Peoples Assembly 12 April 2014 Cllr M Ha c k MMC: Eng ine e ring This Portfolio includes: Roads Storm Water Water Provision Sanitation Services Electricity Street Lights Mechanical Workshop Engineering


  1. People’s Assembly 12 April 2014

  2. Cllr M Ha c k MMC: Eng ine e ring This Portfolio includes: • Roads • Storm Water • Water Provision • Sanitation Services • Electricity • Street Lights • Mechanical Workshop

  3. Engineering Services Councillor Malcolm Hack MMC Mr Steph Coetzee Executive Director

  4. ina nc ia l Ye a r 2013/ 14 F

  5. Sicelo / Highbury Reservoir and Bulk Connections The Project entails Construction of a New 10Ml Reservoir and Bulk Water Connection to Sicelo with Connections to Walkers Fruit Farms, Highbury, Valley Settlements, Daleside and Henley on Klip. Total Value R90,000,000

  6. Sicelo / Highbury Reservoir and Bulk Connections Location Walkers Fruit Farms / Sicelo / Valley Settlement / Daleside etc. Ward Multiple Financial Year 2012/13 – 2016/17 Status Phase 1 contract awarded other at EIA stage

  7. Wa te r: Sic e lo We st Side

  8. Wa te r: Sic e lo Ea st Side

  9. Pipe Cra c king The Project entails the Installation of New Water Pipes in Henley on Klip & Highbury Areas Total Value : R8 Million Location : Henley on Klip & Highbury Ward : 4 & 5 Financial Year : 2013/14 Status : Work in progress

  10. Sa nita tion Portable Toilets for Informal Settlements 200 Installed in Boitumelo and Khayelitsha

  11. De De ur Stre e t L ig hting The Project entails Erection of Street Lights in De Deur Area Total Value : R1.6 million Location : Per Map Ward : 11 Financial Year : 2013/14 Status : Work to commence

  12. ig hting De De ur Stre e t L

  13. He nle y on Klip Stre e t L ig hting The Project entails Erection of Street Lights in Henley on Klip Total Value : R1 Million Location : Iffley Road Ward : 4 Financial Year : 2013/14 Status : Work to commence

  14. Ene rg y Sa ving s Proje c t The Project entails Replacement of Street Lights Luminaires with Energy Efficiency Lights Total Value : R9 Million Location : Midvaal Supply Area Ward : Various Financial Year : 2013/14 Status : Work commenced

  15. Ele c tric a l Ne twork The Project entails Upgrading of Networks Total Value : R3 Million Location : Midvaal Supply Area Ward : Various Financial Year : 2013/14 Status : Work in progress

  16. MIG Roa ds Proje c ts The Project entails Roads Identified – still to be done: • Meerkat Street • Bell Road side walk paving • Roads around Lakeside MPC: Mtwalume Mzume Bulolo

  17. Pha se 4 The Project entails Continuation of Loch Street between Junius and Galloway Streets Total Value : R10,000,000 Location : Loch Street Ward : 9 Financial Year : 2013/14 Status : Construction 80%

  18. Upg ra ding Inte rse c tions The Project entails the Upgrading of the Verwoerd / Mimosa Intersection Total Value : R3 million Location : Golf Park Ward : 14 Financial Year : 2013/14 Status : Work to commence

  19. 2014/15 Financial Year

  20. Bulk Ele c tric a l Ne twork The Project entails High Mast Lights & Bulk Network in Sicelo Total Value : R3.5 Million Location : Sicelo Ward : 8 & 10 Financial Year : 2014/15 Status : Work to commence

  21. De De ur Stre e t L ig hting The Project entails Erection of Street Lights in De Deur Area Total Value : R3 million Location : Per Map Ward : 11 Financial Year : 2013/14 & 2014/15 Status : Work to commence

  22. He nle y on Klip L ig hting The Project entails Erection of Street Lights in Henley on Klip Total Value : R1,5 Million Location : Ewelmy Road Ward : 4 Financial Year : 2013/14 & 2014/15 Status : Work to commence

  23. Se rvic e s in Sic e lo The Project entails the Upgrading of Sewer & Bulk Basic Services in Sicelo Total Value : R17.3 million Location : Sicelo to Rothdene Pump Station Ward : 8 & 10 Financial Year : 2014/15 Status : Work to commence

  24. Expa nsion Me ye rton WWT W The Project entails the Expansion of the Meyerton Waste Water Treatment Works Total Value : R90 million Location : Meyerton Ward : 10 Financial Year : 2014/15 Status : Work to commence

  25. Upg ra ding Inte rse c tions The Project entails the Upgrading of the Verwoerd / Mimosa Intersection Total Value : R3 million Location : Golf Park Ward : 14 Financial Year : 2013/14 & 2014/15 Status : Work to commence

  26. MIG Roa ds Proje c ts Roads Identified for 2014/15 Financial Year: • Swartwitpens Street • Tiger Street • Loerie Street • Indri Street • Oorbietjie Street • Makgota Street

  27. MIG Roa ds Proje c ts Roads Identified for 2014/15 Financial Year: • Bereng Street • Thoho ya Ndou Street • Khama Street • Mohapi Street • Peacock Street • Thornton Street

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.