Lovers Point Coastal Access Project April 17, 2019 City Council - - PowerPoint PPT Presentation

lovers point coastal access project
SMART_READER_LITE
LIVE PREVIEW

Lovers Point Coastal Access Project April 17, 2019 City Council - - PowerPoint PPT Presentation

Lovers Point Coastal Access Project April 17, 2019 City Council City of Pacific Grove Conceptual Design 1st conceptual design developed in 2014 Discussion In 2018 100% construction drawings City received first bids for the project


slide-1
SLIDE 1

City Council City of Pacific Grove

Lovers Point Coastal Access Project

April 17, 2019

slide-2
SLIDE 2

Conceptual Design

1st conceptual design

developed in 2014

slide-3
SLIDE 3

Discussion

In 2018 100% construction drawings City received first bids for the project

in May of 2018

All bids rejected due to high

construction cost

slide-4
SLIDE 4

Discussion

Value Engineering occurred to reduce

cost

A revised project plan set was released

for a re-bid in November, 2018

slide-5
SLIDE 5

Value Engineering

 Complete removal of electrical, stairway, pervious

paver crosswalks and sitting area at Recreation Trail

 The Parking Lot Slurry Seal to be completed later

with the annual project

 City to complete the irrigation system, and

plantings

 Rock wall seating has been replaced with concrete

seating walls

slide-6
SLIDE 6

Rendering Changes

slide-7
SLIDE 7

Re-Bid Received

 Monterey Peninsula Engineering

$466,712

Earthworks Paving Contractors $520,387

Precision Grade Inc. $559,285

Graniterock $782,702

Engineers Estimate $350,091

slide-8
SLIDE 8

City Council City of Pacific Grove

Questions?