SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
SH 358 IMPROVEMENTS
Corpus Christi District
Updated October 2018
SH 358 IMPROVEMENTS Corpus Christi District Updated October 2018 - - PowerPoint PPT Presentation
SH 358 IMPROVEMENTS Corpus Christi District Updated October 2018 SH 358 Improvements Corpus Christi District All dates & schedules are subject to change Updated October 2018 Project Overview Length: 15 miles Total cost: $49.96
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
Updated October 2018
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Install new lighting – Install Intelligent Transportation Systems (ITS), including traffic cameras
– Reconstruct center median barrier – Widen freeway to improve capacity and mobility – Reverse ramps – Improve signal timing
2
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
3
January 2018 – June 2018 March 2018 – Spring 2019 Fall 2018 – Summer 2019 Spring 2019 – Summer 2020 Summer 2020 Summer 2020 – Spring 2021 Spring 2021 – Fall 2021 Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 Phases 7-10
* This schedule is subject to change. ITS and eastbound frontage road signal improvements from north of Leopard Street to east of Flour Bluff Drive will be made throughout project duration.
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
4
Crews begin work to reconstruct the mainlane center median barrier.
TxDOT Photo
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Accommodate future eastbound mainlane traffic shifts and permanent center median barrier
– Various off-peak eastbound and westbound mainlane closures
5
Off-peak lane closures are required as the existing center median barrier is replaced with a temporary barrier and the inside shoulders are reconstructed.
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Add new sidewalks and curbs/gutters – Add 3rd eastbound lane on frontage road east
– Accommodate future relocated off-ramp
– Off-peak closures of outside eastbound frontage road lane – Temporary closures of Richter Street
6
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
Relocated EB off- ramp to Kostoryz Rd/ Carroll Ln
– Between Kostoryz Road and Weber Road – Between Weber Road and Everhart Road – Between Everhart Road and South Staples Street – Near Airline Road
7
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
New Kostoryz Rd/ Carroll Ln off-ramp to be built farther west Existing Kostoryz Rd/ Carroll Ln off-ramp
– Build new off-ramp near Richter Street, west of existing off-ramp – Improve drainage along frontage road – Permanently close existing off-ramp
– Improve safety and mobility for eastbound mainlane and frontage road drivers approaching the Kostoryz Road intersection.
– Off-peak closures of inside eastbound frontage road lane
8
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Add new sidewalks and curbs/gutters – Add 3rd eastbound lane on frontage road east
– Off-peak closures of outside eastbound frontage road lane – Potential temporary closures:
near Wilkinson Drive for drainage pipe installation
9
Existing ramps near Cosner Dr and Wilkinson Dr
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
Existing ramps near Oakhurst Dr and Embassy Dr
ramps adjacent to Oakhurst Drive and Embassy Drive:
– Add new sidewalks and curbs/gutters – Extend 3rd eastbound lane on frontage road to/from freeway ramps
widened eastbound mainlanes
– Off-peak closures of outside eastbound frontage road lane – Potential temporary closures:
both Oakhurst Drive and Embassy Drive for drainage pipe installation
– Permanent closure of one redundant driveway east
10
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
Existing ramps near the Academy store and Moore Plaza shopping center
ramps adjacent to the Academy store and Moore Plaza shopping center:
– Add new sidewalks and curbs/gutters – Extend 3rd eastbound lane on frontage road to/from freeway ramps
and widened eastbound mainlanes
– Off-peak closures of outside eastbound frontage road lane as needed – Potential temporary closures:
both Blanche Moore Drive and the Academy store for drainage pipe installation
11
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Add new sidewalks and curbs/gutters – Add new inlets and pipe to improve drainage at Airline Road intersection
– Off-peak closure of outside eastbound frontage road lane as needed – Potential temporary closures:
restaurant for drainage pipe installation
Airline Road intersection
12
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
13
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Off-peak closures of Kostoryz Road intersection – Potential temporary closure of westbound-to- eastbound turnaround under bridge – Potential temporary detours of Kostoryz Road/frontage road traffic to adjacent intersections and turnarounds
14
An additional lane will be built
bridges at Kostoryz, Carroll, Weber, Everhart, and Staples.
