIT EXISTING PATH LINE OF ROOF ABOVE, TYP CURB LINE OF CANOPY ABOVE EXISTING TREE 2'-0" NEW PAVING TYP 9' - 0" ± 2' - 8 1/2" 8' - 0" 20' - 0" 23' - 0" 16' - 0" 2' - 0" +/- 3' - 7" 24 SPACES 14 SPACES 6 SPACES 7 SPACES 5'-0" PATHWAY LINE OF DEMOLISHED BUILDING NEW FENCE AND GATE NEW FENCE AND GATE EXISTING FENCE AND HEDGE EXISTING FENCE AND HEDGE NEW CONCRETE SERVICE PATH EXISTING GAS & ELECTRICAL METER BIKE RACK NEW FENCE AND GATE NEW GATE AND FENCE NEW LANDSCAPING DECK HOSE EXISTING CLUB HOUSE PATIO
Miller Hayashi Architects
Innis Arden Swim Club Renovation Site Plan 07/30/2015
0' 30' N
SLIDE 2
REF. REF. DW 536 SF MEETING 139 SF STORAGE 616 SF WOMEN 84 SF EXISTING FILTRATION 184 SF EXISTING BOILER 10 SF EXIST'G CHEM 190 SF STAFF 148 SF STORAGE 79 SF UNISEX 396 SF ENTRY 586 SF MEN 139 SF STORAGE TROPHY CASE LIFEGUARD SUIT DRYER ROOF LINE ABOVE CUBBIES, TYP CUBBIES, TYP HAND DRYER HAND DRYER TOWEL HOOKS, TYP TOWEL HOOKS, TYP BENCH, TYP SUIT DRYER BENCH, TYP DONOR RECOGNITION WALL 21 SF Custodian DECK HOSE DRINKING FOUNTAIN
Miller Hayashi Architects
Innis Arden Swim Club Renovation Floor Plan 07/30/2015
0' 8' N GROSS SQUARE FOOTAGE PROGRAM AREA: MEETING STORAGE WOMEN'S LOCKER MEN'S LOCKER & CUSTODIAN ENTRY STAFF BOILER & FILTRATION UNISEX RESTROOM OLD 2,227 455 140 460 450 64 157 323 N/A NEW 3,390 536 426 616 586 396 190 323 79
SLIDE 3
Miller Hayashi Architects
Innis Arden Swim Club Renovation Elevations 07/30/2015
0' 16' TYPICAL MATERIALS A GROUND FACE CMU, 2" RIGID INSULATION @ INTERIOR B ACCENT PANELS: STAINED CEDAR ON FRAMING & INSULATION C PAINTED ACCENT D EXPOSED WOOD ROOF STRUCTURE E THERMAL ALUMINUM WINDOW SYSTEM F METAL ROOF OVER RIGID INSULATION G CONCRETE COLUMNS H SHADE CANOPY, SIMILAR MATERIALS
Miller Hayashi
SECTION AT LOCKER/SHOWER ROOM
SLIDE 4
Miller Hayashi Architects
Innis Arden Swim Club Renovation 3D Views 07/30/2015
Entry View From Pool Deck to Entry View From Deep End View Inside Entry