Maximum Import Capability Stabilization and Multi-Year Allocation Straw Proposal
Catalin Micsa Senior Advisor Regional Transmission Engineer Stakeholder Meeting January 29, 2020
Maximum Import Capability Stabilization and Multi-Year Allocation - - PowerPoint PPT Presentation
Maximum Import Capability Stabilization and Multi-Year Allocation Straw Proposal Catalin Micsa Senior Advisor Regional Transmission Engineer Stakeholder Meeting January 29, 2020 ISO Public ISO Public CAISO Policy Initiative Stakeholder
ISO Public ISO Public
Catalin Micsa Senior Advisor Regional Transmission Engineer Stakeholder Meeting January 29, 2020
ISO Public
Page 2
Issue Paper Straw Proposal Revised Proposal Draft Final Proposal We are here
ISO Public
3
ISO Public
4
ISO Public
5
ISO Public
6
ISO Public
Page 7
Step 1 Determine Maximum Import Capability (MIC)
Step 2 Available Import Capability
Step 3 Existing Contract Import Capability (ETC inside loads) Step 4 Total Pre-RA Import Commitments & ETC
Step 5 Allocate Remaining Import Capability by Load Share Ratio Step 6 CAISO posts Assigned and Unassigned Capability per Steps 1-5 Step 7 CAISO notifies SCs of LSE Assignments Step 8 Transfer [Trading] of Import Capability among LSEs or Market Participants Step 9 Initial SC requests to ISO to Assign Remaining Import Capability by Intertie Step 10 CAISO notifies SCs of LSE Assignments & posts unassigned Available Import Capability Step 11 Secondary SC Request to ISO to Assign Remaining Import Capability by Intertie Step 12 CAISO Notifies SCs of LSE Assignments & posts unassigned Available Import Capability Step 13 SCs may submit requests for Balance of Year Unassigned Available Import Capability
ISO Public
8
ISO Public
9
ISO Public
10
ISO Public
11
MIC Maximum 75% Quartile A verage Median A verage Deviation Standard Deviation Eliminate years Values too high Yes Yes No No No No No Values too low No No No No Yes Yes No Variability Low Low High High High High Low
ISO Public
12
ISO Public
13
ISO Public
Slide 14
ISO Public
15
ISO Public
16
ISO Public
17
ISO Public
18
ISO Public
19
ISO Public
Page 20
ISO Public
21
ISO Public
22
0% 20% 40% 60% 80% 100% Risk Assessment
Multi-year lock 3-year lock 1-year
ISO Public
23
ISO Public
24
ISO Public
25
TIC = 500 Load share ratio Steps 3 & 4 Load share quantity Load Share after step 4 RIC assignment Actual allocation MW Effective allocation LSE 1 53 15 500*.53=265 .53/.98=.54 300*.54=162 177 177/265=.67 LSE 2 40 75 500*.40=200 .40/.98=.41 300*.41=123 198 198/200=.99 LSE 3 5 10 500*.05=25 .05/.98=.05 300*.05=15 25 25/25=1 LSE 4 2 100 500*.02=10
100/10=10
ISO Public
26
ISO Public
27
TIC = 500 Load share ratio Steps 3 & 4 Load share quantity Load Share after step 4 GRIC share RIC assignment Actual allocation MW Effective allocation LSE 1 53 15 500*.53=265 .53/.98=.54 400*.54=216.3 216-15=201.3 216.3 216.3/265=.82 LSE 2 40 75 500*.40=200 .40/.98=.41 400*.41=163.3 163.3-75=88.3 163.3 163.3/200=.82 LSE 3 5 10 500*.05=25 .05/.98=.05 400*.05=20.4 20.4-10=10.4 20.4 20.4/25=.82 LSE 4 2 100 500*.02=10
100/10=10
ISO Public
28
ISO Public ISO Public
ISO Public
30
ISO Public
Page 31