los angeles los angeles
play

Los Angeles Los Angeles California California Los Angeles County - PowerPoint PPT Presentation

Los Angeles Los Angeles California California Los Angeles County Metropolitan Transportation Authority Metro Gold Line Metro Gold Line Metro Gold Line Eastside LRT Extension Eastside LRT Extension Eastside LRT Extension Ingredients for


  1. Los Angeles Los Angeles California California

  2. Los Angeles County Metropolitan Transportation Authority Metro Gold Line Metro Gold Line Metro Gold Line Eastside LRT Extension Eastside LRT Extension Eastside LRT Extension Ingredients for Project Success Ingredients for Project Success Ingredients for Project Success Presented by K.N. Murthy Deputy Chief Capital Management Officer “There is no one giant step. It is a lot of little steps.” - Peter Cohen November 13, 2007

  3. Los Angeles County Today • 10.2 million people (population is bigger than 43 states) • 4.5 million jobs • 7.4% population growth in 1990s • Densest metropolitan area in the nation

  4. The Metropolitan Transportation Authority is. the Regional Planner the Regional Builder the Regional Operator for Los Angeles County

  5. Metro Rapid Lines

  6. Rapid Success Reduced Travel Times By 20% Increased Corridor Ridership By 20% to 30% 1/3 of ridership increase are new riders 1/3 of increase are current riders riding more often 1/3 of increase are current riders who changed routes

  7. Metro Rail

  8. 73 Miles of Metro Rail – 63 Stations 225 Rail Cars

  9. Metro Gold Line Eastside LRT Extension • 6 Mile Alignment • 1.7 Miles of Tunnel • 8 Stations (6 At- grade & 2 Underground) Gold Gold Line Line • Park & Ride Facility • Direct Connection to the Pasadena Metro Gold Line • $898.8 million • Opens in 2009

  10. Metro Gold Line Eastside LRT Extension Successful Project Execution • Environmental Planning and Community Outreach • Project Planning and FTA Approval Schedule • Developing a Reasonable Budget • Selecting the Right Contract Delivery Method • Third Party Agency/Utility Coordination • Putting Together the Right Project Team • Managing Disputes

  11. Metro Gold Line Eastside LRT Extension Environmental Planning and Community Outreach • Thorough environmental Metro Gold Line Eastside Extension planning and review 5309 Report to Qualify Major including community RAC & RAC and to Enter into Preliminary Investment Community Community Engineering Study Begin the Input Input outreach can help to 47 to 8 Draft Alternatives SEIS/SEIR avoid controversial planning decisions Complete Draft SEIS/SEIR which can lead to RAC and Construction Community difficult and costly Input environmental Mitigation mitigations. Monitoring Plan Final Design Final SEIS/SEIR Public Hearing Preliminary RAC and And Engineering Community Comments Permission Input to Enter Final Design

  12. Metro Gold Line Eastside LRT Extension Project Planning and FTA Approval Schedule • Understanding all of the steps necessary to obtain a Federal Full Funding Grant Agreement is essential in developing a realistic Project Schedule. • Bid/Award and Construction NTP will be held up if approvals are not in place.

  13. Metro Gold Line Eastside LRT Extension Developing a Reasonable Budget Metro Gold Line Eastside Extension Project Budget Comparison by Element Original Budget vs. Current Budget • Developing Original (FFGA) Budget Current Budget 2004 2007 Project Contingency reasonable budgets Project Finance/Revenue Project Finance/Revenue 1.1% Project Contingency 1.6% 1.1% 6.7% Professional require estimates that Services Professional 15.1% Services 15.1% take into account Right-of-Way 4.7% construction material Special Right-of-Way Conditions 4.5% and labor cost trends. 4.9% Special • Limited funding leads Conditions 2.2% Construction 72.6% to decisions as to how Construction 70.4% the budget should be Original Current Difference Cost in $ mil. Budget Budget Construction 633.2 652.0 18.8 allocated against cost Special Conditions 19.5 43.9 24.4 Right-of-Way risks and the 40.4 42.3 1.9 Professional Services 135.3 135.8 0.5 remaining project Project Contingency 60.2 14.6 -45.6 Project Finance/Revenue 10.2 10.2 0.0 contingency. TOTAL 898.8 898.8 0.0

  14. Metro Gold Line Eastside LRT Extension Risk Assessment Process I dentify Risks Assessment Risk Evaluate and Measure Risk Tracking Risk Plan and Organize Risk Management Strategies Mitigation Avoidance Control Retention Transfer Risk Select Mix of Control I nstruments Monitor and Evaluate Performance

  15. Metro Gold Line Eastside LRT Extension Management of Highest Risk Elements Each risk assessment item is comprised of the following: • Risk Owner • Potential of Risk Being Realized (Low/Medium/High) • Probability of Occurrence as a Percentage • Strategy Summary (Avoid/Transfer/Mitigate/Accept) • Timetable • Dollar Impact to Project Per Risk Register • Project Contingency Set-Aside • Schedule Impact to Project in Working Days and • Project Schedule Contingency in Working Days

  16. Metro Gold Line Eastside LRT Extension Management of Highest Risk Elements Risk Assessment/Register Flowchart PCM* reviews/updates PCM* prepares overall PCM* prepares Risk Register with risk project forecast in and issues current owners, Project connection with risk register to risk Managers, Project forecast updates from owners Director & Chief Capital functional managers Management Officer Risk Register * PCM – Project Control Manager

  17. Metro Gold Line Eastside LRT Extension Selecting the Right Contract Delivery Method • The bidding Design Bid Build climate and cost $7 Million (By Caltrans) risk factors must be considered in Design Bid Build selecting the $115 Million (C0800) appropriate Contract Delivery Method for the Project. • Weighing Owner Risk vs. Contractor Design Build Risk in the amount $350 Million of engineering (C0801) details is an important decision. Los Angeles Metro Gold Line Eastside Extension Project

  18. Metro Gold Line Eastside LRT Extension Third Party Agency/Utility Coordination • Early coordination to define project scope, limits and cost responsibilities • Reduced risk perception by Design/Builders • More competitive price bids • Roles and responsibilities clearly defined to expedite approvals during design and construction • Reduced potential for third party claims and adversarial relationships

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend