Route 5 3 1 Term inus Route 5 3 1 Term inus I m provem ent Project Public I nform ation Meeting Septem ber 3 0 , 2 0 1 0 New York State Departm ent of Transportation I n Cooperation w ith The Federal Highw ay Adm inistration The Federal


slide-1
SLIDE 1

Route 5 3 1 Term inus Route 5 3 1 Term inus I m provem ent Project Public I nform ation Meeting Septem ber 3 0 , 2 0 1 0

New York State Departm ent of Transportation I n Cooperation w ith The Federal Highw ay Adm inistration The Federal Highw ay Adm inistration

slide-2
SLIDE 2

W elcom e and I ntroduction

Kevin Bush Regional Design Engineer g g g

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-3
SLIDE 3

Meeting Overview

Paul Moore Meeting Facilitator g

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-4
SLIDE 4

Project Overview

Dan Farrelly Project Design Engineer j g g

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-5
SLIDE 5

Route 5 3 1 Term inus

Potential Location Specific I m provem ents

Route 31 Improvements (Future) Consider median treatments to enhance safety between eastbound and westbound travel lanes Route 531 Terminus Improvements (2012) Partial Interchange with Route 36 g Route 36 / Colby Street (Future) Consider Roundabout or other safety improvements

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-6
SLIDE 6

Purpose and Needs Statem ent Purpose and Needs Statem ent

To improve safety by reducing the number To improve safety by reducing the number

and severity of accidents

To reduce congestion at the Route 531

terminus

To safely transition from a high speed

l l l expressway to a two-lane rural arterial

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-7
SLIDE 7

Route 5 3 1 / 3 6 Accident Diagram / g

Route 531 Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-8
SLIDE 8

Route 3 1 / 3 6 Accident Diagram / g

Route 31 Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-9
SLIDE 9

Alternatives Evaluated During Alternatives Evaluated During Project Scoping

  • At-Grade interchange
  • Grade Separated half diamond interchange
  • Grade Separated full diamond interchange

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-10
SLIDE 10

Route 3 1 I m provem ents from Route 3 1 I m provem ents from new Route 5 3 1 I nterchange to east of Route 2 6 0 to east of Route 2 6 0

Necessary to provide a safe transition

y p from the expressway to Route 31 Necessary to enhance safety from Gallup

Necessary to enhance safety from Gallup

Road to east of Route 260

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-11
SLIDE 11

Project Schedule Project Schedule

Public Hearing

Summer 2011 Summer 2011

Construction Construction

Spring 2013 thru Fall 2014

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-12
SLIDE 12

Presentation of Alternatives

Dave Balthaser Dave Balthaser Stantec Consulting

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-13
SLIDE 13

Half Diam ond Alternative

Route 3 1 Continuous

D i C t Driveway access Connector Roadway Modify Traffic Signal Signal Half Diamond Interchange Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-14
SLIDE 14

Full Diam ond Alternative Full Diam ond Alternative

Route 3 1 Com bined w ith Route 5 3 1

Cul-de-sac Modify Traffic Signal Cul-de-sac Full Diamond Interchange Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-15
SLIDE 15

Full Diam ond I nterchange Full Diam ond I nterchange

Route 5 3 1 / Route 2 5 9 View

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-16
SLIDE 16

Route 3 1 I m provem ents Route 3 1 I m provem ents Route 3 1 I m provem ents Route 3 1 I m provem ents

Gallup Road to Salm on Creek Road Gallup Road to Salm on Creek Road

CARDs ROW w/o Access Third center turn lane Raised median Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-17
SLIDE 17

Route 3 1 I m provem ents

R t 3 6 t t f G ll R d Route 3 6 to east of Gallup Road

  • Widen Route 31 on the south, for a raised median
  • Acquire Right of Way without access (no driveways)

q g y ( y ) from the new interchange to Gallup Road

  • Hubbell Road Access – currently under discussion with

Monroe County) y)

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-18
SLIDE 18

Route 3 1 I m provem ents

G ll R d t S l C k R d Gallup Road to Salm on Creek Road

  • Widen Route 31 to provide a center turn lane and turn

pockets for the intersections and improve residential pockets for the intersections and improve residential driveway access

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-19
SLIDE 19

Route 3 1 I m provem ents

S l C k t R t 2 6 0 Salm on Creek to Route 2 6 0

  • Provide Centerline Audible Roadway Delineators

(CARDs) between traffic flow from Salmon Creek Road (CARDs) between traffic flow from Salmon Creek Road to Campbell Road.

  • CARDs placed where the double yellow lines are used
  • Reduce sideswipe and head-on accidents
  • Reduce sideswipe and head on accidents

Campbell Road CARDs

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-20
SLIDE 20

Discussion of the Tw o Discussion of the Tw o Alternatives and Route 3 1 I m provem ents

Paul Moore Paul Moore Meeting Facilitator

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-21
SLIDE 21

Discussion of the Half Discussion of the Half Diam ond Alternative

Pads of Paper & Pencils

  • Pads of Paper & Pencils
  • Verification of the design

Verification of the design

  • Introduce yourself to your neighbor

y y g

  • Discussion with your neighbor
  • Complete forms, pass to the center

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-22
SLIDE 22

Half Diam ond Alternative Half Diam ond Alternative

Route 3 1 Continuous

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-23
SLIDE 23

Discussion of the Full Diam ond Discussion of the Full Diam ond Alternative

  • Pads of Paper & Pencils
  • Pads of Paper & Pencils
  • Verification of the design

g

  • Introduce yourself to your neighbor
  • Discussion with your neighbor
  • Complete forms, pass to the center

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-24
SLIDE 24

F ll Di d Alt ti R t 3 1 Full Diam ond Alternative Route 3 1 com bined w ith Route 5 3 1

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-25
SLIDE 25

Discussion of the Route 3 1 Discussion of the Route 3 1 I m provem ents

Pads of Paper & Pencils

  • Pads of Paper & Pencils
  • Verification of the design

Verification of the design

  • Introduce yourself to your neighbor

y y g

  • Discussion with your neighbor
  • Complete forms, pass to the center

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-26
SLIDE 26

Route 3 1 I m provem ents Route 3 1 I m provem ents

Gallup Road to Salm on Creek Road

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-27
SLIDE 27

Panel Question and Answ ers Panel Question and Answ ers

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0

slide-28
SLIDE 28

Thank You for Your Participation Tonight

Adjourn to Design Tables with any additional questions you have y q y

Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0