NEOTERM TERMOTECNICA INDUSTRIALE S.r.l. EPC Contractor for Industrial & Power Plants since 1980, abroad and in Italy Viale Brodolini Z.I. - 84091 Battipaglia (SA) We operate with a turnkey approach deliverying solutions to our Customers
Viale Brodolini Z.I. - 84091 Battipaglia (SA)
TERMOTECNICA INDUSTRIALE S.r.l. EPC Contractor for Industrial & Power Plants since 1980, abroad and in Italy
We operate with a turnkey approach deliverying solutions to our Customers We are committed to our Customer success guaranteeing plant performances and timely execution of the projects
Our Team
Approx 50 people:
- Engineers;
- Drafters;
- SW developers;
- Administration;
- Sales force;
- Qualified welders;
- Piping;
- Steel structure;
- Electricians;
- I&C field personnel.
Outside area 12000 m2 Offices 1600 m2 Workshop 1500 m2 Warehouse 600 m2
Our facility
14000 m2
Our Key Business Areas:
- CHP – combined heat and power plants
- Gas fired thermal stations
- Industrial projects
We deliver Solutions to our Customers to accomplish their specific needs
Company expertise:
- Engineering
- Boilers – directly fired and HRSG
- Power stations
- Complete Piping Systems
- Plant DCS and Burner Management Systems
- Gas Stations
ENGINEERING
Termotecnica Industriale has a consolidated expertise as Engineer. We have a multidisciplinary, integrated approach, with competencies on Civil, Mechanical, Process, Electrical and I&C engineering.
ESApro
Complete suite for integrated plant engineering: P&ID, Piping, Data sheet, Sketch, Hook up,…
TecnoMETAL
Steel structures engineering
SPAC
Electrical schematics software
AutoCAD Softwares utilized
CONSTRUCTION
Complete overview on project, from engineering to beneficial use, inclusing site management and commissioning by skilled personnel.
PROCUREMENT
Equipment specification, suppliers qualification, negotiations and follow up.
SERVICE
To help our Customers to achieve their business targets, our specialists are always available for maintenance or emergency repairs.
NEOTERM
Via Renè Vanetti 21100 - Varese
NEOTERM S.r.l. Since 1950 engineers and manufacts of Conventional, biomass Boilers and HRSG abroad and in Italy Out team
Approx 23 people:
- Engineers;
- Drafters;
- Administration;
- Sales force;
- Welders;
- Piping assemblers;
- Steel structures
Our boilers have been operated for 30 years deliverying our Customers top performances with oustanding reliability. Our Customer Services team provides lifecycle services to our boilers fleet.
- Paper mills
- O&G and chemical facilities
- Textile facilities
- Food industries
- Sugar production facilities
- CHP plant
- Utility
- Waste to Energy
- Renewable energies / Biomass
Our Applications…..
NEOTERM si focused on engineering and construction of boilers. We deliver: SATURATED / SUPERHEATED STEAM BOILERS:
- ON NATURAL GAS / FUEL OIL
- BIOMASS
- FIRED WITH INDUSTRIAL WASTES
HRSG:
- GAS TURBINES
- RECIPROCATING ENGINES
- WASTE TO ENERGY FURNACES
HOT and SUPERHEATED WATER BOILERS
Key activities:
FIRE TUBE BOILERS MARINE BOILERS (Water Tubes / Fire Tubes) DIATHERMIC OIL RECUPERATORS HEAT RECOVERY SYSTEMS:
- Economizers
- Air preheaters
BURNERS:
- For industrial fuels
- For natural gas
- For HRSG
Principali attività:
H.R.S.G.
- Water tube – Natural circulation & Controlled
circulation
- Supplementary fired & Fresh Air System
W.H.R.B.
- Water tube – Natural circulation boiler &
Controlled Circulation
- Hight fouling flue gas operated
- Cleaning system equipped
DUCT RADIANT BURNER
- Fuel Gas & Low LHV Gas
- Low Emissions system
- Water Cooled & Uncooled burners
NEOTERM ’s Activities:
Typical Project 1/6
P&ID e Hook-up
P&ID – Dettaglio rampa gas Hook-up strumentali
Typical project 2/6
Civil & Structures
Vista in pianta e Vista 3D Rendering 3D
Typical project 3/6
Electrical drawings
Schema elettrico Lay-out quadro elettrico
Typical project 4/6
Piping 3D e Sketch
3D Piping di distribuzione Sketch isometrici
Typical project 5/6
Piping Stress Analysis Complete stress analysis competencies.
