  1. Modernizing Miami- -Dade Dade’ ’s s Modernizing Miami Signal System Signal System

  2. Visits to Operational Sites Visits to Operational Sites Based on RFI response, PWD staff developed a list Based on RFI response, PWD staff developed a list • • of the top six candidates of the top six candidates The Selection Committee evaluated ATMS systems The Selection Committee evaluated ATMS systems • • across the country in: across the country in: Broward County Broward County – – Palm Beach County Palm Beach County – – Orlando Orlando – – Tallahassee Tallahassee – – Fairfax, VA Fairfax, VA – – New York City, NY New York City, NY – – Boston, MA Boston, MA – – Salt Lake City, UT Salt Lake City, UT – – Phoenix, AR Phoenix, AR – – Dallas, TX Dallas, TX – – The Selection Committee also met with personnel The Selection Committee also met with personnel • • of local jurisdiction (not vendors). The goal was to of local jurisdiction (not vendors). The goal was to obtain the customer’ ’s perspective and input s perspective and input obtain the customer

  3. Other Initiatives Other Initiatives In 2007, over 500 signals on ten major corridors were re- In 2007, over 500 signals on ten major corridors were re -timed timed • • Bus rapid transit/Transit Signal Priority Concept Plan Bus rapid transit/Transit Signal Priority Concept Plan • • Wireless Communications Alpha Test Wireless Communications Alpha Test • • New TMC – – being planned being planned New TMC • • Arterial CCTV Arterial CCTV • • ATMS integration with Dolphin Stadium Reversible Lane Control System stem ATMS integration with Dolphin Stadium Reversible Lane Control Sy • • (RLCS) (RLCS) Center- -to to- -center Link with FDOT District Six TMC center Link with FDOT District Six TMC Center • •

  4. System Tools

  5. ATMS Benefits ATMS Benefits Capacity for 3000+ Intersections Capacity for 3000+ Intersections • • Support for 30+ timing plans per intersection Support for 30+ timing plans per intersection • • MS Windows based software platform MS Windows based software platform • • Unlimited number of Operator workstations Unlimited number of Operator workstations • • User access from anywhere on the County network User access from anywhere on the County network • • Access via the Internet for authorized users Access via the Internet for authorized users • •

  6. ATMS Benefits ATMS Benefits Ability to support complex signal phasing Ability to support complex signal phasing • • Robust system architecture for fault- -tolerant communications tolerant communications Robust system architecture for fault • • Integrated Real- -time Time/Space diagram capability time Time/Space diagram capability Integrated Real • • Enhanced preemption and equipment failure detection Enhanced preemption and equipment failure detection • • Support for Bus Transit Signal Priority Support for Bus Transit Signal Priority • •

  7. Questions? Questions?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.