IFB FQ15074 Install (6) DC Switchgear Lineups Washington Metropolitan Area Transit Authority
IFB-FQ15074 Install (6) DC Switchgear Lineups
Pre-Bid Conference IFB FQ15074 Install (6) DC Switchgear Lineups - - PowerPoint PPT Presentation
Washington Metropolitan Area Transit Authority IFB-FQ15074 Install (6) DC Switchgear Lineups Pre-Bid Conference IFB FQ15074 Install (6) DC Switchgear Lineups Invitation For Bid (IFB)/Contract Number FQ15074 October 23, 2014 1:00pm-3:00pm
IFB-FQ15074 Install (6) DC Switchgear Lineups
Silence all Cell phones and pagers
IFB-FQ15074 Install (6) DC Switchgear Lineups
IFB-FQ15074 Install (6) DC Switchgear Lineups
IFB-FQ15074 Install (6) DC Switchgear Lineups
IFB-FQ15074 Install (6) DC Switchgear Lineups
IFB-FQ15074 Install (6) DC Switchgear Lineups
IFB-FQ15074 Install (6) DC Switchgear Lineups
IFB-FQ15074 Install (6) DC Switchgear Lineups
The outside of the envelope shall show:
IFB-FQ15074 Install (6) DC Switchgear Lineups
BASIS FOR AWARD: The Authority will award a contract to the lowest responsive and responsible bidder whose bid conforms to this Invitation for Bids.
IFB-FQ15074 Install (6) DC Switchgear Lineups
IFB-FQ15074 Install (6) DC Switchgear Lineups
SCHEDULE EVENT DATE RFP Release October 17, 2014 Pre-Proposal Conference October 23, 2014 Deadline for Proposer Questions October 29, 2014 Bid Opening November 5, 2014 Award Date (estimated) November 25, 2014 Notice to Proceed (NTP) (estimated) December 5, 2014
Dates Subject to Change
IFB-FQ15074 Install (6) DC Switchgear Lineups
IFB-FQ15074 Install (6) DC Switchgear Lineups
participation and Letters of Intent. All DBEs must have current WMATA DBE certifications.
IFB-FQ15074 Install (6) DC Switchgear Lineups
SUMMARY OF SUBMITTALS With the Bid/Proposal
certification letters attached for each listed DBE.
(Attachment B-2).
completed “DBE Unavailability Certifications” (Attachment B-3) as appropriate.
IFB-FQ15074 Install (6) DC Switchgear Lineups
SUMMARY OF SUBMITTALS Bid and Proposal Requirements (Apparent Successful Bidder/Proposer)
certification letters or a certification letter issued by the MWUCP.
to receive 100 percent of the allowable credit for expenditures to DBE manufacturers/suppliers (Attachment B-4).
applicable (Attachment B-5, pgs. 1, 2, 3, 4).
IFB-FQ15074 Install (6) DC Switchgear Lineups
SUMMARY OF SUBMITTALS
IFB-FQ15074 Install (6) DC Switchgear Lineups
IFB-FQ15074 Install (6) DC Switchgear Lineups
Washington Metropolitan Area Transit Authority
IFB-FQ15074 Install (6) DC Switchgear Lineups
Washington Metropolitan Area Transit Authority
IFB-FQ15074 Install (6) DC Switchgear Lineups
Existing equipment to be replaced
Location of equipment access door
Existing switchgear to be replaced
Equipment access door
Existing equipment to be replaced
Access door
Existing equipment to be replaced
Inside mezzanine level view Street access
Existing equipment to be replaced
Equipment and Personal Access Entry
Existing equipment to be replaced
IFB-FQ15074 Install (6) DC Switchgear Lineups
IFB-FQ15074 Install (6) DC Switchgear Lineups
IFB-FQ15074 Install (6) DC Switchgear Lineups