LOS ANGELES RIVER VALLEY BIKEWAYS & GREENWAYS DESIGN COMPLETION PROJECT January 9, 2017 Presented by: Nur Malhis, P.E. Architectural Division Bureau of Engineering LA River Valley Bikeways & Greenways Project Scope Scope: design and


slide-1
SLIDE 1

LOS ANGELES RIVER VALLEY BIKEWAYS & GREENWAYS DESIGN COMPLETION PROJECT

Bureau of Engineering

January 9, 2017 Presented by: Nur Malhis, P.E. Architectural Division

slide-2
SLIDE 2

LA River Valley Bikeways & Greenways

Project Scope Scope: design and construct approximately 13 miles of new bath path and greenway facilities along the LA River in San Fernando Valley (SFV), which complement projects that have already been built or are underway by closing critical gaps in the public transportation system

Type Length (miles) Total in SFV ~19.5 Gaps ~13 Completed ~2.5 Design ~3.5 In Construction ~0.5

slide-3
SLIDE 3

LA River Valley Bikeways & Greenways

Overall Project Map

TAMPA RESEDA WHITE OAK BALBOA SEPULVEDA VAN NUYS WOODMAN COLDWATER CANYON WHITSETT BARHAM LANKERSHIM ZOO DRIVE START END

slide-4
SLIDE 4

LA River Valley Bikeways & Greenways

Feasibility Study Tasks

  • Right of Way Identification
  • Utility Coordination
  • Bike Path and Greenway Alignment Alternatives
  • Drainage (Biofiltration and Bioretention systems)
  • Envision Analyses
  • Strategic Phasing of Design, Bid/Award, and Construction
  • As-Built Drawings
  • Preliminary CEQA/NEPA Documentation
  • Coordination with other Segments in Design and Construction
  • Cost Analysis
  • Feasibility Study Anticipated to be Complete in Spring of 2017
slide-5
SLIDE 5

LA River Valley Bikeways & Greenways

Segments Along Valley-Existing and In Construction

West Valley – Tampa to Corbin Mid Valley –Coldwater Canyon to Whitsett Existing In Construction

slide-6
SLIDE 6

LA River Valley Bikeways & Greenways

Undercrossings Conceptual Rendering Undercrossing-Winnetka Ave Bridge

slide-7
SLIDE 7

LA River Valley Bikeways & Greenways

Renderings of Overcrossings and Tunnels Conceptual Tunnel Conceptual Overcrossing

slide-8
SLIDE 8

LA River Valley Bikeways & Greenways

Conceptual Cross Sections –Various Locations

Components: Bike /Ped Path, Wayfinding Signage, Bioswales, Integrated Seating, Habitat Refuge, Pollinator Landscape, Plant Pallete

slide-9
SLIDE 9

LA River Valley Bikeways & Greenways

Pocket Parks

FILTRATION GARDENS GATHERINE SPACE SUPERGRAPHIC HABITATE GARDEN CAFE BIKE LANE RIVER OVERLOOK

slide-10
SLIDE 10

LA River Valley Bikeways & Greenways

Community & Advisory Meetings-Feasibility Study Phase

Advisory Stakeholder Committee

Meeting Set 1: West Valley -11/30/16 ; East Valley -11/30/16

*Meeting Set 2: West Valley - 4/26/17 ; East Valley - 4/26/17

Technical Advisory Committee

Meeting No. 1: 11/16/16

*Meeting No. 2: 4/12/17

River Cooperation Committee

Meeting No 1: 7/11/16

Meeting No. 2: 01/09/17

Community

Meeting Set 1: West Valley (12/6/16) ; East Valley (12/13/16)

*Meeting Set 2: West Valley (5/9/17) ; East Valley (5/11/17) * Anticipated Dates