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Potential off-peak closure of Carroll Lane intersection – Potential temporary closure of westbound-to- eastbound turnaround under bridge – Potential temporary detours of Carroll Lane/ frontage road traffic to adjacent intersections and turnarounds
15
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
Existing Weber Rd
New Weber Rd
built farther west
– Off-peak closures of inside eastbound frontage road lane – Permanently close existing off-ramp
16
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– None
17
Current high-mast lighting structures along SH 358
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Add new sidewalks and curbs/gutters
– Off-peak closure of outside eastbound frontage road lane as needed – Potential temporary closures:
18
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Weber Road – Everhart Road – South Staples Street
19
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Reconstruct median between mainlanes and frontage road, add new barriers and curbs/gutters – Improve drainage
– Temporary closure of existing on-ramp – Temporary detour of eastbound Kostoryz Road freeway on-ramp traffic to the on-ramp after Carroll Lane and Weber Road
20
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Potential off-peak closure of each intersection and turnarounds as needed for bridge construction – Detours of frontage road traffic to adjacent intersections/turnarounds
21
An additional lane will be built
bridges at Kostoryz, Carroll, Weber, Everhart, and Staples.
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Note: this will not open until Phase 6
22
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Off-peak closures of inside mainlanes
23
Permanent center median barrier and shoulder reconstruction will allow for four travel lanes. Workers perform initial upgrades on the SH 358 mainlane bridges.
TxDOT Photo
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
Road and South Staples Street
eastbound mainlanes and frontage road approaching the South Staples Street intersection
– Close existing eastbound on-ramp from Everhart Road, and replace with new off-ramp to South Staples Street (Phase 5A) – Temporarily detour eastbound on-ramp traffic to the ramp after South Staples Street (Phase 5A) – Close existing eastbound off-ramp to South Staples Street, and replace with new on-ramp from Everhart Road (Phase 5B)
existing westbound freeway ramps between South Staples Street and Everhart Road
24
Existing off-ramp to S Staples St will become on-ramp from Everhart Rd Existing on-ramp from Everhart Rd will become off-ramp to S Staples St
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
25
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
26
Existing off-ramp to Everhart Rd will become on-ramp from Weber Rd Existing on-ramp from Weber Rd will become off-ramp to Everhart Rd
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Close existing eastbound off-ramp to Everhart Road, diverting traffic to temporary off-ramp constructed in Phase 5A – Construct new eastbound on-ramp from Weber Road in the location of the former Everhart Road off-ramp and close existing eastbound
detouring traffic to new on-ramp after Everhart Road – Construct new eastbound off-ramp to Everhart Road in the location of the former Weber Road
27
Existing off-ramp to Everhart Rd will become on-ramp from Weber Rd Existing on-ramp from Weber Rd will become off-ramp to Everhart Rd
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Off-peak closures of inside mainlanes
28
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Add new curbs/gutters – Improve drainage
– Periodic temporary closure of existing on-ramp and frontage road lanes for new drainage pipe construction – Wide loads limited during staged ramp reconstruction – Alternate routes to be provided during any detours
29
Airline Rd
The eastbound off-ramp to Airline Road will remain open during reconstruction, though the ramp width will be temporarily narrowed.
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
30
Workers perform initial upgrades on the SH 358 mainlane bridges.
TxDOT Photo
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
permanent center median barrier between:
– Weber Road and South Staples Street (Phase 7A) – South Staples Street and east of Airline Road (Phase 7B)
at:
– Kostoryz Road (Phase 7B) – Carroll Lane (Phase 7B) – Weber Road (Phase 7B) – Everhart Road (Phase 7B) – South Staples Street (Phases 7B and 7C) – Airline Road (Phase 7C)
eastbound travel lanes from Ayers Street to just east of Airline Road
– Off-peak closures of inside mainlanes
31
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Install lane striping/markings on new eastbound mainlane pavement – Repave eastbound frontage road
– Install lane striping/markings on new eastbound frontage road pavement – Perform project wrap-up duties
32
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
33
SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change
– Slides 6, 8
– Slides 6, 8, 9, 14, 20
– Slides 9, 15, 16, 20
– Slides 9, 10, 16, 21, 26, 27
– Slides 10, 11, 17, 21, 24, 26, 27
– Slides 11, 17, 18, 21, 24, 29
– Slides 12, 18, 29