middle school addition project
play

Middle School Addition Project Work Session #2 January 24, 2019 - PowerPoint PPT Presentation

Silver Spring International Middle School Addition Project Work Session #2 January 24, 2019 Lack of Separate Identity of MS & ES Lack of On Site Parking Purple Line Impacts Building Organization- Feasibility Study Original


  1. Silver Spring International Middle School Addition Project Work Session #2 January 24, 2019

  2. ▪ Lack of Separate Identity of MS & ES ▪ Lack of On Site Parking ▪ Purple Line Impacts Building Organization- Feasibility Study

  3. Original Purple Line Impact of Purple Line on Site

  4. ▪ Main Entry is Not Accessible or Secured ▪ PE Facilities are Remote and Not Accessible ▪ Safety Concerns ▪ Time Lost in Transitions ▪ No dedicated MS Performance Space ▪ No dedicated MS Elevator ▪ Shared Classroom Wing with SCES ▪ Several Spaces are Undersized ▪ MP Room ▪ PE Facilities ▪ Admin / Guidance Suite ▪ Needs ▪ Support Rooms ▪ Classrooms ▪ Science Classrooms ▪ Abandoned Spaces ▪ Auditorium Feasibility Study Issues - SSIMS

  5. • Main Entry is Not Secured • New Entry • Administration cannot monitor Visiors • 4 classrooms are in Middle School Corridor • Several Spaces are Undersized • Multipurpose room • Health • Insufficient Parking Feasibility Study Issues - SCES

  6. • Demolish front section of SSIMS • Auditorium • Administration ES Aux • Classrooms Drop off • SSIMS - Construct Expanded New • Administration, MP Rms parking Health ES • Phys Educ Complex • Science Classrooms MS • Multipurpose room MS Addition addition • SCES - Construct • New Entry • Administration Abandon • 4 classrooms • Multipurpose room addition • Add Parking Current Scope of Work

  7. Educational Specifications

  8. Educational Specifications

  9. ▪ Main Entry ▪ Not Accessible ▪ Not Secure ▪ Remote PE Facilities ▪ Abandoned Auditorium ▪ No dedicated MS Performance Space ▪ Corridor Bottle Neck Issue PE Re-Entry Not Accessible PE Entry (Not Accessible) SSIMS Plan Issues

  10. ▪ Shared Classroom wing with SCES ▪ Corridor Bottle Neck Issue SSIMS Second Floor Plan

  11. MECH MECH SSIMS Third Floor Plan

  12. Second Floor Main Level ▪ Design Issues ▪ Challenging Topography for access ▪ “Symbolic Entry” is one floor below main school level ( admin, classrooms, etc.) ▪ Multipurpose Room too small ▪ Insufficient parking Lower Level Sligo Creek ES Plan Issues

  13. Abandoned Facility Entry to Stair Only Expand Maintain secondary entry SCES Lower Level Floor Plan

  14. Upper Level Entry ▪ Admin, Media, Gym on Main Level ▪ Admin has no security vestibule SCES Main Level Floor Plan

  15. ▪ SCES Currently Uses 4 Classrooms on Second Floor Corridor of MS SCES Floor Second Level

  16. ▪ Occupied During Construction ▪ PE Suite is to be moved to main Building ▪ SSIMS to gain the 4 CRs from SCES Second Floor ▪ MS gains a Dedicated Performance Space and Music Suite ▪ Provides a Secure, Accessible Main Entry to both Schools ▪ Solves the bottleneck issues at the Main Level connection between the 2 three story buildings ▪ Provides Opportunities to Improve Architectural Aesthetic Lower Level 2015 Feasibility Study Summary

  17. ES Add Drop Parking off service Bus loop MS Demo Drop existing off Transformer Site Approach

  18. Proposed Improvements

  19. SSIMS & SCRS Main Level Building Plan

  20. Main Level Entry Plan & SCES Changes

  21. Middle School Lower Level Plan

  22. ▪ s t h e Lower Level Plan

  23. Middle School Second Level Plan

  24. Second Level Plan

  25. Section thru Entry illustrating the Open Stair Section thru Light Well Section thru length of building illustrating two Story high Spaces Sections through Addition

  26. MECH MECH Middle School Third Level Plan

  27. SCES Linkages for Learning SSIMS SCES School Main Level Plan

  28. ▪ Neo-Georgian ▪ Symmetrical ▪ Celebrate Entrances ▪ Punched Windows ▪ Roof Forms The Existing School – Architectural Character

  29. Architecture

  30. Design A- Separate 2 Pavilions w/ Entrance

  31. Design B- Equivalent One Story Entrances

  32. Design C – Gable Ends

  33. A B C Design Approach 1

  34. Questions / Comments?

  35. Middle School Lower Level Plan

  36. SSIMS & SCRS Main Level Building Plan

  37. Middle School Second Level Plan

  38. MECH MECH Middle School Third Level Plan

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend