SLIDE 1
THE SYSTEM
- LEAVE IN PLACE SCREED RAIL SYSTEM
- SUPERIOR FLATNESS OF THE FLOOR COMPARED TO
OTHER METHODS
- REDUCE THE GRINDING TIME AND NO
FLOORSAWING NEEDED
- EASY TO GET REQUIRED SLOPES
- SAVES TIME AND LABOR = SAVES MONEY
SCREED RAIL SYSTEM THE SYSTEM LEAVE IN PLACE SCREED RAIL SYSTEM - - PowerPoint PPT Presentation
SCREED RAIL SYSTEM THE SYSTEM LEAVE IN PLACE SCREED RAIL SYSTEM SUPERIOR FLATNESS OF THE FLOOR COMPARED TO OTHER METHODS REDUCE THE GRINDING TIME AND NO FLOORSAWING NEEDED EASY TO GET REQUIRED SLOPES SAVES TIME AND LABOR =
OTHER METHODS
FLOORSAWING NEEDED
BEAM OR OTHER TYPE OF BEAM
ASSEMBLED COMBIFORM
NEED TO WAIT FOR THE BED BESIDE TO DRY
CAST METHODS
INDOOR & OUTDOOR
BUILDINGS
BUILDING COMPLEX
THE FLOOR
SCREED RAIL SYSTEM ON THE MARKET
JOBS USING FORMWORK WAS HALVED
INCREASE THE AMOUNT OF PROJECT WE MADE WITH 30% ANNUALLY.