SLIDE 1
Middle School Addition Project Work Session #2 January 24, 2019 - - PowerPoint PPT Presentation
Middle School Addition Project Work Session #2 January 24, 2019 - - PowerPoint PPT Presentation
Silver Spring International Middle School Addition Project Work Session #2 January 24, 2019 Lack of Separate Identity of MS & ES Lack of On Site Parking Purple Line Impacts Building Organization- Feasibility Study Original
SLIDE 2
SLIDE 3
Impact of Purple Line on Site
Original Purple Line
SLIDE 4
Feasibility Study Issues - SSIMS
▪ Main Entry is Not Accessible or Secured ▪ PE Facilities are Remote and Not Accessible
▪ Safety Concerns ▪ Time Lost in Transitions
▪ No dedicated MS Performance Space ▪ No dedicated MS Elevator ▪ Shared Classroom Wing with SCES ▪ Several Spaces are Undersized
▪ MP Room ▪ PE Facilities ▪ Admin / Guidance Suite
▪ Needs
▪ Support Rooms ▪ Classrooms ▪ Science Classrooms
▪ Abandoned Spaces
▪ Auditorium
SLIDE 5
Feasibility Study Issues - SCES
- Main Entry is Not Secured
- New Entry
- Administration cannot
monitor Visiors
- 4 classrooms are in Middle
School Corridor
- Several Spaces are
Undersized
- Multipurpose room
- Health
- Insufficient Parking
SLIDE 6
Current Scope of Work
MS Addition MS ES ES Aux Drop off Expanded MP Rms Abandon New parking
- Demolish front section
- f SSIMS
- Auditorium
- Administration
- Classrooms
- SSIMS - Construct
- Administration,
Health
- Phys Educ Complex
- Science Classrooms
- Multipurpose room
addition
- SCES - Construct
- New Entry
- Administration
- 4 classrooms
- Multipurpose room
addition
- Add Parking
SLIDE 7
Educational Specifications
SLIDE 8
Educational Specifications
SLIDE 9
SSIMS Plan Issues
▪ Main Entry
▪ Not Accessible ▪ Not Secure
▪ Remote PE Facilities ▪ Abandoned Auditorium ▪ No dedicated MS Performance Space ▪ Corridor Bottle Neck Issue
PE Entry (Not Accessible) PE Re-Entry Not Accessible
SLIDE 10
SSIMS Second Floor Plan
▪ Shared Classroom wing with SCES ▪ Corridor Bottle Neck Issue
SLIDE 11
SSIMS Third Floor Plan
MECH MECH
SLIDE 12
Sligo Creek ES Plan Issues
Lower Level Main Level Second Floor
▪ Design Issues
▪ Challenging Topography for access ▪ “Symbolic Entry” is one floor below main school level ( admin, classrooms, etc.) ▪ Multipurpose Room too small ▪ Insufficient parking
SLIDE 13
SCES Lower Level Floor Plan
Expand Abandoned Facility Maintain secondary entry Entry to Stair Only
SLIDE 14
SCES Main Level Floor Plan
▪ Admin, Media, Gym on Main Level ▪ Admin has no security vestibule
Upper Level Entry
SLIDE 15
SCES Floor Second Level
▪ SCES Currently Uses 4 Classrooms
- n Second Floor
Corridor of MS
SLIDE 16
2015 Feasibility Study Summary
Lower Level Main Level Second Floor ▪ Occupied During Construction ▪ PE Suite is to be moved to main Building ▪ SSIMS to gain the 4 CRs from SCES ▪ MS gains a Dedicated Performance Space and Music Suite ▪ Provides a Secure, Accessible Main Entry to both Schools ▪ Solves the bottleneck issues at the connection between the 2 three story buildings ▪ Provides Opportunities to Improve Architectural Aesthetic
SLIDE 17
Site Approach
Bus loop ES Drop
- ff
MS Drop
- ff
Transformer service Demo existing Add Parking
SLIDE 18
Proposed Improvements
SLIDE 19
SSIMS & SCRS Main Level Building Plan
SLIDE 20
Main Level Entry Plan & SCES Changes
SLIDE 21
Middle School Lower Level Plan
SLIDE 22
Lower Level Plan
▪ s t h e
SLIDE 23
Middle School Second Level Plan
SLIDE 24
Second Level Plan
SLIDE 25
Sections through Addition
Section thru Entry illustrating the Open Stair Section thru Light Well Section thru length of building illustrating two Story high Spaces
SLIDE 26
Middle School Third Level Plan
MECH MECH
SLIDE 27
SCES School Main Level Plan
SCES Linkages for Learning SSIMS
SLIDE 28
The Existing School – Architectural Character
▪ Neo-Georgian ▪ Symmetrical ▪ Celebrate Entrances ▪ Punched Windows ▪ Roof Forms
SLIDE 29
Architecture
SLIDE 30
Design A- Separate 2 Pavilions w/ Entrance
SLIDE 31
Design B- Equivalent One Story Entrances
SLIDE 32
Design C –Gable Ends
SLIDE 33
Design Approach 1
A
B C
SLIDE 34
Questions / Comments?
SLIDE 35
Middle School Lower Level Plan
SLIDE 36
SSIMS & SCRS Main Level Building Plan
SLIDE 37
Middle School Second Level Plan
SLIDE 38
Middle School Third Level Plan
MECH MECH