- QCP
- Engineering Schedule
- Overall project schedule
- P&ID
- Piping 3D
- Isometric sketch
- Lay-out
- MTO
- Piping Stress Analysis
- IO list, alarm list, SD Matrix
- Hook up
- Electrical and control schematics
- Commissining and performance procedures
- Technical dossier as per CE requirements
- O&M manual
- Plant Declaration of Conformity
Un progetto 6/6
Standard documentation
We have strong competencies on thermal stations and existing boilers revamping and retrofits. Thanks to our retrofits we are able to increase: + Efficiency + Production + Enviromental sustainability
Revamping
We are able to Re – Certify complete systems after revamping is performed
Termotecnica Industriale has extended experience on
UNI/TS 11325-3
24 h
72 h
- Permanently manned boiler stations
- Unmanned operation up to 24 h
- Unmanned operation up to 72 h
We engineer, build and commission:
- BMS (Burner Management System) for safe operation of burners
- BCS (Boiler Control System) for boiler automatic control sequences
BMS
Centrale Termica Piping 3D
Steam Boiler EPC Plant
- Thermal power= 15,5 MWt
- steam flow = 25.000 kg/h
- Rated pressure= 30 bar
- Rated temperature = + 238 °C
Scope of supply: Basic and Detailed Engineering, Civil Works, Mechanical, Electrical, I&C works, Commissioning and test.
Reference 1 FCA Group S.p.A -
Stabilimento Maserati Grugliasco - TO
Centrale Termica Dettaglio caldaia
Centrale Termica Piping 3D
EPC project fuel gas preheating system
- Heat input = 15 MWt x 2 = 30 MWt
- Rated flow = 500 m3/h
- Rated pressure= 6 bar
Scope
- f
supply:
basic and detailed engineering, civil, mechanical, electrical, I&C works, commissining and acceptance tests.
Reference 2 STO.G.IT. S.p.a.
Bordolano - CR
Centrale Termica Vista in pianta
EPC boiler house Heat Input= 19 MWt
- Diathermic oil system
- Rated Flow = 410 mc/h
- Rated Pressure = 12 bar
- Rated Temperature= + 350 °C
- Saturated steam system
- Rated Flow = 13 ton/h
- Rated Pressure = 10 bar
- Rated Temperature = + 184 °C
- Hot water system
- Rated flow = 470 mc/h
- Rated pressure = 5 bar
- rated Temperature = + 85 °C
Scopo of supply:
EPC project with mechanical, electrical, civil engineering, construction, including commissioning and test.
Reference 3 Matrìca S.p.a.
Porto Torres - SS
Centrale Termica Piping 3D
Chilled water production plant Piping 3D Chilled water tanks Rendering 3D
EPC Chilled Water production and distribution plant:
- Thermal Power = 3,2 MWt
- Rated Flow = 500 mc/h
- Design Pressure= 6 bar
- Design Temperature = - 10 °C
Scope of supply: Scopo di fornitura: Progettazione EPC project wth
mechanical, process, electrical, I&C and civil, including commissining and tests.
Reference 3 Matrìca S.p.a.
Porto Torres - SS
EPC Project Demi Station Vista 3D Impianto produzione aria compressa Vista 3D
Reference 3 Matrìca S.p.a.
Porto Torres - SS
Demi Plant:
- Design flow= 20 mc/h
- Design pressure= 7 bar
- Design temperature= + 60 °C
Compressed air EPC project:
- Rated flow= 5000 kg/h (su due linee)
- Rated Pressure = 30 bar
- Rated Temperature= + 110 °C
Centrale Termica Layout e P&ID Camino Progetto e Realizzazione
EPC Boiler Station
- Boiler Thermal Power = 14,9 MWt x 2 = 29,8 MWt
- Rated flow= 34 ton/h
- Rated Pressure= 22 bar
- Rated temperature = + 375 °C
Scope of supply: EPC project includign mechanical, electrical, civil engineering, construction and commissioning.
