MAYOR’S CABINET PRESENTATION MAYOR’S CABINET PRESENTATION July 9, 2018 July 9, 2018
LOS ANGELES STREET LOS ANGELES STREET CIVIC BUILDING CIVIC BUILDING
01
180928_v2.1
JANUARY 29, 2019 https://civiccenterprojects.lacity.org
LOS ANGELES STREET LOS ANGELES STREET CIVIC BUILDING CIVIC - - PowerPoint PPT Presentation
LOS ANGELES STREET LOS ANGELES STREET CIVIC BUILDING CIVIC BUILDING JANUARY 29, 2019 MAYORS CABINET PRESENTATION MAYORS CABINET PRESENTATION https://civiccenterprojects.lacity.org July 9, 2018 July 9, 2018 180928_v2.1 01 OUR FUTURE
MAYOR’S CABINET PRESENTATION MAYOR’S CABINET PRESENTATION July 9, 2018 July 9, 2018
01
180928_v2.1
JANUARY 29, 2019 https://civiccenterprojects.lacity.org
OUR FUTURE WORKPLACE OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN CIVIC CENTER MASTER PLAN
Vision District Design Guidelines Los Angeles Street Civic Building
PROCESS AND NEXT STEPS PROCESS AND NEXT STEPS
P3 - DBFOM Delivery Method LASCB Space Programming Questionnaire
02
03
CIVIC CENTER DISTRICT DESIGN GUIDELINES
Union Station
Temple St. 1st St. 2 n d S t . Spring St. Main St. L
A n g e l e s S t . J u d g e J
n A i s
t . Grande Ave. Alameda St. 1st St.
180927_v2.0
LAPD CalTrans CITY HALL
Demolition Design Information Technology Decabling Hazardous W aste R emoval Building Deconstruction Site Grading 19’ Below Street Level
DRAFT CONCEPTUAL DESIGN
PH.A PH.D PH.B PH.F PH.E PH.C
LOS ANGELES STREET CIVIC BUILDING 04
180927_v2.0
https://civiccenterprojects.lacity.org/projects/civic-center-master-plan-environmental-impact-report-eir
Demolition Design Information Technology Decabling Hazardous W aste R emoval Building Deconstruction Site Grading 19’ Below Street Level
PHASE B PHASE B PHASE C PHASE C PHASE D PHASE D PHASE E PHASE E PHASE F PHASE F PHASE A PHASE A
LOS ANGELES STREET CIVIC BUILDING
05
CIVIC OFFICE RETAIL TOTAL: 750,000 SF CIVIC OFFICE RETAIL TOTAL: 360,000 SF RESIDENTIAL RETAIL TOTAL: 659,000 SF CIVIC OFFICE RETAIL FLEX TOTAL: 750,000 SF RESIDENTIAL RETAIL TOTAL: 610,000 SF CULTURAL CIVIC PLAZA TOTAL: 77,000 SF
Demolition Design Information Technology Decabling Hazardous W aste R emoval Building Deconstruction Site Grading 19’ Below Street Level
DEMOLITION DRAWINGS RELOCATION OF INFORMATION TECHNOLOGY CABLING IN COLLABORATION WITH ITA ARTWORK PRESERVATION AND RELOCATION IN COLLABORATION WITH DCA REMOVAL OF HAZARDOUS MATERIALS BUILDING DECONSTRUCTION SITE GRADING TO 19 FT. BELOW STREET LEVEL DEMOLITION COMPLETION DECEMBER 2019 06
Demolition Design Information Technology Decabling Hazardous W aste R emoval Building Deconstruction Site Grading 19’ Below Street Level
BUREAU OF ENGINEERING BOARD OF PUBLIC WORKS MUNICIPAL FACILITIES COMMITTEE
PERKINS + WILL
PREPARE PRE-DESIGN DOCUMENTS
P3 DEVELOPER TEAM
07
PROJECT ORGANIZATIONAL STRUCTURE CITY ADMINISTRATIVE OFFICE CITY LEGISLATIVE ANALYST MAYOR'S OFFICE
ASHURST
OUTSIDE COUNSEL
ARUP
RFQ/ RFP WRITER CITY P3 ADVISOR
Demolition Design Information Technology Decabling Hazardous W aste R emoval Building Deconstruction Site Grading 19’ Below Street Level
R emoval tion
DRAFT CONCEPTUAL DESIGN
08
Demolition Design Information Technology Decabling Hazardous W aste R emoval Building Deconstruction Site Grading 19’ Below Street Level
27 - 29 STORY, 753,740 S.F., APPROX. 1,173 SUBTERRANEAN PARKING COMMERCIAL SPACE AREA 65,000 S.F. RANGE OF OCCUPANTS 2,600 -3,200 INNOVATIVE CONSIDERATIONS:
CONFERENCE CENTER COLLABORATIVE WORK SPACES WITH STAFF HOTELING LEED PLATINUM SECURITY MEASURES AUTOMATED PARKING
09 27 - 29 STORY (753,740 SF., APPROX.) 1,173 SUBTERRANEAN PARKING SPACES 65,000 SF. OF COMMERCIAL SPACE 2,600 - 3,200 RANGE OF OCCUPANTS INNOVATIVE CONSIDERATIONS CONFERENCE CENTER COLLABORATIVE WORK SPACES LEED PLATINUM / NET-ZERO SOPHISTICATED SECURITY AUTOMATED PARKING
Demolition Design Information Technology Decabling Hazardous W aste R emoval Building Deconstruction Site Grading 19’ Below Street Level
IN COLLABORATION WITH THE CHIEF DESIGN OFFICER, THE PLANNING DEPARTMENT AND THE DEPARTMENT OF TRANSPORTATION
STANDARDS
SIDEWALKS)
10 http://clkrep.lacity.org/onlinedocs/2015/15-0554_rpt_CAO_01-09-2017.pdf
11
Design Competition - RFP Process Construction Completed by 2023 Estimated Capital Costs approximately $700M+
12
http://clkrep.lacity.org/onlinedocs/2014/14-1604_rpt_CAO_05-25-2018.pdf
(Present - December 2018)
(Present - December 2018)
(Scheduled completion December 2019)
July 2018 - April 2019
(Target August 2023)
TASK A: PROGRAMMING TASK B: PERFORMANCE SPECIFICATION TASK C: DESIGN GUIDELINES FOR CIVIC CENTER TASK D: OPERATIONS & MAINTENANCE
CONSULTANT TO WRITE RFQ/RFP AND PROVIDE ADVICE ON FINANCIAL & ASSET DISPOSITION.
TO ASSIST AS NECESSARY DURING RFQ/RFP & IN WRITING PROJECT AGREEMENT
13
Demolition Design Information Technology Decabling Hazardous W aste R emoval Building Deconstruction Site Grading 19’ Below Street Level
14
TASK A: FACILITY PROGRAMMING
· STREETS AND OPEN SPACES · BUILDINGS AND ARCHITECTURE · IDENTITY AND WAYFINDING · MOBILITY AND TECHNOLOGY · ETC... · FACILITY MANAGEMENT
· UTILITY MANAGEMENT · HELPDESK · HOUSEKEEPING · LANDSCAPE · SECURITY
· PARKING · REPAIRS
· LIFE CYCLE MAINTENANCE · ETC...
· SPACE PROGRAMMING · SPACE DATA · BLOCKING/STACKING DIAGRAMS · PARKING STRATEGIES · ETC...
TASK B: ARCHITECTURAL AND ENGINEERING PERFORMANCE SPECIFICATIONS
UNIFORMAT II SPECIFICATIONS (TO LEVEL 4) FOR: · A - SUBSTRUCTURE · B - SHELL · C - INTERIORS · D - SERVICES · E - EQUIPMENT & FURNISHINGS · F - SPECIAL CONSTRUCTION & DEMOLITION · G - BUILDING SITEWORK · ETC...
TASK C: CIVIC CENTER MASTER
PLAN DISTRICT DESIGN GUIDELINES
TASK D: OPERATING AND
MAINTENANCE SPECIFICATIONS
Demolition Design Information Technology Decabling Hazardous W aste R emoval Building Deconstruction Site Grading 19’ Below Street Level
CITY'S GOAL IS TO HAVE:
START OF
DESIGN & CONSTRUCTION APPROXIMATELY LATE 2020
FACILITY
GRAND OPENING APPROXIMATELY EARLY 2024
15