SH 358 IMPROVEMENTS Corpus Christi District Updated October 2018 SH 358 Improvements Corpus Christi District All dates & schedules are subject to change Updated October 2018 Project Overview Length: 15 miles Total cost: $49.96


slide-1
SLIDE 1

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

SH 358 IMPROVEMENTS

Corpus Christi District

Updated October 2018

slide-2
SLIDE 2

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

  • Length: 15 miles
  • Total cost: $49.96 million
  • Mainlane improvements from north of

Leopard Street to east of Flour Bluff Drive:

– Install new lighting – Install Intelligent Transportation Systems (ITS), including traffic cameras

  • Eastbound mainlane and frontage road

improvements from Ayers Street to Nile Drive:

– Reconstruct center median barrier – Widen freeway to improve capacity and mobility – Reverse ramps – Improve signal timing

2

Project Overview

slide-3
SLIDE 3

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Project Phases and Timeline

3

January 2018 – June 2018 March 2018 – Spring 2019 Fall 2018 – Summer 2019 Spring 2019 – Summer 2020 Summer 2020 Summer 2020 – Spring 2021 Spring 2021 – Fall 2021 Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 Phases 7-10

The project is being constructed in 10 phases*:

* This schedule is subject to change. ITS and eastbound frontage road signal improvements from north of Leopard Street to east of Flour Bluff Drive will be made throughout project duration.

slide-4
SLIDE 4

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Construction Sequencing – Phase 1 Overview

  • Construct new temporary mainlane center

median barrier from Ayers Street to Airline Road

  • Widen eastbound frontage road and

construct sidewalks between Ayers Street and Kostoryz Road

4

Crews begin work to reconstruct the mainlane center median barrier.

TxDOT Photo

slide-5
SLIDE 5

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 1 – Mainlanes Between Ayers Street and Airline Road

  • Remove existing center median barrier
  • Reconstruct inside shoulders and add

temporary center median barrier

  • Purpose:

– Accommodate future eastbound mainlane traffic shifts and permanent center median barrier

  • Closures required:

– Various off-peak eastbound and westbound mainlane closures

5

Off-peak lane closures are required as the existing center median barrier is replaced with a temporary barrier and the inside shoulders are reconstructed.

slide-6
SLIDE 6

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 1 – Eastbound Frontage Road near Richter Street

  • Widen eastbound frontage road near future

Kostoryz Road/Carroll Lane off-ramp:

– Add new sidewalks and curbs/gutters – Add 3rd eastbound lane on frontage road east

  • f Richter Street
  • Purpose:

– Accommodate future relocated off-ramp

  • Required closures:

– Off-peak closures of outside eastbound frontage road lane – Temporary closures of Richter Street

6

slide-7
SLIDE 7

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Relocated EB off- ramp to Kostoryz Rd/ Carroll Ln

Construction Sequencing – Phase 2 Overview

  • Construct new eastbound off-ramp and

remove existing off-ramp serving Kostoryz Road and Carroll Lane

  • Widen eastbound frontage road and

construct sidewalks in segments:

– Between Kostoryz Road and Weber Road – Between Weber Road and Everhart Road – Between Everhart Road and South Staples Street – Near Airline Road

7

slide-8
SLIDE 8

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

New Kostoryz Rd/ Carroll Ln off-ramp to be built farther west Existing Kostoryz Rd/ Carroll Ln off-ramp

Phase 2 – Eastbound Off-Ramp to Kostoryz Road/Carroll Lane

  • Relocate eastbound off-ramp serving

Kostoryz Road and Carroll Lane:

– Build new off-ramp near Richter Street, west of existing off-ramp – Improve drainage along frontage road – Permanently close existing off-ramp

  • Purpose:

– Improve safety and mobility for eastbound mainlane and frontage road drivers approaching the Kostoryz Road intersection.

  • Anticipated closures:

– Off-peak closures of inside eastbound frontage road lane

8

slide-9
SLIDE 9

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 2 – Eastbound Frontage Road Between Kostoryz Road and Weber Road

  • Widen eastbound frontage road near existing

ramps adjacent to Cosner Drive and Wilkinson Drive:

– Add new sidewalks and curbs/gutters – Add 3rd eastbound lane on frontage road east

  • f Wilkinson Drive
  • Purpose: Accommodate future ramp reversal

and widened eastbound mainlanes

  • Anticipated closures:

– Off-peak closures of outside eastbound frontage road lane – Potential temporary closures:

  • Cosner Drive and Wilkinson Drive
  • Driveways (e.g. Bethel, Sames)
  • Additional closures across eastbound frontage road

near Wilkinson Drive for drainage pipe installation

9

Existing ramps near Cosner Dr and Wilkinson Dr

slide-10
SLIDE 10

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Existing ramps near Oakhurst Dr and Embassy Dr

Phase 2 – Eastbound Frontage Road Between Weber Road and Everhart Road

  • Widen eastbound frontage road near existing

ramps adjacent to Oakhurst Drive and Embassy Drive:

– Add new sidewalks and curbs/gutters – Extend 3rd eastbound lane on frontage road to/from freeway ramps

  • Purpose: Accommodate future ramp reversal and

widened eastbound mainlanes

  • Anticipated closures:

– Off-peak closures of outside eastbound frontage road lane – Potential temporary closures:

  • Oakhurst Drive and Embassy Drive
  • Most driveways (e.g. La Playa, Cesar Chavez, Academy)
  • Some closures across eastbound frontage road near

both Oakhurst Drive and Embassy Drive for drainage pipe installation

– Permanent closure of one redundant driveway east

  • f Embassy Drive

10

slide-11
SLIDE 11

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Existing ramps near the Academy store and Moore Plaza shopping center

Phase 2 – Eastbound Frontage Road Between Everhart and South Staples

  • Widen eastbound frontage road near existing

ramps adjacent to the Academy store and Moore Plaza shopping center:

– Add new sidewalks and curbs/gutters – Extend 3rd eastbound lane on frontage road to/from freeway ramps

  • Purpose: Accommodate future ramp reversal

and widened eastbound mainlanes

  • Anticipated Closures:

– Off-peak closures of outside eastbound frontage road lane as needed – Potential temporary closures:

  • Blanche Moore Drive
  • Driveways (e.g. On the Border, Romano’s)
  • Some closures across eastbound frontage road near

both Blanche Moore Drive and the Academy store for drainage pipe installation

11

slide-12
SLIDE 12

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 2 – Eastbound Frontage Road near Airline Road

  • Widen and improve eastbound frontage road

near existing Airline Road on-ramp:

– Add new sidewalks and curbs/gutters – Add new inlets and pipe to improve drainage at Airline Road intersection

  • Purpose: Increase eastbound frontage road

capacity and improve safety near Airline Road

  • Anticipated closures:

– Off-peak closure of outside eastbound frontage road lane as needed – Potential temporary closures:

  • Across eastbound frontage road near Golden Corral

restaurant for drainage pipe installation

  • Across all lanes of eastbound frontage road and

Airline Road intersection

12

slide-13
SLIDE 13

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Construction Sequencing – Phase 3 Overview

  • Widen eastbound mainlane bridges to four

lanes at Kostoryz Road and Carroll Lane

  • Widen eastbound mainlanes and reconstruct

median between the eastbound mainlanes and frontage road from Everhart Road to South Staples Street

  • Widen eastbound frontage road and

construct sidewalks between South Staples Street and Airline Road

13

slide-14
SLIDE 14

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 3 – Eastbound Mainlane Bridge at Kostoryz Road

  • Widen eastbound mainlane bridge at

Kostoryz Road

  • Purpose: Accommodate four mainlanes
  • Anticipated closures and detours:

– Off-peak closures of Kostoryz Road intersection – Potential temporary closure of westbound-to- eastbound turnaround under bridge – Potential temporary detours of Kostoryz Road/frontage road traffic to adjacent intersections and turnarounds

14

An additional lane will be built

  • n the eastbound mainlane

bridges at Kostoryz, Carroll, Weber, Everhart, and Staples.

slide-15
SLIDE 15

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 3 – Eastbound Mainlane Bridge at Carroll Lane

  • Widen eastbound mainlane bridge at

Carroll Lane

  • Purpose: Accommodate four mainlanes

and prepare for Weber Road off-ramp relocation

  • Anticipated closures and detours:

– Potential off-peak closure of Carroll Lane intersection – Potential temporary closure of westbound-to- eastbound turnaround under bridge – Potential temporary detours of Carroll Lane/ frontage road traffic to adjacent intersections and turnarounds

15

slide-16
SLIDE 16

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Existing Weber Rd

  • ff-ramp

New Weber Rd

  • ff-ramp to be

built farther west

Phase 3 – Eastbound Weber Road Off-Ramp

  • Build new off-ramp farther west of existing
  • ff-ramp
  • Improve drainage along frontage road
  • Purpose: Improve safety and mobility for

eastbound mainlane and frontage road drivers approaching the Weber Road intersection.

