PROGRAM VERIFICATION SCHEMATIC DESIGN DESIGN DEVELOPMENT - - PowerPoint PPT Presentation

9-22-16: 10-6-16 BUILDING PRELIMINARY REVIEW BOARD OF COMMISSION DOCUMENTS COMPLETE REGENTS MEETING. AUTHORITY TO 9-22-16: CONSTRUCT DESIGN REPORT COMPLETE PROGRAM VERIFICATION SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION


slide-1
SLIDE 1

Recreatjonal Eagle Center Additjon

Schedule | 1

September 15, 2016 DESIGNED FOR LIFE

SDS Architects, Inc.

DFD Project No. 14I2B

PROGRAM VERIFICATION

MAY 5, 2016: WORKSHOP #3: PROGRAM COMPLETE PRESENTATION

Verify Space:

▪ Size requirements ▪ Code needs ▪ Locatjon and relatjonships ▪ Equipment schedule ▪ Court lines & sizes

SCHEMATIC DESIGN

MAY 19, 2016: MEETING #4: CONCEPT REVIEW MEETING

Meetjng on-site with Design Team:

▪ Review schematjc design concepts ▪ Review specifjc space needs for each area ▪ Review schedule and budget JUNE 2, 2016: MEETING #5: CONCEPT REVIEW MEETING ▪ Review modifjed schematjc designs ▪ Confjrm fjtness equipment layouts ▪ Confjrm multj-purpose room equipment / game lines ▪ Review schedule and budget JUNE 16, 2016: MEETING #6: CONCEPT REVIEW MEETING ▪ Finalize schematjc fmoor plan ▪ Review window locatjons / day lightjng ▪ Begin to discuss fjnish optjons ▪ Review schedule and budget JUNE 30, 2016: DESIGN CONCEPT COMPLETE PRESENTATION ▪ Final concept review ▪ Review fjnish optjons ▪ Review schedule and budget

DESIGN DEVELOPMENT

JULY 14, 2016: MEETING #8: DFD PROJECT REVIEW MEETING

Meetjng with Craig Weisensel, Peter Bloechl-Anderson, Bob Hofgman, Paul Lippitu, Ron Bristol, Casey Coddington, McChesney/Kheraz, Robert Lux, Jake Ehmke, Rob Otremba for DFD Pre-submitual Review

AUGUST 4, 2016: MEETING #9: DESIGN DEVELOPMENT MEETING

Meetjng with SDS, DFD, UW-L, UW-System & Consultants

▪ Review all systems design (HVAC, Electrical, Structural) ▪ Meet with La Crosse Fire chief ▪ Review schedule & budget AUGUST 25, 2016: MEETING #10: DESIGN DEVELOPMENT MEETING

Meetjng with SDS, DFD, UW-L, UW-System & Consultants

▪ Review all systems design (HVAC, Electrical, Structural) ▪ Review schedule & budget ▪ Review systems with Focus on Energy Design Assistance SEPTEMBER 15, 2016: MEETING #11: DESIGN DEVELOPMENT MEETING

Meetjng on-site with Design Team:

▪ Final Review of all systems SEPTEMBER 22, 2016: 35% PRELIMINARY REVIEW DOCUMENTS COMPLETE OCTOBER 20, 2016: PRELIMINARY REVIEW COMMENTS FROM DFD / UWL 9-22-16: PRELIMINARY REVIEW DOCUMENTS COMPLETE 9-22-16: DESIGN REPORT COMPLETE BUILDING COMMISSION MEETING. AUTHORITY TO CONSTRUCT 10-6-16 BOARD OF REGENTS

CONSTRUCTION DOCUMENTS

DECEMBER 7 OR 14, 2016: Building Commission Meetjng SDS Proceeds with Final Documents MARCH 9, 2017: Final documents submitued for Review MARCH 30, 2017: Final review comments from DFD / UWL APRIL 13, 2017: Bid Documents Posted

BIDDING

APRIL 27, 2017: Building Tour/Walk-Through MAY 11, 2017: Receive Bids

CONTRACTS / MOBILIZATION

JULY 6, 2017: Contracts - Notjce to Proceed

CONSTRUCTION

JULY 10, 2017: Begin Constructjon JULY, 2018: Substantjal Completjon

OCCUPANCY

SEPTEMBER, 2018: Final Completjon

slide-2
SLIDE 2

Recrea

  • nal Eagle Center Addi
  • n

September 22, 2016 DESIGNED FOR LIFE

SDS Architects, Inc.

DFD Project No. 14I2B

| 1

Site Plan

slide-3
SLIDE 3

Recrea

  • nal Eagle Center Addi
  • n

September 22, 2016 DESIGNED FOR LIFE

SDS Architects, Inc.

