Pr e se ntation to Miami- - Dade County Dade County Pr e se - - PowerPoint PPT Presentation

pr e se ntation to miami dade county dade county pr e se
SMART_READER_LITE
LIVE PREVIEW

Pr e se ntation to Miami- - Dade County Dade County Pr e se - - PowerPoint PPT Presentation

Pr e se ntation to Miami- - Dade County Dade County Pr e se ntation to Miami Citize ns T r anspor tation Advisor y Citize ns T r anspor tation Advisor y Committe e (CT AC) Committe e (CT AC) July 28, 2010 CP, Pro je c t


slide-1
SLIDE 1

Pr e se ntation to Miami Pr e se ntation to Miami-

  • Dade County

Dade County Citize ns T r anspor tation Advisor y Citize ns T r anspor tation Advisor y Committe e (CT AC) Committe e (CT AC)

July 28, 2010 I mra n Gha ni, P.E ., AI CP, Pro je c t Manage r

slide-2
SLIDE 2

Ce le br ation Ballr

  • oms

12531 We st Oke e c hobe e Road (Se c ond F loor ) Hiale ah Gar de ns, F lor ida 33018

T ue sday, August 31, 2010

5:30 pm: Ope n House 6:30 pm: F

  • r

mal Pr e se ntation Public Comme nt Pe r iod

1

PUBL IC HE ARING

slide-3
SLIDE 3

L

  • c ate d in Miami- Dade and

Br

  • war

d Countie s

PD&E

Study L imits e xte nd fr

  • m

SR 836 (Dolphin E xpre ssway) to e ast of NW 57th Ave nue (Re d Road) (18 mile s)

7 Citie s 8 Inte r

c hange s

  • SR 836 (Dolphin E

xpre ssway)

  • NW 12th Stre e t
  • NW 41st Stre e t
  • NW 74th Stre e t
  • NW 106th Stre e t
  • US 27 (Oke e c hobe e Roa d)
  • I- 75
  • NW 57th Ave nue (Re d Road)

2

PROJE CT L OCAT ION

slide-4
SLIDE 4

Pr

  • je c t Obje c tive s
  • Pr
  • vide additional c apac ity to me e t e xisting and futur

e tr affic ne e ds

  • Improve roadway safe ty by alle viating e xisting roadway,

str uc tur al and c apac ity de fic ie nc ie s

PROJE CT NE E DS

T

r anspor tation De mand

  • 4% to 5% annual traffic growth

south of I- 75 from 2002 to 2008

  • 7% to 8% annual traffic growth

north of I- 75 from 2002 to 2008

  • T

r affic e xpe c te d to mor e than double by de sign ye ar

  • f 2040

3

74,700 79,100 91,300 99,800 103,400 105,700 99,400 40,300 44,600 52,900 58,100 62,100 64,900 62,000 20,000 40,000 60,000 80,000 100,000 2002 2003 2004 2005 2006 2007 2008

Years Average Annual Daily Traffic (AADT) South of I-75 North of I-75

slide-5
SLIDE 5

4

E XIST ING T YPICAL SE CT ION

South of I- 75

slide-6
SLIDE 6

5

E XIST ING T YPICAL SE CT ION

Nor th of I-75

slide-7
SLIDE 7

6

Wide n to te n (10) lane s south of I-75

PROPOSE D T YPICAL SE CT ION

slide-8
SLIDE 8

7

Wide n to e ight (8) lane s nor th of I-75

PROPOSE D T YPICAL SE CT ION

slide-9
SLIDE 9

8

Inte r

c hange impr

  • ve me nts pr
  • pose d at the following

loc ations:

  • NW 12th Str

e e t

  • NW 41st Str

e e t

  • US 27 (Oke e c hobe e Road)
  • NW 57th Ave nue

No impr

  • ve me nts at the following inte r

c hange loc ations:

  • NW 74th Str

e e t (Ne w Inte r c hange )

