me tr opolitan t r anspor tation author ity hudson yar ds
play

Me tr opolitan T r anspor tation Author ity Hudson Yar ds T - PowerPoint PPT Presentation

Me tr opolitan T r anspor tation Author ity Hudson Yar ds T OD Robe rt Pa le y MT A: Pho to g ra phe r Pa t Ca she n Aug 2014 Dire c tor, T ra nsit- Orie nte d De ve lopme nt, MT A Ma rc h 22, 2018 Hudson Ya rds Ba c kg round: L


  1. Me tr opolitan T r anspor tation Author ity Hudson Yar ds T OD Robe rt Pa le y MT A: Pho to g ra phe r Pa t Ca she n Aug 2014 Dire c tor, T ra nsit- Orie nte d De ve lopme nt, MT A Ma rc h 22, 2018

  2. Hudson Ya rds Ba c kg round: L IRR Stora g e Ya rd Construc te d 1987 in Ma nha tta n’s Industria l We st Side 1989: MT A Ma ste r Pla n propose d 1987: 26 Ac re Ya rd L IRR ope ns. T ra c ks e xte nding midtown de nsitie s we st a re be low 10th a nd 11th Ave nue s a nd to mone tize L IRR Ya rd a ir rig hts. spa c e d to a llow c olumns to support future de ve lopme nt. 2

  3. Hudson Ya rds Distric t: Ne w York City c re a te d c ompre he nsive ne ig hborhood pla n a nd fina nc e d the #7 subwa y line 1990- 2005: T ra nsforma tion of industria l we st side : City br oade ne d pe r spe c tive far • be yond MT A site City highlighte d r e lationship • be twe e n tr anspor tation inve stme nt and e c onomic de ve lopme nt Collabor ation among City and • MT A staff be gan e ar ly in land use planning pr oc e ss Compr e he nsive land use and • tr ansit plan F inanc e str ate gie s base d on • munic ipal powe r s Sourc e : HYDC 3

  4. Hudson Ya rds Distric t: City Goa ls a nd Outc ome s City Goa ls Re zoning to e xpand Manhattan busine ss distr ic t • Pr ovide tr ansit by e xte nding subway • F ast imple me ntation to me e t Olympic bid • de adline Outc ome s NYC c r e ate d financ ing me c hanism in zoning • and thr ough its industr ial de ve lopme nt age nc y E xte nsion City r aise d $3.2 billion for subway and othe r • infr astr uc tur e inc luding par ks Subway e xte nsion ope ne d 2015 • 7 line e xte nsion to 34 th St and11 th Ave 4

  5. Re ve nue sourc e s for 7 line e xte nsion One T ime Re c ur r ing De ve lopme nt Re late d Pr ope r ty T ax Re ve nue s Re ve nue s • T ax : Payme nts in L ie u of • T ax: Payme nts in L ie u of T axe s (PIL OT s) ge ne r ate d Mor tgage Re c or ding T ax by c omme r c ial pr ope r ty (PIL OMRT s) • T ax: E quivale nc y • Zoning : Distr ic t Payme nts (T E Ps) r e lating Impr ove me nt F und Bonus mainly to ne w r e side ntial (DIB) Payme nts de ve lopme nt • Zoning: Sale of E aste r n Rail Yar d T r ansfe r able De ve lopme nt Rights (E RY T DRs) 5

  6. Re ve nue g e ne ra te d throug h zoning Re ve nue Me c ha nisms 42 nd St. Distr ic t Impr ove me nt Bonus (DIB) available on the se site s E RY T DRs E RY T DRs 34 th St. Ge ne r ating Site E RY T DRs Re c e iving Site s 8 th Ave . 10 th Ave . F oc us de ve lopme nt ne a r tra nsit • Cre a te a re ve nue sourc e • 6

  7. Illustra tion of zoning bonus me c ha nisms T r ansfe r o f De ve lo pme nt Rights (“T DRs”) Comme rc ia l Offic e T owe r c a n purc ha se from two zoning funds: Distr ic t Impr o ve me nt 1) Distric t Improve me nt F und F und Bo nus (DIB) Bonus (DIB) 2)T ra nsfe r of De ve lopme nt Rig hts Base (As-Of- (T DR) from MT A e a ste rn ra il ya rds Right) De ve lo pme nt A Sourc e : HYDC 7

  8. Re ve nue g e ne ra te d throug h re a l e sta te ta x pla n with ta xe s ple dg e d to bond re pa yme nt So urc e : HYDC T ax e xe mption polic y pr ovide s e ar ly inve stor s gr e ate r be ne fit 8

  9. Hudson Ya rds Distric t: MT A L IRR De ve lopme nt Site MT A Goa ls a nd Outc ome s 2007 De ve lopme nt RF Ps • balanc e d r e al e state goals with ope r ational ne e ds of safe ty and r e liability 2008 De ve lope r (T he Re late d • Companie s and Oxfor d) jointly se le c te d by MT A and City 2013 Gr ound L e ase e xe c ute d • and c onstr uc tion star te d 2016 $1 billion bond sale • bac ke d by r ail yar d r e al e state r e ve nue s Platfor m c onstr uc tion ove r yar d “thr oat” r e quir e d c lose c oor dination be twe e n de ve lope r and L IRR ope r ating pe r sonne l. 9

  10. T ota l MT A re ve nue s will e xc e e d $1.6 billion Gr ound r e nt payme nts guar ante e d • $720 million str uc tur al platfor m financ e d by de ve lope r • Payme nt in L ie u of c onstr uc tion mate r ials sale s tax • MT A r e c e ive s payme nts for off- site air r ight sale s • 18 million sq ft total de ve lopme nt. E aste r n Yar d pr imar ily c omme r c ial. Major te nants: Coac h, L ’Or e al USA, SAP, T ime War ne r , Boston Consulting will be 2 nd talle st T ime War ne r Gr oup, We lls F ar go Se c ur itie s offic e in NYC at 1,296 fe e t 10

  11. F a c tors for suc c e ss in 7 line fina nc ing  Close c oor dination of land use planning and tr anspor tation planning  T r ansit was a c e ntr al c onc e r n of City  Coor dinate d e nvir onme ntal r e vie w  Str ong mar ke t pote ntial  Many unde r built site s due to e xisting obsole te industr ial zoning whic h pr e ve nte d de ve lopme nt  Pr oximity to CBD and to wate r fr ont c r e ating oppor tunity for both offic e and r e side ntial use s  City assume d financ ial r isk  Bac kstop antic ipate d for unc e r tain timing of c ash flows  Suppor t base d on c le ar r e lationship be twe e n de ve lopme nt and tr ansit impr ove me nts 11

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend