PREVAILING WINDS, LLC OUR MISSION OUR MISSION OUR MISSION OUR MISSION Prevailing Winds, LLC is a community based wind development corporation, committed to the development of wind turbine based renewable energy. Our commitment is


slide-1
SLIDE 1

PREVAILING WINDS, LLC

slide-2
SLIDE 2

OUR MISSION OUR MISSION OUR MISSION OUR MISSION

Prevailing Winds, LLC is a community based wind development corporation, committed to the development

  • f

wind turbine based renewable energy. Our commitment is to develop wind energy projects that are sustainable, long term and environmentally

  • sound. We are committed to the social and

economic improvement of rural South Dakota by maximizing a projects economic benefit within the local communities.

slide-3
SLIDE 3

PREVAILING WINDS, LLC

slide-4
SLIDE 4

Project Location Project Location Project Location Project Location

slide-5
SLIDE 5
  • wagner-

..-~-

  • ---·'---

Charles Mix

~

@

' I 'l"

j P.P

  • -'------~

3 ~ 7~

...........

Bon Homme

Kaylo1

  • \

' 1

I

T.y,n d

_a

i...

11-

slide-6
SLIDE 6

What will go inside the Box What will go inside the Box What will go inside the Box What will go inside the Box

  • Section 8 of the permit application

describes it in detail, here is a shorten list

– Turbines and Foundations – Turbine Roads – Underground Collection System – Substation & Transmission Line – Controls System – Interconnection to WAPA Lines

slide-7
SLIDE 7

Requirements Requirements Requirements Requirements and and and and Setbacks Setbacks Setbacks Setbacks

  • Sound Limits
  • Shadow Flicker Limits
  • Non-participating property setbacks
  • Public right-of-way setbacks
  • Other State and County requirements

listed in Tables 9.2 & 9.3

  • Additional Permit Conditions
slide-8
SLIDE 8

Requirements Requirements Requirements Requirements and and and and Setbacks Setbacks Setbacks Setbacks

Sound Limits

slide-9
SLIDE 9

Requirements Requirements Requirements Requirements and and and and Setbacks Setbacks Setbacks Setbacks

Shadow Flicker Limits

slide-10
SLIDE 10

Other Considerations Other Considerations Other Considerations Other Considerations

  • Signed Leases
  • Wind Data
  • Turbine Model
  • Farming Operations
  • Areas of Public Use
  • Wildlife Areas
  • And many others
slide-11
SLIDE 11

Other Other Other Other permits and permits and permits and permits and approvals approvals approvals approvals

  • Bon Homme CUP & Building permits
  • Charles Mix Building permits
  • Road Use Agreements with Counties

and Townships

  • List of additional permits can be found

in Section 26.1