SLIDE 1 Supervision and Environmental Monitoring of River Training and Dredging Works on Critical Sectors on the Danube River
STAKEHOLDER’S FORUM MEETING No.4 – 09.November 2018
Republic of Serbia Ministry of Construction, Transport and Infrastructure
This Project is funded by the European Union
SLIDE 2
Hydromorphology
Futog km 1267.400 to km 1261.600 Morphology Hydrology
SLIDE 3 7km
General Flow Conditions
G 136 G 133 G 134 G 135
SLIDE 4
Historical development - morphology
2018.
III/2018. VII/2018. V/2018.
SLIDE 5
Chevron – “O” stage
SLIDE 6
Water level gauging stations
Futog Novi Sad: „0“ 71.73 maAs Km 1254.980 Bačka Palanka: „0“ 73.97 maAs Km 1298.560
SLIDE 7
Gauging stations on building sites
SLIDE 8
Gauging stations – web portal
SLIDE 9
Gauging stations – web portal
SLIDE 10
Gauging stations – web portal
SLIDE 11 Water levels Graph 23/10 to 04/11 2018
72 72.5 73 73.5 74 74.5 10.19.18 0:00 10.23.18 0:00 10.27.18 0:00 10.31.18 0:00 11.4.18 0:00 11.8.18 0:00
SLIDE 12
Gauging station Novi Sad – 7 days forecast
Novi Sad: „0“ 71.73 maAs Km 1254.980