  • Anticipated closures:

– Off-peak closures of inside eastbound frontage road lane – Permanently close existing off-ramp

16

slide-17
SLIDE 17

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 3 - Eastbound Mainlanes/Frontage Road from Everhart to South Staples

  • Widen eastbound mainlanes, including

drainage upgrade, between the two existing ramps adjacent to the Academy store and Moore Plaza shopping center

  • Reconstruct median between the

eastbound mainlanes and frontage road, including adding new curbs/gutters

  • Install high-mast lighting
  • Purpose: Accommodate future ramp

reversal

  • Anticipated closures and detours:

– None

17

Current high-mast lighting structures along SH 358

slide-18
SLIDE 18

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 3 – Eastbound Frontage Road East of South Staples Street

  • Widen eastbound frontage road near

existing off-ramp east of South Staples Street:

– Add new sidewalks and curbs/gutters

  • Purpose: Accommodate future widening of

the eastbound mainlanes

  • Anticipated closures:

– Off-peak closure of outside eastbound frontage road lane as needed – Potential temporary closures:

  • Manor Drive
  • Driveways (e.g. mattress stores)

18

slide-19
SLIDE 19

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Construction Sequencing – Phase 4 Overview

  • Reconstruct on-ramp from Kostoryz Road to

eastbound mainlanes

  • Widen eastbound mainlane bridges to four

lanes at the following intersections:

– Weber Road – Everhart Road – South Staples Street

19

slide-20
SLIDE 20

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 4 – Eastbound On-Ramp from Kostoryz Road

  • Reconstruct eastbound on-ramp from

Kostoryz Road:

– Reconstruct median between mainlanes and frontage road, add new barriers and curbs/gutters – Improve drainage

  • Purpose: Accommodate future widening of

the eastbound mainlanes

  • Anticipated closures and detours:

– Temporary closure of existing on-ramp – Temporary detour of eastbound Kostoryz Road freeway on-ramp traffic to the on-ramp after Carroll Lane and Weber Road

20

slide-21
SLIDE 21

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 4 – Mainlane Bridges at Weber, Everhart, and South Staples

  • Widen eastbound mainlane bridges over

Weber Road, Everhart Road, and South Staples Street

  • Purpose: Accommodate four mainlanes on

bridges

  • Anticipated closures and detours:

– Potential off-peak closure of each intersection and turnarounds as needed for bridge construction – Detours of frontage road traffic to adjacent intersections/turnarounds

21

An additional lane will be built

  • n the eastbound mainlane

bridges at Kostoryz, Carroll, Weber, Everhart, and Staples.

slide-22
SLIDE 22

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Construction Sequencing – Phase 5A and 5B Overview

  • Reconstruct mainlane shoulders and center

median barrier between Ayers Street and Carroll Lane

  • Construct temporary eastbound off-ramp to

Everhart Road:

– Note: this will not open until Phase 6

  • Reverse ramps between Everhart Road and

South Staples Street

22

slide-23
SLIDE 23

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 5A – Eastbound Mainlanes Between Ayers Street and Carroll Lane

  • Reconstruct mainlane shoulders

and construct permanent center median barrier

  • Purpose: Accommodate four permanent

eastbound mainlanes

  • Anticipated Closures:

– Off-peak closures of inside mainlanes

23

Permanent center median barrier and shoulder reconstruction will allow for four travel lanes. Workers perform initial upgrades on the SH 358 mainlane bridges.

TxDOT Photo

slide-24
SLIDE 24

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phases 5A/5B – Eastbound Ramps Between Everhart and South Staples

  • Reverse eastbound ramps between Everhart

Road and South Staples Street

  • Purpose: Improve safety and mobility along the

eastbound mainlanes and frontage road approaching the South Staples Street intersection

  • Anticipated Closures and Detours:

– Close existing eastbound on-ramp from Everhart Road, and replace with new off-ramp to South Staples Street (Phase 5A) – Temporarily detour eastbound on-ramp traffic to the ramp after South Staples Street (Phase 5A) – Close existing eastbound off-ramp to South Staples Street, and replace with new on-ramp from Everhart Road (Phase 5B)

  • Upon completion, traffic flow will resemble the

existing westbound freeway ramps between South Staples Street and Everhart Road

24

Existing off-ramp to S Staples St will become on-ramp from Everhart Rd Existing on-ramp from Everhart Rd will become off-ramp to S Staples St

slide-25
SLIDE 25

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Construction Sequencing – Phase 6A and 6B Overview

  • Widen eastbound mainlanes and

reconstruct median barrier between the eastbound mainlanes and frontage road from Everhart Road to South Staples Street (started in Phase 3)

  • Reverse ramps between Weber

Road and Everhart Road

  • Reconstruct eastbound off-ramp

to Airline Road in steps to avoid temporary detour

25

slide-26
SLIDE 26

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 6A – Eastbound Ramps Between Weber Road and Everhart Road

  • Reverse eastbound ramps between Weber

Road and Everhart Road

  • Purpose: Improve safety and mobility along

the eastbound mainlanes and frontage road approaching the Everhart Road intersection

  • Upon completion, traffic flow will resemble

the existing westbound freeway ramps between Everhart Road and Weber Road

26

Existing off-ramp to Everhart Rd will become on-ramp from Weber Rd Existing on-ramp from Weber Rd will become off-ramp to Everhart Rd

slide-27
SLIDE 27

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 6A – Eastbound Ramps Between Weber Road and Everhart Road (cont.)

