recently adopted wetland rule change
play

Recently Adopted Wetland Rule Change LAC Jurisdiction (Env-Wt - PowerPoint PPT Presentation

Recently Adopted Wetland Rule Change LAC Jurisdiction (Env-Wt 103.27): OLD - LAC jurisdiction means the authority conferred by RSA 483:8 -a. III upon a local river management advisory committee relative to activities within a designated


  1. Recently Adopted Wetland Rule Change LAC Jurisdiction (Env-Wt 103.27): • OLD - “LAC jurisdiction” means the authority conferred by RSA 483:8 -a. III upon a local river management advisory committee relative to activities within a designated river or river corridor, provided that for purpose of routine roadway maintenance activities conducted under an SPN, registration, PBN, or EXP, LAC jurisdiction shall be limited to activities in or within 250 feet of a Tier 2 or Tier 3 designated river that have a direct surface water connection to the designated river. • NEW 9/25/2020 - “LAC jurisdiction” means the authority conferred by RSA 483:8 -a, III upon a local river management advisory committee relative to activities within a designated river or river corridor, provided that for purpose of routine roadway maintenance activities conducted under an SPN, registration, PBN, or EXP, LAC jurisdiction shall be limited to activities located in or within 250 feet of a designated river where the activity will occur on a Tier 2 or Tier 3 stream that has a direct surface water connection to the designated river .

  2. New: LAC Jurisdiction for Routine Roadway Maintenance Activities 250 ft. 250 ft. Tier 3 stream with a direct surface water connection to the designated river Within LAC jurisdiction 250 Stream lacking a direct surface Tier 2 or 3 water connection Designated Project to the designated Tier 1 River river outside LAC stream jurisdiction Designated River

  3. Proposed Wetland Rule Changes Permi mit t Types es Cu Currentl rrently y Re Reviewed ewed Permi mit t Types es Propos oposed ed Forestry Forestry Trails Trails Ag Culvert Ag Culvert Statutory Permit by Statutory Permit by Notification (SPN) Notification (SPN) Expedited Permit Expedited Permit Dock Applications Applications Culvert Dock (EXP) (EXP) Utility Utility Emergency Emergency Culvert Authorizations Authorizations Routine Roadway Routine Roadway Registration Standard Permit Standard Permit Registration Applications Applications Lower-Scrutiny Approvals (LSA) Lower-Scrutiny Approvals (LSA) (STD) (STD) PBNs PBNs PBNs (19 Projects) (22 Projects) (3 Projects) Activities Activities authorized by authorized by rule rule

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend