3-18-2020 Rich Proszek P.E. Senior Design Engineer Mixed Use Trail - - PowerPoint PPT Presentation

3 18 2020 rich proszek p e senior design engineer mixed
SMART_READER_LITE
LIVE PREVIEW

3-18-2020 Rich Proszek P.E. Senior Design Engineer Mixed Use Trail - - PowerPoint PPT Presentation

3-18-2020 Rich Proszek P.E. Senior Design Engineer Mixed Use Trail (Spruce to Elm & Main) Replace Water Distribution Main Storm Improvements Street Rebuild (Spruce to Elm & Main) Update Sandifur Bridge Parking Lot


slide-1
SLIDE 1

3-18-2020 Rich Proszek P.E. – Senior Design Engineer

slide-2
SLIDE 2

Mixed Use Trail (Spruce to Elm & Main) Replace Water Distribution Main Storm Improvements Street Rebuild (Spruce to Elm & Main) Update Sandifur Bridge Parking Lot

  • Timeframe: July-October 2020
slide-3
SLIDE 3

Retaining Wall 3ft - 10ft Tall Gravel “Lookout Pad” New curb & storm drainage structures Trail

slide-4
SLIDE 4

Parking Pullouts 24’ Wide Street Street, Water, Storm Improvements(Spruce to Elm) Groundwater Collection & Piping

slide-5
SLIDE 5

Trail Continues down Elm. Black Vinyl Fence or Rail for safety.

slide-6
SLIDE 6

Art Installation Improved River Access Path 30+/- Parking Stall Lot Trail Connection

slide-7
SLIDE 7

Reduce untreated storm water into the river Storm Improvements (Clarke, Maple, Wilson) Replace Water Distribution Main(Clarke, Maple, Wilson) Sanitary Sewer Improvements (Wilson) Street Rebuild (Clarke, Maple, Wilson) Storm water treatment swales (Clarke & Elm, Water & Ash)

  • Timeframe: July-October 2020, Possibly 2021
slide-8
SLIDE 8

Groundwater Collection & Piping Storm Sewer & Water Main Piping

slide-9
SLIDE 9

Storm Swale City Owned Lots Storm Piping to Water & Ash

slide-10
SLIDE 10

Storm Swale Storm Lift Station Storm Piping From Elm & Main Reconfigured “turn around” and water access point.

slide-11
SLIDE 11
  • Sanitary Sewer Lines & Structures
  • Storm Lines & Structures
  • Water Mains
  • Groundwater Collection & Piping
  • Communication Conduit

Underground Work Above Ground Work

  • New Asphalt
  • Sidewalk (North Side)
  • Gravel Parking Strip (South Side)
slide-12
SLIDE 12