Reference 4 E.On S.p.a.
Ostiglia - MN
Centrale Termica Pianta e Prospetto Linee di distribuzione Dettaglio
Diathermic oil station
- Heat Input = 18,6 MW
- Rated temeprature = +260°C
Scope of supply: Engineering installation and supply of: Air compression station Tank system HVAC Process lines
Reference 5 Di Mauro S.p.a.
Officine Grafiche
Cava de’ Tirreni - SA
Mechanical installation works biomass power plants
- Rated Electrical Power = 9 MWe
- Piping in A106 ed Aisi316 = kg 85.000
- Steel Structures= kg 75.000
- Coibentazioni = mq 4.000
Ferrero – Stabilimento di Balvano (PZ) Impianto di cogenerazione
Reference 6 Ferrero S.p.a.
Balvano - PZ
Trenitalia – Foligno (PG) Vista 3D e dettagli realizzazione
Reference 7 Trenitalia S.p.a.
Foligno - PG
EPC boiler and distribution station
- Rated Thermal Power = 10,5 MWt x 2 = 21 MWt
- Rated Pressure= 8 bar
- Rated Temperature= + 155 °C
Scope of supply: EPC Project for the new thermal power station including distribution piping, rack, control system.
Centrale termica – Tavazzano (LO) Steam Generator
Reference 8 E.On S.p.a.
Tavazzano - LO
EPC Project Thermal Power Station and Distribution System
- Heat Input = 14,9 MWt
- Rated Flow = 17,4 t/h
- Rated Pressure= 22 bar
- Rated Temperature= + 425 °C
Scopo of suply: EPC Project including mechanical, electrical, civil works, commissining and tests.
Finale Emilia (MO) Vista
Reference 9 Neoterm S.r.L.
VARESE
Biomass SH boiler plant
Steam Flow = 65,00 ton/h
- Rated pressure= 65 bar
- Rated Temperature= + 470 °C
Scope of supply: EPC project for the complete system (mechanical, electrical, process, I&C) ed elettrostrumentale
CHP with Turbogas 6,5MW
- Heat Input= 22,8MWt
- Rated Flow = 35.000 kg/h
- Rated Pressure= 20 bar
- Rated Temperature = + 215 °C
Scope of supply: EPIngegneria EPC project with basic and
detailed engineering (mechanical, electrical I&C, piping)
Reference 10 Parmalat S.p.a.
Collecchio - PR
CHP plant Rendering
Boiler station Piping 3D
EPC boiler station and distribution system
- Installed thermal power= 40 MWt
- Rated Flow = 970 mc/h
- Rated Pressure= 18 bar
- Rated Temperature= + 170 °C
Scope
- f
supply:
mechanical, electrical, and process engineering; erection, commissioning and tests.
Reference 11 EDF Fenice S.p.A.
FCA Group S.p.A Cassino - FR
Centrale Termica Vista in pianta
Reference 12 Fedrigoni S.p.a.
Pioraco - MC
Revamping boiler station
Engineering and Repowering up to 20 ton/h including burner retrofits Replacement burner fan with new Inverter / 90 kW Replacement pumps and electrical motors New recovery system Complete new control system
Reference 13 TRELLEBORG
Tivoli - Roma
Revamping boiler and combustion management system New Boiler Control System New I&C system
- Replacement of remote instrumentation
- Replacement of actuators
Customers 1/4
Customers 2/4
Customers 3/4
I nostri Clienti 4/4
Partners
Wide networks of business Partners to deliver optimized technical and economical solutions.
Contact
I nostri recapiti principali tel: +39.0828.6163 fax: +39.0828.307444 e-mail: info@termotecnica.it ufficiotecnico@termotecnica.it acquisti@termotecnica.it contabilita@termotecnica.it
Massimo Carucci
Sales Manager
- tel. 0039.335.6382826
e-mail: massimo.carucci@termotecnica.it Roberto Galleri Sales Manager
- tel. 0039.335.6381884
e-mail: r.galleri@neoterm.it
Thanks for your attention.