Scaling up for large commercial Rob Brimblecombe with special guest - - PowerPoint PPT Presentation

Scaling up for large commercial Rob Brimblecombe with special guest Johanna Trickett monash.edu AUSTRALIA CHINA INDIA ITALY MALAYSIA SOUTH AFRICA Scaling up for large commercial Series of interim steps and proof of concepts 1.


slide-1
SLIDE 1

AUSTRALIA CHINA INDIA ITALY MALAYSIA SOUTH AFRICA

monash.edu

Scaling up for large commercial

Rob Brimblecombe with special guest Johanna Trickett

slide-2
SLIDE 2

Scaling up for large commercial

Series of interim steps and proof of concepts

  • 1. B56 – Proof of concept
  • 2. Financial models
  • 3. Building capacity
  • 4. Interim targets
  • 5. Putting it all together
slide-3
SLIDE 3

Proof ¡of ¡concept ¡

B56: ¡Proof ¡of ¡concept ¡

slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7

Integrated Design Team

  • At the table: Architect, Engineer, PM, Passive

House Advisor, Client, QS and Builder

  • Key design debates
  • The ¡thermal ¡and ¡air ¡6ght ¡layers ¡ ¡
  • Thermal ¡bridges ¡
  • Windows ¡
  • Heat ¡recovery ¡mechanical ¡system ¡ ¡
  • Solar ¡control ¡and ¡daylight ¡ ¡
  • Cost ¡and ¡Program ¡ ¡

¡

slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15

N ¡

slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18

Building 56 – Consumption vs Solar

  • 5

10 15 20 25 30

  • 1,000

1,000 3,000 5,000 7,000 9,000 11,000 13,000 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Monthly mean solar exposure (MJ/m2) Electricity consumption (kWh)

Rooftop Solar

Grid electricity Exported Solar Average solar exposure

slide-19
SLIDE 19

Office Energy Benchmarking

50 100 150 200 250 Code (Building H) Green Star Building 56 (kWh/m2 annum)

Grid demand Gas Solar ~90% reduction 27% reduction

slide-20
SLIDE 20

Lessons Learned

  • 1. Set a clear target and expectations from the start
  • 2. Need buy in from every part of the team
  • 3. Integrated design with early contractor engagement
  • 4. Design has to accommodate local market and

industry capability

  • 5. Need to educate all of the sub-contractors
  • 6. Some parts of the build will cost more than code
slide-21
SLIDE 21

Moving from concept to certification

  • 1. Building the value of Passive House
  • 2. Addressing perceived cost premium
  • 3. Building/finding design expertise in big firms
  • 4. Setting documentation expectations
  • 5. Building air tight construction experience
  • 6. Sourcing suitable products e.g. HRV
  • 7. Managing contractor risk premium
slide-22
SLIDE 22

Building Exposure for Passive House

  • 2016 Architecture and Design Sustainability Award in the large commercial category.
  • Green Gown Award: Built Environment - 16th International ACTS Conference
  • 2016 Premiers (Victorian) Sustainability Awards - Finalist
slide-23
SLIDE 23

5 ¡Star ¡Green ¡Star ¡ cost ¡premium ¡vs ¡ performance ¡ ¡

slide-24
SLIDE 24

Passive House – Perceived cost premium

  • 100,000

200,000 300,000 400,000 500,000 Jan-13 Jul-13 Jan-14 Jul-14 Briggs Jackomos Halls actual Passive House Equivalent kWh/month

Actual Green Star Capital Cost = $4,640 /m2 p.a. Energy cost = $14.60 /m2 p.a. Predicted Passive House Capital Cost = $4,570 /m2 p.a Energy cost = $5.30 /m2 p.a.

slide-25
SLIDE 25

Building Capability – Air Tightness

  • Detailing and testing on all fabric projects
  • ­‑ Tested ¡a ¡range ¡of ¡small ¡projects ¡
  • ­‑ Aiming ¡to ¡test ¡20,000m2 ¡building ¡later ¡this ¡year ¡
slide-26
SLIDE 26

Building Capacity – Documentation

Biomedical Teaching Building

■ Modeling in PHPP ■ Targeting 3 ACH50 ■ Targeting Ψ< 0.04W/mK ■ Briefed for 5 Star Green Star*

slide-27
SLIDE 27

Setting Documentation Expectations

Principle Project Requirements (PPRs)

slide-28
SLIDE 28

Facilitate Integrated Design

slide-29
SLIDE 29

Putting it all together

Technology Education (TEd) Building

  • 10,000m2 Engineering teaching & office
  • Passive House Certification and IEQ PPRs

included in tender

  • Certified Passive House Designers on team
  • Integrated design approach to Concept Design
slide-30
SLIDE 30

TEd Concept Design

Workshops discussed:

  • Benefits ¡for ¡the ¡project ¡ ¡
  • Design ¡for ¡construc6on ¡
  • Daylight ¡and ¡solar ¡control ¡ ¡
slide-31
SLIDE 31

Follow ¡us ¡on ¡ www.twi%er.com/Aurecon ¡ ¡ Join ¡us ¡on ¡ www.facebook.com/Aurecon ¡ ¡ Watch ¡us ¡on ¡ www.youtube.com/user/AureconGroup ¡ ¡ Follow ¡us ¡on ¡ www.instagram.com/Aurecon ¡ ¡ Follow ¡us ¡on ¡ www.linkedin.com/company/Aurecon ¡ ¡ Follow ¡us ¡on ¡ www.slideshare.net/Aurecon ¡

johanna.tricke%@aurecongroup.com ¡

slide-32
SLIDE 32

The ¡LENSES ¡ ¡ Framework ¡

CreaEng ¡Living, ¡RegeneraEve ¡Environments ¡

LENSES ¡Framework ¡

slide-33
SLIDE 33

ESD ¡

slide-34
SLIDE 34

138m ¡x ¡41m ¡x ¡18m ¡

Daylight ¡Model ¡Setup ¡

slide-35
SLIDE 35

Daylight ¡Modeling ¡– ¡Lower ¡Gournd ¡

slide-36
SLIDE 36

Daylight ¡Modelling ¡– ¡Upper ¡Floor ¡

Daylight ¡Modeling ¡– ¡Upper ¡Floor ¡ ¡

slide-37
SLIDE 37
slide-38
SLIDE 38
slide-39
SLIDE 39

TEd ¡Passive ¡House ¡Blog ¡

slide-40
SLIDE 40

First architectural render….

slide-41
SLIDE 41