DFD Project No. 14I2B

| 2

UP UP UP UP 35 ELEVATOR 40 STORAGE 45 VESTIBULE 46 STAIR 47 STAIR 30 TELECOM 48

  • ELEV. EQUIP

10N STAIR B10 MECH. EQUIP.

Lower Level Plan

UP UP UP UP 78 SF ELEVATOR 4268 SF STORAGE 155 SF VESTIBULE 143 SF STAIR 143 SF STAIR 120 SF TELECOM 40 SF
  • ELEV. EQUIP
10N STAIR B10 MECH. EQUIP.

Lower Level Reference Plan

slide-4
SLIDE 4

Recrea

  • nal Eagle Center Addi
  • n

September 22, 2016 DESIGNED FOR LIFE

SDS Architects, Inc.

DFD Project No. 14I2B

| 3

DN UP UP UP UP DN UP UP DN 26 STAIR 27 TOILET 28 TOILET 29 CUSTODIAL WORK 31 STAIR 32 OFFICE 33 TRAINING 34 FITNESS CENTER W1 35 ELEVATOR 100M STAIR 109 ELECTRICAL SERVICE 109A EMERGENCY GENERATOR 110 COMM. EQUIP. 112A STORAGE 112B STORAGE 112D ELECTRICAL 112C STORAGE 113 WOMEN'S LOCKER 49 MEN'S LOCKER 115 LOCKER 117 WOMEN 119 JANITOR 116 UNISEX 118 MEN 100N STAIR 120 FIRST AID 121 CHNG. 100G VESTIBULE 100P CORRIDOR 100Q CORRIDOR 113A TOILET 114A TOILET 113C SHOWER 114C SHOWER 114D VESTIBULE 113D VESTIBULE 113B DRYING 114B DRYING 112 SOUTH CORRIDOR

First Floor Plan

DN UP UP UP UP DN UP UP DN UP UP UP UP 26 STAIR 27 TOILET 28 TOILET 29 CUSTODIAL WORK 31 STAIR 32 OFFICE 33 TRAINING 34 FITNESS CENTER W1 35 ELEVATOR 106 RECEIVE 108 STORAGE 100M STAIR 109 ELECTRICAL SERVICE 109A EMERGENCY GENERATOR 110 COMM. EQUIP. 105A STORAGE 105B STORAGE 105C STORAGE 101 AEROBIC ROOM 101A STORAGE 101B STORAGE 103A JANITOR 104 EQUIP. 104A ELEV. 102 MEN 103 WOMEN 112A STORAGE 112B STORAGE 112D ELECTRICAL 112C STORAGE 113 WOMEN'S LOCKER 49 MEN'S LOCKER 115 LOCKER 117 WOMEN 119 JANITOR 116 UNISEX 118 MEN 100N STAIR 120 FIRST AID 121 CHNG. 160A OFFICE 160B WORK 160C STORAGE 160 FITNESS CENTER 130D OFFICE 130C OFFICE 130B OFFICE 130A OFFICE 130 ADMINISTRATION 129 TELE. 142 OFFICE 143 SERVICE 150B STORAGE 150A JANITOR 150 MULTI-PURPOSE 100A VESTIBULE 100G VESTIBULE 100E VENDING 144 STORAGE 140 DISPLAY 141 PLANNING 100H CORRIDOR 100P CORRIDOR 100Q CORRIDOR 113A TOILET 114A TOILET 113C SHOWER 114C SHOWER 114D VESTIBULE 113D VESTIBULE 113B DRYING 114B DRYING 112 SOUTH CORRIDOR

First Floor Reference Plan

slide-5
SLIDE 5

Recrea

  • nal Eagle Center Addi
  • n

September 22, 2016 DESIGNED FOR LIFE

SDS Architects, Inc.

DFD Project No. 14I2B

| 4

UP DN UP DN UP UP UP 35 ELEVATOR 36 MEN 37 STAIR 38 WOMEN 200M STAIR 203 EXCERCISE MACHINES 201 JOGGING TRACK 212 MECHANICAL 211 FLOOR SCRUBBER 200R STAIR 200B CORRIDOR 44 MULTIPURPOSE 139 SF 105D STORAGE

Second Floor Plan

UP DN UP DN UP UP UP UP UP 35 ELEVATOR 36 MEN 37 STAIR 38 WOMEN 210 MECHANICAL 204 WARM UP 201 JOGGING TRACK 200M STAIR 203 EXCERCISE MACHINES 201 JOGGING TRACK 212 MECHANICAL 211 FLOOR SCRUBBER 200R STAIR 200B CORRIDOR 44 MULTIPURPOSE 139 SF 105D STORAGE

Second Floor Reference Plan

slide-6
SLIDE 6

Recrea

  • nal Eagle Center Addi
  • n

September 22, 2016 DESIGNED FOR LIFE

SDS Architects, Inc.

DFD Project No. 14I2B

| 5

Elevations

South Elevation West Elevation