Modernizing Miami- -Dade Dade s s Modernizing Miami Signal - - PowerPoint PPT Presentation

modernizing miami dade dade s s modernizing miami signal
SMART_READER_LITE
LIVE PREVIEW

Modernizing Miami- -Dade Dade s s Modernizing Miami Signal - - PowerPoint PPT Presentation

Modernizing Miami- -Dade Dade s s Modernizing Miami Signal System Signal System Visits to Operational Sites Visits to Operational Sites Based on RFI response, PWD staff developed a list Based on RFI response, PWD staff developed a


slide-1
SLIDE 1
slide-2
SLIDE 2

Modernizing Miami Modernizing Miami-

  • Dade

Dade’ ’s s Signal System Signal System

slide-3
SLIDE 3

Visits to Operational Sites Visits to Operational Sites

  • Based on RFI response, PWD staff developed a list

Based on RFI response, PWD staff developed a list

  • f the top six candidates
  • f the top six candidates
  • The Selection Committee evaluated ATMS systems

The Selection Committee evaluated ATMS systems across the country in: across the country in: – – Broward County Broward County – – Palm Beach County Palm Beach County – – Orlando Orlando – – Tallahassee Tallahassee – – Fairfax, VA Fairfax, VA – – New York City, NY New York City, NY – – Boston, MA Boston, MA – – Salt Lake City, UT Salt Lake City, UT – – Phoenix, AR Phoenix, AR – – Dallas, TX Dallas, TX

  • The Selection Committee also met with personnel

The Selection Committee also met with personnel

  • f local jurisdiction (not vendors). The goal was to
  • f local jurisdiction (not vendors). The goal was to
  • btain the customer
  • btain the customer’

’s perspective and input s perspective and input

slide-4
SLIDE 4
slide-5
SLIDE 5

Other Initiatives Other Initiatives

  • In 2007, over 500 signals on ten major corridors were re

In 2007, over 500 signals on ten major corridors were re-

  • timed

timed

  • Bus rapid transit/Transit Signal Priority Concept Plan

Bus rapid transit/Transit Signal Priority Concept Plan

  • Wireless Communications Alpha Test

Wireless Communications Alpha Test

  • New TMC

New TMC – – being planned being planned

  • Arterial CCTV

Arterial CCTV

  • ATMS integration with Dolphin Stadium Reversible Lane Control Sy

ATMS integration with Dolphin Stadium Reversible Lane Control System stem (RLCS) (RLCS)

  • Center

Center-

  • to

to-

  • center Link with FDOT District Six TMC

center Link with FDOT District Six TMC

slide-6
SLIDE 6

System Tools

slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15
slide-16
SLIDE 16

ATMS Benefits ATMS Benefits

  • Capacity for 3000+ Intersections

Capacity for 3000+ Intersections

  • Support for 30+ timing plans per intersection

Support for 30+ timing plans per intersection

  • MS Windows based software platform

MS Windows based software platform

  • Unlimited number of Operator workstations

Unlimited number of Operator workstations

  • User access from anywhere on the County network

User access from anywhere on the County network

  • Access via the Internet for authorized users

Access via the Internet for authorized users

slide-17
SLIDE 17

ATMS Benefits ATMS Benefits

  • Ability to support complex signal phasing

Ability to support complex signal phasing

  • Robust system architecture for fault

Robust system architecture for fault-

  • tolerant communications

tolerant communications

  • Integrated Real

Integrated Real-

  • time Time/Space diagram capability

time Time/Space diagram capability

  • Enhanced preemption and equipment failure detection

Enhanced preemption and equipment failure detection

  • Support for Bus Transit Signal Priority

Support for Bus Transit Signal Priority

slide-18
SLIDE 18

Questions? Questions?