Downtown Connector Trail
Slavic Village Development / City of Cleveland
Washington Reservation Metropark to East 9th Street
December 27, 2010 Updated January 10, 2012
Downtown Connector Trail Washington Reservation Metropark to East - - PowerPoint PPT Presentation
Downtown Connector Trail Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland December 27, 2010 Updated January 10, 2012 812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216
Slavic Village Development / City of Cleveland
December 27, 2010 Updated January 10, 2012
1
I-490
I-77
M
g a n a Run
New Broadway / 9th Street Downtown Connection East 34th RTA Station Job Ready Development Parcel Steel Warehouse Washington Reservation
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 1500 3000 SCALE: 1”=1500’-0”
N Route Overview
2
Sheet 1
Cleveland Metroparks Washington Reservation
CROSSWALK ENHANCEMENT
CROSSWALK ENHANCEMENT
BIKE ROUTE
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
3
Sheet 2
GRADE PATH @ ODOT ROW PERSPECTIVE #1
BIKE ROUTE
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
Existing Conditions Perspective #1 - East 48th North of Fleet
MAINTAIN 7’ CLEAR FROM TRACKS WHERE SIDING IS IN USE
4
Sheet 3
Steel Warehouse CROSSING GATES AND TRAFFIC MATS AT SIDING-TRAIL INTERSECTION FENCE IMPROVEMENTS @ INTERSTATE REMOVE RETAINING WALL. ADD GATE IN FENCE
PERSPECTIVE #2 FENCE BETWEEN DRIVE AND TRAIL
BIKE ROUTE SECTION AA
0 8 16 SCALE: 1/8”=1’-0”
SECTION AA
TRUCK DRIVE 6’ SECURITY FENCES BOTH SIDES OF 10’ WIDE TRAIL EXIST. I-77 FENCE EXIST. RR SPUR STEEL WAREHOUSE
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
PERSPECTIVE #2
5
Sheet 4
Job Ready Site UNDERPASS IMPROVEMENTS. ADD LIGHTING & CONNECT TO MORGANA RUN TRAIL PERSPECTIVE #3 Perspective #2 - West of I-77 / North of Chard *Similar Condition @ Job Ready Site Perspective #3 - Morgana Trail Connection below East 49th
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
Existing Conditions Existing Conditions
6
Sheet 5
GRADE & PAVE PATH Job Ready Site EXTEND BRIDGE CULVERT TO ACCOMODATE TRAIL ABOVE UNDERPASS
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
Section BB - Job Ready Site Future Industrial Building Future Vehicular Circulation Landscaped Slope I-77 20’ 10’ Paved Path
ODOT Fence
7
Sheet 6
Job Ready Site GRADE & PAVE PATH SECTION BB
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
8
Sheet 7
GRADE & PAVE PATH
VALLEY OVERLOOK
MARGINAL ROAD CROSSWALK ENHANCEMENT Job Ready Site
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
9
Sheet 8
OVERLOOK REST STOP
@ FUTURE MARGINAL ROAD
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
10
Sheet 9
Republic Offjce Building
@ FUTURE MARGINAL ROAD
BROADWAY AVE. SHARROWS
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
11
Sheet 10
CROSSWALK ENHANCEMENT
BROADWAY AVE. SHARROWS PERSPECTIVE #4 Perspective #4 - Broadway Trail North of Dille
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
Existing Conditions
12
Sheet 11
WIDEN SIDEWALK ON BRIDGE TO ACCOMODATE PATH REDUCE AND SHIFT LANES ON BRIDGE
Slavic Village Development City of Cleveland, Ohio
November 10, 2010
A @ I-77 B @ I-490 C @ Kingsbury RR Spur D @ RTA Tracks
Broadway Bridge Sectjons
4’-6” 1’-6” 48’ 4 LANES
4’-6” 1’-6” 6’-0” 65’ 5 LANES 6’-0” Widen Bike Trail to 10’-0” 4’-0” 42’ 4 LANES
4’-0” 6’-6” 1’-6” 47’ 4 LANES
6’-6” 1’-6”
PERSPECTIVE #5 SECTION CC Section CC - Broadway Bridge Perspective #5 - Broadway Bridge over I-490
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
Existing Conditions
13
SHARROWS I-490 RAMPS CROSSWALK ENHANCEMENT
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
Sheet 12
14
Sheet 13
RAIL CROSSING IMPROVEMENTS
SHARROWS REMOVE RUBBLE BELOW BRIDGE GRADE AND PAVE PATH IMPROVE UNUSED RAIL BRIDGE FOR PATH USE. ADD FENCING AND PROTECTION BARRIER
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
15
Sheet 14
SHARROWS GRADE PATH @ SLOPE & ADD SEGMENTED RETAINING WALL PAVE PATH AND ADD 6’ FENCING TO PROTECT FROM ACTIVE RAIL. PROVIDE ACCESS GATES FOR MAINTENANCE
PAVE PATH AND ADD 6’ FENCING TO PROTECT FROM ACTIVE RAIL. PROVIDE ACCESS GATES FOR MAINTENANCE
GCRTA R.O.W. Naturalized Vegetatjon
Drive 6’ Fence 6’ Fence Norfolk & Southern Rail 10’ Bike Trail View to River Valley
SECTION DD Section DD - E 34th Rapid Station
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
16
Sheet 15
OFFICE FRONTAGE GRADE & ADD RETAINING WALLS US Post Offjce
FRONTAGE 10’ PAVED PATH W/ 6’ FENCING N O R F O L K & S O U T H E R N R A I L CROSSWALK ENHANCEMENT NE Pre-Release CROSSWALK ENHANCEMENTS Intermodal Container Storage
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
17
Sheet 16
US Post Offjce IMPROVE RAIL BRIDGE OVER GCRTA TRACKS VIEW TO RIVER VIEW TO RIVER UTILITY BRIDGE NORFOLK & SOUTHERN RAIL GCRTA RAIL MAINTAIN 12’ MIN. CLEAR BELOW UTILITY BRIDGE PERSPECTIVE #6 VIEW TO TERMINAL TOWER Perspective #6 - Utilize Abandoned Railway Corridor
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
Existing Conditions
18
Rail Corridor Ownership and Easements
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 SCALE: NOT TO SCALE
N
Section EE - Broadway Realignment Future Development Parcel Parking Street Trees BROADWAY (Realigned) 10’ Paved Path Existing Retaining Wall Compacted Fill Material View to River Valley RTA Tracks
1 2 19
Sheet 17
US Post Offjce Cuyahoga River NORFOLK & SOUTHERN RAIL G C R T A R A I L VIEW TO RIVER CAMPUS CONNECTOR CROSSWALK ENHANCEMENT REALIGNMENT OF EAST 14TH STREET VIEW TO TERMINAL TOWER 10’ PATH AT FRONTAGE OF DEVELOPMENT PARCEL
REALIGNED BROADWAY
REALIGNED E. 9TH SECTION EE MULTI-PURPOSE TRAILS BY ODOT
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013 0 100 200 SCALE: 1”=100’-0”
N
KEY
10’ OFF-ROAD PATH ON-STREET ROUTE - BIKE LANE / SHARROWS ALTERNATE ROUTE
20
McKnight Associates LTD..
L A N D S C A P E A R C H I T E C T U R E
812 Huron Road, # 421 Cleveland, Ohio 44115-1126 f: 216 771-1801 p: 216 771-1800 www.mcknightla.com
Sheet 3a & 3b
Downtown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013
December 16, 2010 Slavic Village Development - Downtown Connector Trail Preliminary Estimate of Probable Construction Costs - Conceptual Design Phase Section - Item Quantity Unit Unit Cost Subtotal Section Total Metropark Washington Reservation to Pershing Avenue Public Right-of-way Improvements 1,000 lf $25.00 $25,000.00 Off-Road Grade / Pave 10' Path 3,300 lf $90.00 $297,000.00 Remove Rail / Pave 10' Path 1,600 lf $120.00 $192,000.00 Improve Fence along I-77 700 lf $50.00 $35,000.00 6' Fence at Job Ready Site 3,300 lf $35.00 $115,500.00 Rework Concrete Retaining Wall ls $50,000.00 $50,000.00 Crosswalk Enhancements 2 each $25,000.00 $50,000.00 Underpass Improvements @ I-77 E49 ls $250,000.00 $250,000.00 Landscape Restoration ls $25,000.00 $25,000.00 $1,039,500.00 Pershing Avenue to East 37th Rail Crossing Public Right-of-way Improvements 3,300 lf $25.00 $82,500.00 Off-Road Trail-Grade / Pave 10' Path 1,100 lf $90.00 $99,000.00 Rail Crossing at E37th ls $250,000.00 $250,000.00 Czar Avenue Mill Overlook ls $150,000.00 $150,000.00 Crosswalk Enhancements 3 each $25,000.00 $75,000.00 Broadway Bridge Improvements @ I-490 ls $350,000.00 $350,000.00 Landscape Improvements at Broadway ls $35,000.00 $35,000.00 $1,041,500.00 East 37th to East Ninth Street Off-Road Grade / Pave 10' Path 200 lf $90.00 $18,000.00 Remove Rubble / Grade / Pave 1,000 lf $150.00 $150,000.00 Pave 10' Path 6,000 lf $75.00 $450,000.00 Grade / Pave 6' Connector Path 500 lf $75.00 $37,500.00 Rail Bridge Improvements 650 lf $500.00 $325,000.00 6' Protection Fence at Active Rail 9,100 lf $40.00 $364,000.00 Segmented Retaining Wall 100 lf $250.00 $25,000.00 Crosswalk Enhancements 3 each $25,000.00 $75,000.00 Landscape Improvements ls $150,000.00 $150,000.00 $1,594,500.00 Downtown Connector Trail Total $3,675,500.00 Contingency (10%) $367,550.00 Design and Engineering (10%) $367,550.00 Total Budget including Engineering $4,410,600.00