Rehabilitation of Pedestrian Ramps at Designated Locations Project Project ID: HWPR18M Community Board 8 Transportation Committee May 1, 2019 Manhattan Borough President Gale Brewer Lorraine Grillo Commissioner Project Data Project ID:


slide-1
SLIDE 1

Rehabilitation of Pedestrian Ramps at Designated Locations Project Project ID: HWPR18M Community Board 8 Transportation Committee May 1, 2019

Manhattan Borough President Gale Brewer

Lorraine Grillo Commissioner

slide-2
SLIDE 2

Project Data

Project ID: HWPR18M Project ID: HWPR18M Bid Date: March 19, 2018 Registered Date: July 23, 2018 Notice To Proceed: March 25, 2019 Contractor: Oliveira Contracting, INC. Contract Value: $6,878,230 Contract Duration: 545 days Completion date: Fall 2020 Federal/State Fund: Yes Registration No: 20191402042 Field Office: 261 W 35th Street, 3rd Floor New York, NY 10001

slide-3
SLIDE 3

Work Will Include: Installation of:

  • Concrete, steel-faced & granite curbs, pedestrian curbs, pedestrian ramps,

concrete sidewalks.

  • Pavement key at pedestrian Ramps.

Restoration of:

  • Roadway adjacent to newly constructed curbs.

Pruning and protection of:

  • Trees

Scope of Work

Project ID: HWPR18M

slide-4
SLIDE 4

City DOT Approved Permit Hours:

  • 7:00 AM- 6:00 PM Monday- Friday
  • 9AM-2PM Near Schools
  • There is no weekend hours at this time.

Locations within CB8

  • Work will take place at various corners of 3rd Avenue from East 65th Street to East 90th

Streets.

  • Locations will be added by NYC DOT as work progresses.
  • Hours of work: As per NYCDOT permit stipulations

Work Hours

Project ID: HWPR18M

slide-5
SLIDE 5

Project Map and Locations

  • Locations will be added

Project ID: HWPR18M

NW/SE Corner of 3rd Avenue and E. 71st St. SW/NW Corner of 3rd Avenue and E. 90th Street. NS/SE Corner of 3rd Avenue and E.65th St NW/NE Corner of 3rd Avenue and E.70th St. SW/SE/NE Corner of 3rd Avenue and

  • E. 81st St.

SW/ Corner of 3rd Avenue and E. 87th St.

slide-6
SLIDE 6

Work Operations

Project ID: HWPR18M

Type of Work:

  • Installation of approximately a 3’ to 6’ wide by 1-1/2” deep pavement key in the

roadway along proposed curb and in additional areas where and as directed by the Engineer

  • Installation of Pedestrian Ramps with pigmented and unpigmented concrete

sidewalk, embedded preformed detectable warning units and steel faced concrete curb.

  • Installation of approximately a 3’ to 6’ wide by 1-1/2” deep wearing course in the

roadway adjacent to new curb, and in possible additional areas.

  • Possible relocation, modification and/or adjustments of existing drainage structures,

hydrants, fire alarm facilities, and street lighting and traffic signal facilities.

slide-7
SLIDE 7

Project ID: HWPR18M

  • W. 34th STREET & 8TH AVENUE LOOKING WEST

Existing Picture Northwest Corner of E. 71st Street and 3rd Avenue

slide-8
SLIDE 8

Final result of finished Pedestrian Ramp

  • Example

Project ID: HWPR18M

  • W. 34th STREET & 8TH AVENUE LOOKING WEST
slide-9
SLIDE 9
  • DDC is committed to maintaining a work site that is safe and clean.
  • Pedestrian access will be maintained during construction.
  • Resident Engineer will monitor operations and work within Noise Code regulations.
  • Sidewalk and/or loading dock access from the curb may be temporarily restricted

while work is conducted (coordination will be arranged on a case by case basis)

  • Parking may be temporarily restricted during construction.

Maintenance and Protection of Traffic (MPT)

  • A minimum of three (3) Interlocking pedestrian steel barricades shall be fastened together

for stabilization, as directed by the Engineer.

  • At heavy pedestrian traffic locations, a pedestrian walkway is to be provided.
  • A flag person will be present as needed
  • Traffic Safety Devices are to be installed prior to start of work and maintained until work is

completed.

9

Community Impacts & What to Expect

Project ID: HWPR18M

slide-10
SLIDE 10

Project ID: HWPR18M

  • W. 34th STREET & 8TH AVENUE LOOKING WEST

Maintenance and Protection of Traffic (MPT)

slide-11
SLIDE 11

NYC DDC Community Notification:

  • 72-Hour Advance Startup Advisory will be provided
  • Weekly Construction Bulletin showing an anticipated work schedule for the

following week. Special Needs:

  • The DDC staff will work specifically with individuals that have special needs

who may be uniquely impacted by the project. Please reach out to the project contact.

11

Community Impacts Continued

Project ID: HWPR18M

slide-12
SLIDE 12

12

No Parking Notice

Project ID: HWPR18M

slide-13
SLIDE 13

13

Community Advisory

Project ID: HWPR18M

slide-14
SLIDE 14

14

Community Advisory

Project ID: HWPR18M

slide-15
SLIDE 15

15

Weekly Look Ahead

Project ID: HWPR18M

slide-16
SLIDE 16
  • Eliana Perez-Gaviria will be the Community Construction Liaison (CCL) assigned to this
  • project. Ms. Perez will be responsible for keeping the community engaged & informed by:

– Being the first point of contact (Outreach, Communication) – Identifying & Coordinating (Attempt to mitigate construction impacts) – Providing regular updates in advance (Stakeholders may better plan)

  • CCL contact information:

– Name: Eliana Perez-Gaviria – Email: hwpr18mccl@gmail.com – Field Office: 261 West 35th Street, Suite 307, New York, NY 10001 – Telephone : (212) 967-1020

  • DDC Website:

www.nyc.gov/ddc

  • DDC Video:

www.nyc.gov/webuild

  • During Non-Working hours, please call 311 and give the Project ID: HWPR18M

16

Project ID: HWPR18M

Keeping You Informed

slide-17
SLIDE 17

Thank you

Lorraine Grillo Commissioner