Port of Davisville Infrastructure Rehabilitation/Replacement - - PowerPoint PPT Presentation

Port of Davisville Infrastructure Rehabilitation/Replacement Program February 2016 Port of Davisville RIs only Public Port One of the Top 10 auto import locations in North America 2015 sixth consecutive record breaking year A


slide-1
SLIDE 1

Port of Davisville Infrastructure Rehabilitation/Replacement Program

February 2016

slide-2
SLIDE 2

Port of Davisville RI’s only Public Port

  • One of the Top 10 auto import locations in

North America

  • 2015 sixth consecutive record breaking

year

  • A record 193 ship calls in 2015
  • 227,021 autos imported in 2015
  • Additional 42,150 auto by rail and truck
  • The Port of Davisville now handles more

than six times the volume of automobiles shipped there in 1996, a 547% increase

  • Port of Davisville represents nearly half of

import vessel calls into Narragansett Bay

1

45% 55%

2015 NARRAGANSETT BAY IMPORT VESSEL ARRIVALS

Port of Davisville Other RI Terminals and Ports

slide-3
SLIDE 3

Port of Davisville Economic Impact

R/ECON Input-Output Model analysis of 2014 cargo activity:

  • $333 million in business output
  • Over 1,500 direct, indirect and induced jobs
  • $97 million in household earnings
  • $17 million in state taxes
  • $10 million in local taxes

SOURCE: Economic and Tax Effects on the Rhode Island Economy of Major Business Activity at the Port of Davisville in 2014, FXM Associates, November 4, 2015

2

slide-4
SLIDE 4

Port of Davisville – Pier 2

Pier 2

  • Constructed:

1956/1957

  • Type: Earth Filled

Marginal Wharf

  • Use: Public Port
  • Design Life:

50 years

  • Age: 60 years

PIER 2

3

slide-5
SLIDE 5

Port of Davisville Pier 2 – Rehabilitation Cost

Pier 2: Rehabilitation $82 million (2015 $’s) 975 construction jobs resulting from this investment

4

slide-6
SLIDE 6

Port of Davisville - Pier 2 Rehabilitation

  • Phase 1: Engineering and Permitting $ 4,000,000
  • Phase 2: Dredge East Berth

$ 3,800,000

  • Phase 3: Construct East Berth $16,100,000

5

slide-7
SLIDE 7

Port of Davisville - Pier 2 Rehabilitation

Phase 4: Install New Sheet Pile South Side $37,800,000 Phase 5: Install New Sheet Pile East Side $20,300,000

6

South Berth Construction East Berth Construction

slide-8
SLIDE 8

Port of Davisville - Pier 2 Rehabilitation

7

Estimated impact of Annual Inflation of 2.00% 2.00% 4.0400% 6.1208% 8.2432% 10.4081% 2016 2017 2018 2019 2020 2021 Total Design & Permitting of Pier 2 $4,000,000 $4,080,000 $4,080,000 Pier 2 Improvements Dredging $3,800,000 $4,032,590 $4,032,590 Pier 2 Extension $16,100,000 $17,085,449 $17,085,449 New Anchored HZ-M Bulkhead Pier 2 South Face $37,800,000 $40,915,936 $40,915,936 New Anchored HZ-M Bulkhead Pier 2 East Face $20,300,000 $22,412,840 $22,412,840 Total $82,000,000 $4,080,000 $0 $21,118,039 $40,915,936 $22,412,840 $88,526,815

slide-9
SLIDE 9

Port of Davisville - Pier 2 Rehabilitation

8

Total Project Cost: ($90,000,000) Source of Funds: Proposed General Obligation Bond $70,000,000 *Kushner Approved Revenue Bond $20,000,000

* The revenue bond will be repaid exclusively by the QDC and port users. It will fund a portion of the port improvement initiative at no cost to state taxpayers.