CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE

Central Yavapai Metropolitan Planning Organization

Regional Transportation Plan 2011 Update Public Open House

March 28, 2012

slide-2
SLIDE 2

CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE

 CYMPO developed the Long

Range Transportation Plan (LRTP) in 2006.

 FHWA regulation requires all

MPO to update the LRTP every 5 years, if data is available

 Jurisdictional General Land Use

plans currently under revision/ update

 Economic uncertainty and fiscal

accountability

 Conditions conducive only to

verify or re-prioritize the adopted LRTP improvements to fulfill FHWA requirements

slide-3
SLIDE 3

CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE  CYMPO population growth from 2000 to

2010 shows increases varying from 14 % to 65 % by jurisdiction

 2010 Census Data will be used to

establish a new population forecast baseline

 Review the programmed short-term (2-5

years) improvements identified in the CYMPO LRTP and verify they are still viable and needed

 Identify usage of the limited funds for the

maximum benefit of the region

slide-4
SLIDE 4

CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE  The Plan so far….

2006 CYMPO LRTP ( 2006-2011) Projects Status to date

State Route 69 (ADOT) Several 6-lanes Segments were completed SR 69/SR 89 Interchange (ADOT) Completed State Route 89A (ADOT) Completed - TI at Viwepoint Drive and Granite Dell Parkway SR 89A/SR 89 Interchange (ADOT) Completed State Route 89 (ADOT) Completed - Reconstructed as four-lane from milepost 324.3 to Center St. Fain Rd (ADOT) Under Construction - Completion early 2013 Great Western Blvd (Yavapai County) Study Completed - Great Western/Glassford Hill Extension Study (SR 89A to SR89 only) Williamson Valley Rd (Yavapai County) Portions Complete Pioneer Pkwy to north of Shadow Valley Ranch Rd: 4-lanes North of Sidewinder Rd to Ironsprings Rd: 4-lanes Pioneer Pkway to 0.25 miles north of Pioneer Pkwy: 4-lanes Tribal Connector (Yavapai Apache Nation) Completed Side Rd (Prescott) Completed - 0.12 miles north of Centerpoint East Dr: Paved, 2-lanes Sundog Connector (Prescott) In Progress - Corridor Study New Facility from SR 169 to Lakeshore Dr (Yavapai County) Study Completed - SR 169 to Fain Rd Planning Study Chino Valley Bypass (Chino Valley) Study Completed - Chino Valley Extension Airport Loop Rd (Prescott) Study completed - Airport Area Transportation Plan Corridor Studies In Progress I-17 to Fain Rd Connector (Schedule to be completed Spring 2012) Willow Creek Rd/SR 89 Intersection Redesign State Route 89 (ADOT) Not Completed - Widen to 4-lanes from milepost 324.3 to SR 89A

slide-5
SLIDE 5

CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE

 Analyze 2010 Census population and

household data

 Identify current needs  Identify new 2030 population thresholds  Identify regional employment growth and

magnitude

 Identify needs and deficiencies using the new

2030 projections

 Verify if adopted LRTP improvements address

the new 2030 demand

 Review projects priorities

We Are Here

slide-6
SLIDE 6

CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE

Year 2010 Census

Prescott 39,843 Prescott Valley 38,822 Dewey-Humboldt 3,894 Chino Valley 10,817 Williamson CDP 5,438 CYMPO Planning Area 121,783 Total Influence Area 131,406

slide-7
SLIDE 7

CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE

 Severely congested roadways

  • SR 89 - SR 89A to Outer Loop Rd

 Moderately congested roadways

  • Portions of SR 69 from Robert Rd

to SR 89

slide-8
SLIDE 8

CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE

Population estimates from the Arizona Department of Administration (AZDoA)

10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 Prescott Prescott Valley Dewey- Humboldt Chino Valley Williamson CDP 2010 Census 2030 CYMPO 2030 AZDoA

Year 2010 Census Year 2030 CYMPO 2030 AZDoA Growth Rate

Prescott 39,843 62,245 68,099 2.81% Prescott Valley 38,822 64,703 70,739 3.33% Dewey-Humboldt 3,894 5,161 4,295 1.63% Chino Valley 10,817 19,038 30,286 3.80% Williamson CDP 5,438 9,640 9,814 3.86% CYMPO Planning Area 121,783 205,935 3.45% Total Influence Area 131,406 225,998 3.60%

slide-9
SLIDE 9

CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE

Severely congested roadways

  • SR 89 – Willow Lake Rd to Outer Loop Rd
  • Williamson Valley Rd – Pioneer Pkwy to Outer Loop Rd
  • Outer Loop Rd - Williamson Valley Rd to SR 89
  • SR 69 – Glassford Hill to Prescott Lakes Pkwy
  • SR 89A – Glassford Hill Rd to SR 89
  • Glassford Hill Rd – Lakeshore Dr to SR 89A
  • Viewpoint Dr – north of SR 89A
  • Willow Creek Rd – Willow Lake Rd to SR 89

Moderately congested roadways

  • SR 169 – I-17 to SR 69
  • Portions of SR 69 from Robert Rd to SR 89
  • Willow Creek Rd – Willow Lake Rd to SR 89
  • Willow Lake Rd – from Willow Creek Rd to SR 89
  • Pioneer Pkwy – Williamson Valley rd to Willow Creek Rd
  • Prescott Lakes Pkwy – SR 69 to SR 89
slide-10
SLIDE 10

CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE

Project number does not signify priority. It is used only as identifier between the list and the map

slide-11
SLIDE 11

CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE

Assess the improvements needed to

address current and future deficiencies

Verify if the 2012-2020 LRTP

improvements are still valid and needed

Review and re-prioritize projects

based on regional impact and funding availability

Present findings to the public Finalize project list by June 2012

slide-12
SLIDE 12

CYMPO REGIONAL TRANSPORTATION PLAN 2011 UPDATE

Questions ?