City of San Mateo WWTP Site Layout for newly constructed Headworks and BNR/MBR in lot across from current plant. Flow and Loading design specifications for new facility liquid train. Dry Weather Operating Mode Wet Weather Operating Mode Newly


  1. City of San Mateo WWTP Site Layout for newly constructed Headworks and BNR/MBR in lot across from current plant.

  2. Flow and Loading design specifications for new facility liquid train.

  3. Dry Weather Operating Mode

  4. Wet Weather Operating Mode

  5. Newly Commissioned CNG Production and Fuel Dispensing Facility • Capacity of 100 scfm/min biogas flow to produce ~40 scfm/min >95% CH 4 -CNG meets SAE J1616 vehicle fueling standard -treatment skid removes particulates, siloxanes, H 2 S and CO 2 • Prepares and transfers purified CH 4 to the compression and fueling station

  6. • Storage bladder has a capacity of ~50,000 scf of biogas for meeting CNG and plant demand

  7. • Gas drying and compression equipment can produce and dispense 300 gas gallon equivalents per day

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.