  • Anticipated Closures and Detours:

– Close existing eastbound off-ramp to Everhart Road, diverting traffic to temporary off-ramp constructed in Phase 5A – Construct new eastbound on-ramp from Weber Road in the location of the former Everhart Road off-ramp and close existing eastbound

  • n-ramp from Weber Road, temporarily

detouring traffic to new on-ramp after Everhart Road – Construct new eastbound off-ramp to Everhart Road in the location of the former Weber Road

  • n-ramp, and permanently shift traffic to it
  • nce complete

27

Existing off-ramp to Everhart Rd will become on-ramp from Weber Rd Existing on-ramp from Weber Rd will become off-ramp to Everhart Rd

slide-28
SLIDE 28

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 6B – Eastbound Mainlanes Between Carroll Lane and Weber Road

  • Reconstruct mainlane shoulders

and construct permanent center median barrier

  • Purpose: Accommodate four permanent

eastbound travel lanes

  • Anticipated closures:

– Off-peak closures of inside mainlanes

28

slide-29
SLIDE 29

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phase 6B – Off-Ramp to Airline Road

  • Reconstruct eastbound off-ramp to

Airline Road:

– Add new curbs/gutters – Improve drainage

  • Purpose: Improve safety and mobility for

traffic exiting the freeway at Airline Road

  • Anticipated Closures and Detours:

– Periodic temporary closure of existing on-ramp and frontage road lanes for new drainage pipe construction – Wide loads limited during staged ramp reconstruction – Alternate routes to be provided during any detours

29

Airline Rd

The eastbound off-ramp to Airline Road will remain open during reconstruction, though the ramp width will be temporarily narrowed.

slide-30
SLIDE 30

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Construction Sequencing – Phases 7A–7C Overview

  • Complete mainlane shoulder and median

barrier reconstruction from Weber Road to east of Airline Road

  • Complete eastbound mainlane bridge

rehabilitation from Kostoryz Road to Airline Road

30

Workers perform initial upgrades on the SH 358 mainlane bridges.

TxDOT Photo

slide-31
SLIDE 31

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Phases 7A–7C – Eastbound Mainlanes

  • Reconstruct mainlane shoulders and construct

permanent center median barrier between:

– Weber Road and South Staples Street (Phase 7A) – South Staples Street and east of Airline Road (Phase 7B)

  • Rehabilitate pavement on eastbound mainlane bridges

at:

– Kostoryz Road (Phase 7B) – Carroll Lane (Phase 7B) – Weber Road (Phase 7B) – Everhart Road (Phase 7B) – South Staples Street (Phases 7B and 7C) – Airline Road (Phase 7C)

  • Purpose: Improve and accommodate four permanent

eastbound travel lanes from Ayers Street to just east of Airline Road

  • Anticipated Closures:

– Off-peak closures of inside mainlanes

31

slide-32
SLIDE 32

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Construction Sequencing – Phases 8–10

  • Phase 8: Repave eastbound mainlanes

between Ayers Street and Nile Drive

  • Phase 9:

– Install lane striping/markings on new eastbound mainlane pavement – Repave eastbound frontage road

  • Phase 10:

– Install lane striping/markings on new eastbound frontage road pavement – Perform project wrap-up duties

32

slide-33
SLIDE 33

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

About This Project

This transportation improvement project of the Texas Department of Transportation is funded with taxpayer dollars to improve safety and mobility and decrease congestion in Corpus Christi, the 8th largest city in Texas. Bay, Ltd. is the General Contractor, with Construction Engineering and Inspection (CEI) services provided by AIA Engineers.

33

slide-34
SLIDE 34

SH 358 Improvements – Corpus Christi District Updated October 2018 All dates & schedules are subject to change

Cross-Reference of Frontage Road Impacts near Major Intersections

  • Improvements near Richter Street:

– Slides 6, 8

  • Improvements near Kostoryz Road:

– Slides 6, 8, 9, 14, 20

  • Improvements near Carroll Lane:

– Slides 9, 15, 16, 20

  • Improvements near Weber Road:

– Slides 9, 10, 16, 21, 26, 27

  • Improvements near Everhart Road:

– Slides 10, 11, 17, 21, 24, 26, 27

  • Improvements near South Staples Street:

– Slides 11, 17, 18, 21, 24, 29

  • Improvements near Airline Road:

– Slides 12, 18, 29