CITY OF CAMARILLO Storm Drain Structure Maintenance Bid - - PowerPoint PPT Presentation

city of camarillo
SMART_READER_LITE
LIVE PREVIEW

CITY OF CAMARILLO Storm Drain Structure Maintenance Bid - - PowerPoint PPT Presentation

CITY OF CAMARILLO Storm Drain Structure Maintenance Bid Specification MC-2019-2 (REBID) Mandatory Pre-Bid Meeting January 22, 2020 Mandatory Pre-Bid Meeting Outline (Please sign the attendance sheet before leaving this meeting) 1. Bid Due


slide-1
SLIDE 1

CITY OF CAMARILLO

Storm Drain Structure Maintenance

Bid Specification MC-2019-2 (REBID) Mandatory Pre-Bid Meeting – January 22, 2020

slide-2
SLIDE 2

Mandatory Pre-Bid Meeting Outline

(Please sign the attendance sheet before leaving this meeting)

  • 1. Bid Due Date and Submittals
  • 2. Bid Minimum Spec. Requirements
  • 3. Review Storm Drain Structures
  • 4. Review Scope of Work
slide-3
SLIDE 3

Bid Due Date and Submittals

Due by 10:00am on February 11, 2020 Sealed bid delivered to City Clerk’s Office,

601 Carmen Dr. Camarillo CA 93010

Submittals – Review Bid for all Required

Submittals

slide-4
SLIDE 4

Bid Minimum Spec. Requirements

DIR – Contractor & Subs Prevailing Wage Contractor’s License Encroachment Permit City Business License

slide-5
SLIDE 5

Storm Drain Structures:

  • Detention Basins
  • Earthen Ditches
  • Concrete Ditches
  • Concrete Culverts
  • Parkway Drains
  • Fence Line Trash Cleanup
slide-6
SLIDE 6

City Storm Drain Structures to be Maintained

slide-7
SLIDE 7
slide-8
SLIDE 8

Detention Basins

#11 – Cerro Vista

slide-9
SLIDE 9

Detention Basins

#33 – Sares Regis, 2310 Antonio

slide-10
SLIDE 10

Detention Basins

#3b – 6215 Armitos Dr. #17 – Earl Joseph Drive

slide-11
SLIDE 11

1 2

Standpipes

Entrance to F Canyon access road

Earthen Ditch & DB Standpipe

#19a – F Canyon Detention Basin/Ditch

slide-12
SLIDE 12

Earthen Ditch & DB Standpipe

#19a – F Canyon Detention Basin/Ditch

Standpipe 2

slide-13
SLIDE 13

Drop Inlet above Ditch

#19b – F Canyon Drop Inlet (Woodcreek Rd.)

slide-14
SLIDE 14

Earthen Ditch

#27 – Pleasant Valley Rd. #16 – Las Posas Rd.

slide-15
SLIDE 15

Concrete V-Ditch

#45 – 413 Calle Higuera #16 – Del Norte/Central (behind MHP)

slide-16
SLIDE 16

Culverts

#5 – Ventura Blvd. s/side n/o Cam. Hills Drain

#47 – Daily Dr. North

slide-17
SLIDE 17

Culverts

#25 – Paseo Del Campo/Creekside #26 – Dead End Paseo Noche

slide-18
SLIDE 18

Parkway Drains

#12 – 4847 Colony #13 – 4707 Colony

slide-19
SLIDE 19

Fence Line Trash Cleanup

#48 – Del Norte

(s/side adjacent to 101 Frwy. from dead end to Harley Davidson driveway)

#49 – Daily Dr.

(s/side adjacent to 101 Frwy. from Calle La Roda to Carmen)

slide-20
SLIDE 20

Fence Line Trash Cleanup

#48 – Ventura Blvd. starting at Central Ave.

  • n north side along fence running parallel to

101 frwy to fencline adjacent to Camarillo Hills Drain ending at Las Posas Rd. Drain

Ventura Blvd. L a s P

  • s

a s R d

slide-21
SLIDE 21

Bid Specification Section 701 – Scope of Work

  • Stormwater Best Management Practices - SWPCP
  • Traffic Control Plan
  • Work Hours – M-F; 7 am – 4 pm (no activity in moving

traffic lane between 7-8:30 am or after 4:30 pm

slide-22
SLIDE 22

Bid Specification Section 701 – Schedule

  • Cleanout – Start within 2 weeks of issuance of Purchase

Order.

slide-23
SLIDE 23

Bid Specification Section 701- Maintenance

  • City to provide contractor with prioritized list of storm drain structures

along with any special conditions.

  • Contractor shall notify Underground Service Alert (Dig alert) and

insure all utility lines have been marked prior to maintenance.

  • Weeds to be removed by Contractor performing maintenance.
  • Contractor to remove sediment, debris and trash in storm drain

structure.

  • If use of water – vacuum and dispose of at City Wastewater

Treatment Plant; no discharge to storm drain structure.

slide-24
SLIDE 24

Bid Specification Section 701- Maintenance

  • Contractor to complete City maintenance form (see Appendix B1 in

Bid Spec.)

  • Contractor to photo document storm drain structures before and

after cleanout per City standard (see Appendix B2).

  • Contractor shall provide city with flash drive of photos and the

maintenance forms within one week after last storm drain structure was cleaned out.

slide-25
SLIDE 25

Bid Specification Section 701 – Documentation

slide-26
SLIDE 26

APPENDIX B1 Page 2

slide-27
SLIDE 27

City Contacts

  • Jessica Ouellette, Stormwater Program Manager –

805-388-5391

  • Mike Sanchez, Stormwater Inspector – 805-402-6692