NARA Sports Pavilion Current Funding for Project: The Project The Town of Acton is requesting $400,000 to CPA = $289,400 complete the NARA Sports Pavilion project. (The Recreation Department initially State = $150,000 requested $650,000


slide-1
SLIDE 1

NARA Sports Pavilion

slide-2
SLIDE 2

The Project Current Funding for Project: CPA = $289,400 State = $150,000 Miracle League = $136,903.81 Total = $576,303.81

The Town of Acton is requesting $400,000 to complete the NARA Sports Pavilion project. (The Recreation Department initially requested $650,000 in CPA funding in 2016 and was awarded $350,000.) The initial CPA grant, along with significant in-kind donations including time, materials and equipment, as

  • utlined in this application, will enable

completion of the north building by this summer, referred to as “Phase One” of the Sports Pavilion project. We now seek CPA funding to complete “Phase Two,” the south building and remainder of the project.

Cost Estimates: North Building = $489,000 South Building = $443,900 Total = $932,900 Amount Requested from CPA = $400,000 Current Funding for Project = $576,303.81 Total = $976,303.81 North Building South Building

slide-3
SLIDE 3

Sports Pavilion Design

slide-4
SLIDE 4

Benefits

  • A family restroom providing accessible

facilities which preserve the dignity of those needing extra assistance and their caregivers;

  • Restroom facility for all park patrons

including field users;

  • Much needed storage space for

Recreation Department equipment;

  • Patio at parking lot level with view of the

seven-acre ballfield, serving those with limited mobility;

  • Concession room/snack bar;
  • Picnic seating area;
  • Centralized NARA Camp Headquarters

safely away from Waterfront

  • Strategic location near the Miracle Field

and NARA sports fields;

  • Meets needs frequently expressed in

NARA survey – high priority in the NARA Master Plan;

  • Police Command Center for large

events, i.e. July 4th.

slide-5
SLIDE 5

Date Leveraged Work Completed Organization Estimated Value 7/2018 Interiors of buildings stripped down to studs

Inmates from MCI Shirley

$3,500 7/2018 Survey work for parking lot extension

Stamski & McNary

$1,500 7/2018 Grading and shaping for new parking lot Town of Acton $5,000 7/2018 Installation of septic tank & pump chamber

CPA & Miracle League

CPA & Miracle League 7/2018 Excavate and run conduit to buildings from septic

Redmond & Ed O’Neil

$2,000 7/2018 Excavate and run trench to grease tank Redmond $1,000 8/2018 Pave new parking lot CPA CPA 6/2019 Remove bulk heads from buildings

Inmates from MCI Shirley

$600 7/2019 Install water proofing to walls

Heffernan Construction

$1,000 7/2019 Added water proof membrane to exterior walls

Redmond & Town

$500 7/2019 2” coring through foundations for utilities Ed O’Neil $300 7/2019 Water line excavation from Quarry Road to buildings Town of Acton $3,000 7/2019 Survey elevation of utilities

Stamski & McNary

$500 7/2019 4” Coring through foundations for sewer CPA CPA 8/2019 Sewer lines excavated to buildings Redmond $1,500 8/2019 Underground utility conduits set and backfilled

Redmond & Ed O’Neil

$1,000 8/2019 Installing of meter pedestal and services to houses Electrician CPA 8/2019 Existing roof of north building repaired and metal roof installed General Fund $34,000 8/2019 Grading & compactable fill added around buildings

Redmond & Town

$2,000 8/2019 Set finished grade elevations around patio

Stamski & McNary

$800 9/2019 Shaping & fill added on slope off patio Town of Acton $2,000 9/2019 Slope loamed graded and hydro-seeded

Town & Mike Kennedy

$8,000 9/2019 Excavate & install drain from patio

Town & Redmond

$500

9/2019 & 10/2019

Final grading for patio pour and patio Pour General Fund $28,250 10/2019 Energize system to the meters Eversource 10/2019 Layout slope for sidewalk to patio

Stamski & McNary

$200 11/2019 Repairs & removal of south building roof

Apple Hill Woodworkers, Inc.

$850 11/2019 Ice & water shield applied

Robert Green Roofing

$1,350 11/2019 Donation of funds to purchase metal roof and donation to install roof

Harvey Industries IB Roof Systems Private Donation

$30,000

TOTAL ~$124,850.00

slide-6
SLIDE 6

The Finish Line

  • Find funding to complete project
  • Bid package complete late January
  • Bid awarded in March
  • Construction commences in April
  • Construction complete in July
slide-7
SLIDE 7