LOS ANGELES RIVER VALLEY BIKEWAYS & GREENWAYS DESIGN COMPLETION PROJECT January 9, 2017 Presented by: Nur Malhis, P.E. Architectural Division Bureau of Engineering LA River Valley Bikeways & Greenways Project Scope Scope: design and
LA River Valley Bikeways & Greenways
Project Scope Scope: design and construct approximately 13 miles of new bath path and greenway facilities along the LA River in San Fernando Valley (SFV), which complement projects that have already been built or are underway by closing critical gaps in the public transportation system
Type Length (miles) Total in SFV ~19.5 Gaps ~13 Completed ~2.5 Design ~3.5 In Construction ~0.5
LA River Valley Bikeways & Greenways
Overall Project Map
TAMPA RESEDA WHITE OAK BALBOA SEPULVEDA VAN NUYS WOODMAN COLDWATER CANYON WHITSETT BARHAM LANKERSHIM ZOO DRIVE START END
LA River Valley Bikeways & Greenways
Feasibility Study Tasks
- Right of Way Identification
- Utility Coordination
- Bike Path and Greenway Alignment Alternatives
- Drainage (Biofiltration and Bioretention systems)
- Envision Analyses
- Strategic Phasing of Design, Bid/Award, and Construction
- As-Built Drawings
- Preliminary CEQA/NEPA Documentation
- Coordination with other Segments in Design and Construction
- Cost Analysis
- Feasibility Study Anticipated to be Complete in Spring of 2017
LA River Valley Bikeways & Greenways
Segments Along Valley-Existing and In Construction
West Valley – Tampa to Corbin Mid Valley –Coldwater Canyon to Whitsett Existing In Construction
LA River Valley Bikeways & Greenways
Undercrossings Conceptual Rendering Undercrossing-Winnetka Ave Bridge
LA River Valley Bikeways & Greenways
Renderings of Overcrossings and Tunnels Conceptual Tunnel Conceptual Overcrossing
LA River Valley Bikeways & Greenways
Conceptual Cross Sections –Various Locations
Components: Bike /Ped Path, Wayfinding Signage, Bioswales, Integrated Seating, Habitat Refuge, Pollinator Landscape, Plant Pallete
LA River Valley Bikeways & Greenways
Pocket Parks
FILTRATION GARDENS GATHERINE SPACE SUPERGRAPHIC HABITATE GARDEN CAFE BIKE LANE RIVER OVERLOOK
LA River Valley Bikeways & Greenways
Community & Advisory Meetings-Feasibility Study Phase
Advisory Stakeholder Committee
Meeting Set 1: West Valley -11/30/16 ; East Valley -11/30/16
*Meeting Set 2: West Valley - 4/26/17 ; East Valley - 4/26/17
Technical Advisory Committee
Meeting No. 1: 11/16/16
*Meeting No. 2: 4/12/17
River Cooperation Committee
Meeting No 1: 7/11/16
Meeting No. 2: 01/09/17
Community
Meeting Set 1: West Valley (12/6/16) ; East Valley (12/13/16)