Simplified offer at PITS

  • 1. An improvement of the offer
  • 2. Capacity subscription
  • 3. Capacity use
  • 4. Changes in publications
slide-2
SLIDE 2

An improvement of the offer at PITS

Both subscription and use of capacity at PITS improved from 1st April 2016 :

  • More flexibility of subscription
  • An optimization of the scheduling process at PITS
  • A simpler offer :
  • Only one type of capacity at PITS
  • Management of nominations & quantity scheduling handled only by Storengy

2

slide-3
SLIDE 3

The “Capacité d’Interface Transport-Stockage” (CITS)

For all PITS, we create a new capacity type at PITS: the CITS

  • In place of both current firm & interruptible capacities
  • The allocation of this capacity stays automatic and in line with

your storage subscription

3

The capacity you subscribed is definitly yours It won’t depend anymore on other shippers subscription

slide-4
SLIDE 4

The “Capacité d’Interface Transport-Stockage” (CITS)

One only capacity type at PITS improves the flexibility of subscription:

  • Reduction of advance notice from 10 days to 5 working days

before the start of your CITS/Storage product

  • From 1st April on, CITS can:
  • Start & end any day of the month
  • Last more than 1 day and less than 1 month
  • An excess in capacity usage will be automatically billed as daily

capacity

4

slide-5
SLIDE 5

Example

  • What you had before:
  • Equivalent in new system:

5

50 100 20 18 35 7 Shipper A Shipper B Shipper C Firm Interruptible 68 135 27 Shipper A Shipper B Shipper C CITS

GRTgaz neither changes the level of marketed capacity at each PITS nor the availability conditions from day to day

slide-6
SLIDE 6

The Single Nomination with Storengy

Nominations & quantity scheduling will be:

  • Handled only by Storengy (via SAM), on the basis of the lowest of both operators’

Technical Capacities (called “CTM”)

  • Transmitted to GRTgaz by Storengy
  • Published in TRANS@ctions by GRTgaz & in SAM by Storengy

This process allows Storengy to reduce the duration of its scheduling cycles from 2 to 1 hour (except for the 1st cycle day-ahead)

6

Caution : From 1st April 2016 onward, you shouldn’t nominate directly to GRTgaz anymore on PITS

slide-7
SLIDE 7

Illustrations of scheduling cycles

SHIPPER

Nominations until H-2

  • n all Points

Scheduled Quantities (H)

STORENGY

Scheduling cycle

GRTgaz

Scheduling cycle

7

Matching

SHIPPER

Nominations until H-2

  • n all points except PITS

Nominations until H-1 On PITS Scheduled Quantities (H)

STORENGY

Scheduling cycle

GRTgaz

Scheduling cycle

Time

For a better flexibility on storages, you will now have nominations on PITS until H-1 (instead of H-2) in your scheduling notice

slide-8
SLIDE 8

Changes in TRANS@ctions publications

  • Maintenance Schedule:
  • You will have access to the Minimum Technical Capacity (CTM) used by

Storengy to schedule quantities at PITS

  • You will no longer have restriction rates (TRi & TRf) on PITS as the new

capacity is scheduled by Storengy

  • Your scheduling notice evolves:
  • Your scheduling notice (published at hour H) will now includes nominations

made until H-1 on PITS

8