  • NW 106th Str

e e t

I- 75 Inte r

c hange unde r a se par ate PD&E study by F DOT Distr ic ts F

  • ur

and Six

Pr

  • pose d ne w inte r

c hange at NW 170th Str e e t unde r se par ate PD&E study by de ve lope r

INT E RCHANGE IMPROVE ME NT S

slide-10
SLIDE 10

9

T ue sday, Oc tobe r 20, 2009 Ce le br ation Ballr

  • oms

12531 We st Oke e c hobe e Road Hiale ah Gar de ns, F lor ida 33018 5:30 pm to 7:30 pm

PUBL IC INF ORMAT ION ME E T ING

slide-11
SLIDE 11

Input obtaine d fr

  • m the public , loc al age nc ie s, and

inte r e ste d stake holde r s was use d to r e fine and e valuate alte r native s

Pr

e fe r r e d Alte r native se le c te d base d on the ir impac ts to the c ommunity and e nvir

  • nme nt, c ost of c onstr

uc tion and ability to handle tr affic

  • NW 12th Str

e e t Inte r c hange

  • Build Alte r

native

  • NW 41st Str

e e t Inte r c hange

  • Build Alte r

native 1

  • US 27 (Oke e c hobe e Road)
  • Build Alte r

native 2

  • NW 57th Ave nue Inte r

c hange

  • Build Alte r

native 1

10

PRE F E RRE D AL T E RNAT IVE

slide-12
SLIDE 12

11

Pr e fe r r e d Alte r native (Build Alte r native ) Pr e fe r r e d Alte r native (Build Alte r native )

SNAPPER CREEK EXT. CANAL NW 12TH STREET REMOVE TOLL PLAZA BUILDING REMOVE TOLL PLAZA BUILDING PROPOSED ADDITIONAL RIGHT TURN LANE DOLPHIN MALL BRIDGE WIDENING

NW 12T H ST RE E T INT E RCHANGE

slide-13
SLIDE 13

12

Pr e fe r r e d Alte r native (Build Alte r native 1) Pr e fe r r e d Alte r native (Build Alte r native 1)

MDC WEST CAMPUS PROPOSED TRIPLE LEFT TURN LANES BRIDGE WIDENING PROPOSED TWO-LANE LOOP RAMP PROPOSED TRIPLE RIGHT TURN LANES SNAPPER CREEK EXT. CANAL NW 41ST STREET NW 115TH AVENUE NW 117TH AVENUE REMOVE TOLL PLAZA BUILDING PROPOSED THREE EB LANES

NW 41ST ST RE E T INT E RCHANGE

slide-14
SLIDE 14

13

Pr e fe r r e d Alte r native (Build Alte r native 2) Pr e fe r r e d Alte r native (Build Alte r native 2) US 27 (OKE E CHOBE E ROAD) INT E RCHANGE

  • W. OKEECHOBEE RD.

M I A M I C A N A L PROPOSED TRIPLE LEFT TURN LANES REMOVE TOLL PLAZA BUILDING REMOVE TOLL PLAZA BUILDING BRIDGE WIDENING PROPOSED THREE EB LANES PROPOSED NEW NB-EB EXIT RAMP PROPOSED NEW EB-SB ON-RAMP

slide-15
SLIDE 15

14

Pr e fe r r e d Alte r native (Build Alte r native 1) Pr e fe r r e d Alte r native (Build Alte r native 1)

NW 57TH AVENUE RED ROAD PROPOSED TRIPLE RIGHT TURN LANES PROPOSED DOUBLE RIGHT TURN LANES PROPOSED TWO-LANE SB-EB RAMP REMOVE TOLL PLAZA BUILDING REMOVE TOLL PLAZA BUILDING NORTH DADE LANDFILL MIAMI-DADE / BROWARD COUNTY LINE PROPOSED TWO-LANE EXIT RAMP

NW 57T H AVE NUE INT E RCHANGE

slide-16
SLIDE 16

15

E NVIRONME NT AL IMPACT S

Contamination

  • 2 Medium Risk Sites identified
  • Level 2 Contamination Assessment

recommended during final design

Wetlands

  • 55.2 Acres of Wetland Impact
  • 0.9 Acres of Other Surface Water Impact

Threatened and Endangered Species

  • Project may affect, but is not likely to

adversely affect:

− Wood Stork − Manatee − Eastern indigo snake

slide-17
SLIDE 17

16

E NVIRONME NT AL IMPACT S

Air

Quality

  • No signific ant air

quality impac ts antic ipate d

  • Constr

uc tion ac tivitie s may c ause minor shor t- te r m air quality impac ts

Noise

  • Pote ntial noise bar

r ie r s found to be r e asonable and fe asible

  • Noise Bar

r ie r loc ations will be e valuate d fur the r dur ing the final de sign phase

Cultur

al Re sour c e s

  • No ar

c hae ologic al site s ide ntifie d

  • Miami Canal e ligible for

listing

slide-18
SLIDE 18

17

  • Advanc e Notific ation - Januar

y 16, 2009

  • Pr

e se ntation to MPO Committe e s (CT AC, T PC, T PT AC) – Oc tobe r, 2009

  • Public Infor

mation Me e ting - Oc tobe r 20, 2009

  • Pr

e se ntation to MPO Committe e s – July to Se pte mbe r , 2010

  • Public He aring – August 31, 2010
  • De sign and Constr

uc tion unfunde d

Pr

  • je c t Sc he dule

PROJE CT SCHE DUL E

slide-19
SLIDE 19

18

www.T ur npike E xte nsion.c om

T URNPIKE E XT E NSION MAST E R WE BSIT E

slide-20
SLIDE 20

19

www.T ur npike E xte nsion.c om

PROJE CT WE BSIT E

slide-21
SLIDE 21

20

Imr an Ghani, P.E ., AICP Proje c t Manage r F lor ida’s T ur npike E nte r pr ise

  • P. O. Box 613069

Oc oe e , F L 34761 (407) 264- 3802 imr an.ghani@dot.state .fl.us

CONT ACT S

slide-22
SLIDE 22

INT E RCHANGE AL T E RNAT IVE S INT E RCHANGE AL T E RNAT IVE S

slide-23
SLIDE 23

22

Build Alte r native 2 Build Alte r native 2

MDC WEST CAMPUS PROPOSED TRIPLE LEFT TURN LANES BRIDGE WIDENING PROPOSED TWO-LANE EXIT RAMP PROPOSED TRIPLE RIGHT TURN LANES SNAPPER CREEK EXT. CANAL NW 41ST STREET REMOVE EXISTING ROADWAY NW 115TH AVENUE NW 117TH AVENUE REMOVE TOLL PLAZA BUILDING PROPOSED THREE EB LANES

NW 41ST ST RE E T INT E RCHANGE

slide-24
SLIDE 24

23

Build Alte r native 1 Build Alte r native 1

PROPOSED TRIPLE LEFT TURN LANES REMOVE TOLL PLAZA BUILDING REMOVE TOLL PLAZA BUILDING W . O K E E C H O B E E R D . M I A M I C A N A L BRIDGE WIDENING PROPOSED TWO-LANE EXIT RAMP PROPOSED TWO-LANE ON-RAMP PROPOSED THREE EB LANES PROPOSED DUAL LEFT TURN LANES

US 27 (OKE E CHOBE E ROAD) INT E RCHANGE

slide-25
SLIDE 25

24

Build Alte r native 2 Build Alte r native 2

NW 57TH AVENUE RED ROAD NORTH DADE LANDFILL PROPOSED TRIPLE RIGHT TURN LANES PROPOSED NEW NB TO EB RAMP PROPOSED NEW SB TO WB RAMP REMOVE TOLL PLAZA BUILDING REMOVE TOLL PLAZA BUILDING MIAMI-DADE / BROWARD COUNTY LINE PROPOSED TWO-LANE EXIT RAMP

NW 57T H AVE NUE INT E RCHANGE