rehabilitation of pedestrian ramps at designated
play

Rehabilitation of Pedestrian Ramps at Designated Locations Project - PowerPoint PPT Presentation

Rehabilitation of Pedestrian Ramps at Designated Locations Project Project ID: HWPR18M Community Board 8 Transportation Committee May 1, 2019 Manhattan Borough President Gale Brewer Lorraine Grillo Commissioner Project Data Project ID:


  1. Rehabilitation of Pedestrian Ramps at Designated Locations Project Project ID: HWPR18M Community Board 8 Transportation Committee May 1, 2019 Manhattan Borough President Gale Brewer Lorraine Grillo Commissioner

  2. Project Data Project ID: HWPR18M Bid Date: March 19, 2018 Registered Date: July 23, 2018 Notice To Proceed: March 25, 2019 Contractor: Oliveira Contracting, INC. Contract Value: $6,878,230 Contract Duration: 545 days Completion date: Fall 2020 Federal/State Fund: Yes Registration No: 20191402042 261 W 35 th Street, 3 rd Floor Field Office: New York, NY 10001 Project ID: HWPR18M

  3. Scope of Work Work Will Include: Installation of: Concrete, steel-faced & granite curbs, pedestrian curbs, pedestrian ramps, • concrete sidewalks. Pavement key at pedestrian Ramps. • Restoration of: Roadway adjacent to newly constructed curbs. • Pruning and protection of: Trees • Project ID: HWPR18M

  4. Work Hours City DOT Approved Permit Hours: • 7:00 AM- 6:00 PM Monday- Friday • 9AM-2PM Near Schools • There is no weekend hours at this time. Locations within CB8 • Work will take place at various corners of 3 rd Avenue from East 65 th Street to East 90th Streets. • Locations will be added by NYC DOT as work progresses. Project ID: HWPR18M • Hours of work: As per NYCDOT permit stipulations

  5. Project Map and Locations • Locations will be added SW/NW Corner of 3 rd Avenue and E. 90 th Street. NW/SE Corner of 3 rd Avenue and E. 71 st St. SW/ Corner of 3 rd Avenue and E. 87 th St. NW/NE Corner of 3 rd Avenue and E.70 th St. NS/SE Corner of 3 rd Avenue and E.65 th St SW/SE/NE Corner of 3 rd Avenue and E. 81 st St. Project ID: HWPR18M

  6. Work Operations Type of Work: • Installation of approximately a 3’ to 6’ wide by 1 - 1/2” deep pavement key in the roadway along proposed curb and in additional areas where and as directed by the Engineer • Installation of Pedestrian Ramps with pigmented and unpigmented concrete sidewalk, embedded preformed detectable warning units and steel faced concrete curb. • Installation of approximately a 3’ to 6’ wide by 1 - 1/2” deep wearing course in the roadway adjacent to new curb, and in possible additional areas. • Possible relocation, modification and/or adjustments of existing drainage structures, hydrants, fire alarm facilities, and street lighting and traffic signal facilities. Project ID: HWPR18M

  7. Existing Picture Northwest Corner of E. 71 st Street and 3 rd Avenue W. 34 th STREET & 8 TH AVENUE LOOKING WEST Project ID: HWPR18M

  8. Final result of finished Pedestrian Ramp Example • W. 34 th STREET & 8 TH AVENUE LOOKING WEST Project ID: HWPR18M

  9. Community Impacts & What to Expect • DDC is committed to maintaining a work site that is safe and clean. • Pedestrian access will be maintained during construction. • Resident Engineer will monitor operations and work within Noise Code regulations. • Sidewalk and/or loading dock access from the curb may be temporarily restricted while work is conducted (coordination will be arranged on a case by case basis) • Parking may be temporarily restricted during construction. Maintenance and Protection of Traffic (MPT) • A minimum of three (3) Interlocking pedestrian steel barricades shall be fastened together for stabilization, as directed by the Engineer. • At heavy pedestrian traffic locations, a pedestrian walkway is to be provided. • A flag person will be present as needed • Traffic Safety Devices are to be installed prior to start of work and maintained until work is completed. Project ID: HWPR18M 9

  10. Maintenance and Protection of Traffic (MPT) W. 34 th STREET & 8 TH AVENUE LOOKING WEST Project ID: HWPR18M

  11. Community Impacts Continued NYC DDC Community Notification: • 72-Hour Advance Startup Advisory will be provided • Weekly Construction Bulletin showing an anticipated work schedule for the following week. Special Needs: • The DDC staff will work specifically with individuals that have special needs who may be uniquely impacted by the project. Please reach out to the project contact. Project ID: HWPR18M 11

  12. No Parking Notice Project ID: HWPR18M 12

  13. Community Advisory Project ID: HWPR18M 13

  14. Community Advisory Project ID: HWPR18M 14

  15. Weekly Look Ahead Project ID: HWPR18M 15

  16. Keeping You Informed • Eliana Perez-Gaviria will be the Community Construction Liaison (CCL) assigned to this project. Ms. Perez will be responsible for keeping the community engaged & informed by: – Being the first point of contact (Outreach, Communication) – Identifying & Coordinating (Attempt to mitigate construction impacts) – Providing regular updates in advance (Stakeholders may better plan) • CCL contact information: – Name: Eliana Perez-Gaviria – Email: hwpr18mccl@gmail.com 261 West 35 th Street, Suite 307, New York, NY 10001 – Field Office: – Telephone : (212) 967-1020 • DDC Website: www.nyc.gov/ddc • DDC Video: www.nyc.gov/webuild • During Non-Working hours, please call 311 and give the Project ID: HWPR18M Project ID: HWPR18M 16

  17. Thank you Lorraine Grillo Commissioner

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.