SH 288 Toll Lanes Project Disadvantaged Business Enterprise Opportunities www.Drive288.com 4212 Almeda, Houston July 27, 2016 Agenda DBE Ready Employment Opportunities SH 288 Project Opportunities v 3 Months Look Ahead Corpus


slide-1
SLIDE 1

SH 288 Toll Lanes Project

Disadvantaged Business Enterprise Opportunities

4212 Almeda, Houston July 27, 2016

www.Drive288.com

slide-2
SLIDE 2

üDBE Ready üEmployment Opportunities üSH 288 Project Opportunities

v3 Months Look Ahead

üCorpus Christi Project Opportunities

Agenda

www.Drive288.com

slide-3
SLIDE 3

v COMMERCIALLY USEFUL FUNCTION– CUF

ØA DBE is responsible for the execution of a distinct element of work and carries out its responsibilities by actually performing, managing and supervising the work using its own labor and equipment. ØA DBE does not perform a CUF if its role is limited to that of an extra participant in a transaction, contract,

  • r project through which funds are passed in order to
  • btain the appearance of DBE participation.

DBE CUF

www.Drive288.com

slide-4
SLIDE 4

49 CFR 26.55 – Regular Dealers

v Must be an established, regular business that engages, as its principal business and under its own name, in the purchase, sale or lease of the products in general v Is a firm that owns, operates or maintains a store, warehouse

  • r other establishment in which the materials, supplies,

articles or equipment are bought, kept in stock, & regularly sold or leased to the public v A regular dealer has a regular trade with a variety of customers v There should be a presence of inventory of materials and or supplies v A regular dealer assumes the actual and contractual responsibility for the provisions of the material and or supplies

www.Drive288.com

slide-5
SLIDE 5

49 CFR 26.55 - Manufacturer

v Manufacturers Is a firm that operates or maintains a factory or establishment that produces, on premises, the materials, supplies, articles or equipment

  • Concrete ready mix plant
  • Crushing operation
  • Steel or concrete fabricating plant

www.Drive288.com

slide-6
SLIDE 6

ØNorth American Industry Classification System – Review and update your NAICS Codes ØDoing Business As – DBA

– Must be on your DBE Certification

ØUpdate Phone # and Email Address

DBE Notes – F.Y.I

www.Drive288.com

slide-7
SLIDE 7

Employment Opportunities

www.Drive288.com

  • Receptionist
  • Administrative Assistant – Procurement
  • Environmental Inspector
  • Field Engineer (Drainage & Utilities)
  • Field Engineers (Roadway & Structural)
  • Segment Engineer (North)
  • Segment Manager (South)
  • Superintendents (General) 4
  • Superintendents (Bridges) 10
  • Survey Field Crew Leaders & Rodman
slide-8
SLIDE 8

Blueridge Transportation Group

Almeda-Genoa Constructors Joint Venture (A-GC JV)

Developer DB-JV Owner

www.Drive288.com

slide-9
SLIDE 9

Design Build Team

www.Drive288.com

slide-10
SLIDE 10

IH610 BW8 Texas Medical Center Houston

PROJECT LOCATION

US 59 North Terminus Point of the Project IH 610 Multi Level Interchange Sam Houston Toll Road South Crossing over SH 288 Clear Creek/Brazoria County Line South Terminus Point of the Project

www.Drive288.com

slide-11
SLIDE 11

Project Profile

www.Drive288.com

slide-12
SLIDE 12

ü 10.3-mile section of SH288 from US 59 to Harris Co. line at Clear Creek ü Design & Construction Cost $815 million ü New Pavement is continually reinforced concrete pavement ü Asphalt overlay all pavements not reconstructed

SH 288 TOLL LANES PROJECT in Harris County

Project Overview

www.Drive288.com

slide-13
SLIDE 13

ü Adding two direct connect ramps for The Medical Center at Holcombe

  • Blvd. intersection

ü IH610/SH288 interchange will be demolished and reconstructed ü The Beltway 8/SH288 interchange will get new direct connect ramps in all

directions – over 5.5 miles of direct connect ramps

ü Approximately 34 other bridges – crossing roadway and bayous

SH 288 TOLL LANES PROJECT in Harris County

Project Overview

www.Drive288.com

slide-14
SLIDE 14

3 Months Look Ahead

www.Drive288.com

v Yard Site & Offices

Ø Clearing Ø Grading & base parking area Ø Utilities (electric, water & sewer) Ø Fencing Ø Security Ø Janitorial Ø Dumpsters Ø Portable Toilets Ø Ice Ø Safety Supplies

slide-15
SLIDE 15

3 Months Look Ahead

www.Drive288.com

v Roadway

Ø Barricades supplies & service Ø Clearing and grubbing Ø Storm drains – subcontract & materials Ø Sound walls

slide-16
SLIDE 16

3 Months Look Ahead

www.Drive288.com

v Bridges

Ø Roadway bridge packages Ø Lumber Ø Crane mats Ø Permanent metal decking Ø Sealed expansion joints Ø Deck grooving Ø Overhang jacks Ø Miscellaneous concrete supplies

slide-17
SLIDE 17

Thank you for attending!