SH 288 Toll Lanes Project Disadvantaged Business Enterprise - - PowerPoint PPT Presentation

sh 288 toll lanes project
SMART_READER_LITE
LIVE PREVIEW

SH 288 Toll Lanes Project Disadvantaged Business Enterprise - - PowerPoint PPT Presentation

SH 288 Toll Lanes Project Disadvantaged Business Enterprise Opportunities www.Drive288.com April 1 st 201 7 Agenda What/Who is a DBE DBE Ready Commercially Useful Function SH 288 Project Opportunities Corpus Christi Project


slide-1
SLIDE 1

SH 288 Toll Lanes Project

Disadvantaged Business Enterprise Opportunities

www.Drive288.com

April 1st 2017

slide-2
SLIDE 2

What/Who is a DBE DBE Ready – Commercially Useful Function SH 288 Project Opportunities Corpus Christi Project Opportunities

Agenda

www.Drive288.com

slide-3
SLIDE 3
  • What is a DBE
  • Disadvantage Business Enterprise

 A DBE is a for-profit small business concern that is at least 51 percent owned by one or more individual(s) who are both socially and economically disadvantaged

Explaining DBE

www.Drive288.com

slide-4
SLIDE 4

 COMMERCIALLY USEFUL FUNCTION– CUF

  • A DBE is responsible for the execution of a distinct

element of work and carries out its responsibilities by actually performing, managing and supervising the work using its own labor and equipment.

  • A DBE does not perform a CUF if its role is limited to

that of an extra participant in a transaction, contract,

  • r project through which funds are passed in order to
  • btain the appearance of DBE participation.

DBE CUF

www.Drive288.com

slide-5
SLIDE 5

49 CFR 26.55 – Regular Dealers

 Must be an established, regular business that engages, as its principal business and under its own name, in the purchase, sale or lease of the products in general  Is a firm that owns, operates or maintains a store, warehouse

  • r other establishment in which the materials, supplies,

articles or equipment are bought, kept in stock, & regularly sold or leased to the public  A regular dealer has a regular trade with a variety of customers  There should be a presence of inventory of materials and or supplies  A regular dealer assumes the actual and contractual responsibility for the provisions of the material and or supplies

www.Drive288.com

slide-6
SLIDE 6

49 CFR 26.55 - Manufacturer

 Manufacturers Is a firm that operates or maintains a factory or establishment that produces, on premises, the materials, supplies, articles or equipment

  • Concrete ready mix plant
  • Crushing operation
  • Steel or concrete fabricating plant

www.Drive288.com

slide-7
SLIDE 7
  • North American Industry Classification System

– Review and update your NAICS Codes

  • Doing Business As – DBA

– Must be on your DBE Certification

  • Update Phone # and Email Address

DBE Notes – F.Y.I

www.Drive288.com

slide-8
SLIDE 8

Potential Opportunities

www.Drive288.com

Item / Scope Estimated Release for Bid Estimate start date Estimated completion date

CONCRETE PAVING/ PULICE

Pulice May-17 Jul-19

ETC and ITS Services

BTC Jul-17 Jul-19

Electrical

Mica Apr-17 Jun-18

O&M

Jorgeson Oct-16 Sep-19

ASPHALT DETOURS

Nov-16 Dec-16 Sep-18

BRIDGE DECK GRINDING/GROOVING

Jul-17 Jul-17 Jun-19

BRIDGE RAIL

Jul-17 Aug-17 Jul-19

CONC FLATWORK

Oct-17 Nov-17 May-19

Crash Cushion Attenuators

Apr-19 May-19 Jun-19

Erosion Control Material ONLY PEDESTRIAN FENCE

Apr-18 May-18 Jul-18

Permanent metal decking

Jan-18 Feb-18 Oct-18

MSE Wall

Mar-17 Aug-17 Apr-19

SLIP FORM RAIL

Jul-17 Aug-17 Jul-19

SMALL BRIDGES

Apr-17 May-17 Apr-17

SOUND WALL

Apr-18 May-18 Apr-19

STRUCTURE PAINTING

Jan-19 Feb-19 Jul-19

Utility Relocate

Oct-17 Nov-17 Feb-18

Seeding / Errosion Control (temp & Perm)

Nov-17 Dec-17 Jul-18 Continues Throughout Project

slide-9
SLIDE 9

UPDATE YOUR INFORMATION

www.Drive288.com

slide-10
SLIDE 10

PROCUREMENT PROCEDURES

www.Drive288.com

slide-11
SLIDE 11

SMARTBID

www.Drive288.com

NAICS CODES CERTIFICATIONS EMAIL

slide-12
SLIDE 12

OPPORTUNITIES PAST

www.Drive288.com

slide-13
SLIDE 13

CHECK YOU INFORMATION

www.Drive288.com

slide-14
SLIDE 14

CURRENT NAICS CODE

www.Drive288.com

slide-15
SLIDE 15

NEEDS TO ADD

www.Drive288.com

slide-16
SLIDE 16

INSURANCE

www.Drive288.com

A requirement of our Contractors Development Agreement is for all contractors at all tier levels, who provide services or perform work at our location, to be insured and provide us with physical evidence of general liability insurance coverage, in an amount not less than $2,000,000 combined single limit, as well as verification of your current Workers’ Compensation coverage. Please have your insurance agent forward to the undersigned a general liability certificate of insurance. This certificate must list the names

  • f the insuring compan(ies), the policy numbers, effective dates, and limits of coverage specific to each
  • policy. Please see attachments for limits and additional instructions.

Contractors shall be allowed to meet the limit requirements through any combination of primary and excess/umbrella liability insurance. All primary commercial general liability insurance policies shall include a provision that the aggregate limit shall apply on a per project basis. Each such policy shall be primary and non-contributory and include a waiver of subrogation. Waiver of Subrogation in favor of all Additional Insureds

slide-17
SLIDE 17

CERTIFIED PAYROLLS

www.Drive288.com

slide-18
SLIDE 18

Davis-Bacon and Related Acts (DBRA)

www.Drive288.com

slide-19
SLIDE 19

Davis-Bacon and Related Acts (DBRA)

www.Drive288.com

slide-20
SLIDE 20

Contractor Roles, Responsibilities & Important Tips

www.Drive288.com

slide-21
SLIDE 21

Contractor Roles, Responsibilities & Important Tips

www.Drive288.com

slide-22
SLIDE 22

Follow us on….

http://www.Drive288.com

www.Drive288.com

slide-23
SLIDE 23

The End

www.Drive288.com

slide-24
SLIDE 24
slide-25
SLIDE 25
slide-26
SLIDE 26
slide-27
SLIDE 27
slide-28
SLIDE 28
slide-29
SLIDE 29