Site Layout for newly constructed Headworks and BNR/MBR in lot - - PowerPoint PPT Presentation

site layout for newly constructed
SMART_READER_LITE
LIVE PREVIEW

Site Layout for newly constructed Headworks and BNR/MBR in lot - - PowerPoint PPT Presentation

City of San Mateo WWTP Site Layout for newly constructed Headworks and BNR/MBR in lot across from current plant. Flow and Loading design specifications for new facility liquid train. Dry Weather Operating Mode Wet Weather Operating Mode Newly


slide-1
SLIDE 1

City of San Mateo WWTP Site Layout for newly constructed Headworks and BNR/MBR in lot across from current plant.

slide-2
SLIDE 2

Flow and Loading design specifications for new facility liquid train.

slide-3
SLIDE 3

Dry Weather Operating Mode

slide-4
SLIDE 4

Wet Weather Operating Mode

slide-5
SLIDE 5

Newly Commissioned CNG Production and Fuel Dispensing Facility

  • Capacity of 100 scfm/min biogas flow to produce ~40 scfm/min >95% CH4
  • CNG meets SAE J1616 vehicle fueling standard
  • treatment skid removes particulates, siloxanes, H2S and CO2
  • Prepares and transfers purified CH4 to the compression and fueling station
slide-6
SLIDE 6
  • Storage bladder has a capacity of ~50,000 scf of biogas for meeting CNG and plant demand
slide-7
SLIDE 7
  • Gas drying and compression equipment can produce and dispense 300 gas gallon equivalents per day