I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Headquarters U.S. Air Force
Logistics Transformation Capability Initiatives
1
- Ms. Keely Galloway
Logistics Transformation Capability Initiatives Ms. Keely Galloway - - PowerPoint PPT Presentation
Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Logistics Transformation Capability Initiatives Ms. Keely Galloway AF/A4PT 6 June 2017 1 Agenda AF/A4PT Mission Capability Initiative Overview
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
1
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
2
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
3
Mission: Drive Transformation through standardized Business Process Reengineering (BPR), project management, and integration across the Logistics Enterprise
Staff: 6 Civilian Logisticians and approximately 36 contractors, with functional responsibility for guiding AF Logistics Transformation initiatives through development
Lead process facilitator for Logistics BPR; coordinating with and supporting PEO/BES and program offices through development & delivery
Standardize use of transformational BPR; ensuring repeatable & agile processes
Responsible for cross-initiative Integration and alignment with Enterprise Logistics Flight Plan and Technology Annex
Ensure Transformation is achieved via rigorous Business Process Reengineering and COA selection to deliver the best fit solution
2006 - 2010 2011 2012 2013 2014 2015 2016 2017
LTO established under AF/A4I ECSS Cancelled AF/A4I merged into AF/A4P
SDDP BCAC
AF/A4PT transition to AFMC AF/A4PT tasked with Post-ECSS Strategy
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
4
As of: 27 Sep 16
Standard depot maintenance operations supported by agile and integrated planning, scheduling, and execution processes
Maintenance Repair and Overhaul (MRO)
Provide standardized and configured Item data from a single authoritative source; ensuring foundational logistics processes are executed using the same data source
Item Master
Simplified, standardized processes to fundamentally enhance the business operations for the Air Force Supply community
Supply
Air Force’s field maintenance community capabilities across Mission Generation Network and Repair Network business areas
Field Maintenance
Standardized technical data that is configuration managed from a single authoritative source to provide a foundation for downstream logistics processes Integrated capability for managing supply chain planning as a component of an overall logistics approach to optimize weapon system availability, improve maintenance operations, and effectively position assets
Product Lifecycle Management (PLM)
Enterprise Supply Chain Analysis, Planning & Execution (ESCAPE) Pre BCAC Acquisition ATP Decision Post BCAC Acquisition ATP Decision Property accountability / control of contractor managed and possessed government materiel
Government Furnished Materiel – Accountability (GFM-A)
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
LCI FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 Item Master / Class V GFM-A Supply Field Mx
5 S:1 S:2 S:3 S:4-6 BPR Step: TODAY RRE
S:3 S:2 S:1
DPAS Solution
S:3 S:2 S:1 S:3 S:2
Acquisition
S:1
MDD Approved MDD Anticipated Contract Start ** ECDs are draft **
S:3 S:2 S:1
Acquisition F Limited Fielding CTMA 2.0
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
6
Documents Documents Unverified System System
Traditional DoD Acq Starts as ACAT III, …then Grows to ACAT I Agile Increments
Traditional ACQ in DoD
Process & Document driven Costs and Risks grow over time Success = Meeting Milestones Value delivered late (if at all...)
Timeline scale in Quarters & Years Timeline scale in Weeks & Months
Documents
MS A MS B
Problem Statement
Scaled Agile Framework
Minimal Documentation Costs & Risks go down over time Success = Delivered Code/System Value delivered Early & Often
Sprint 0 Sprint 1 Sprint 2 Sprint 3 Sprint 4 Sprint 5 Sprint 6 Sprint 7
Value Value
Planning Sprint
DoDI 5000.02
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
IMLCI addresses logistics data challenges: single source of truth,
configurable views, visible at all levels, foundational item data capability
SDDP Step-3 COA/AoA process identified a reusable USMC PM-Ammo
solution that met >80% of requirements OOTB
4 Mar 16, AF/A4 approved 9-month Risk Reduction Effort that includes:
Configuration and demonstration of AF business processes, data structures, and
100 named user licenses
Direct OEM/Commercial support with Agile development
18 Mar 16, PEO/BES approved funding for RRE; contract award 20 Jun 16
7
PM-Ammo Ground Only
Risk Reduction Effort
Sprint 1 Sprint 2 Sprint 3 Sprint 4 Sprint 5 Sprint 6 Sprint 7
3000 AF Items 250 Attributes 5 Interfaces Complete Round Code IUID Lifecycle Mgmt Org/Shop Vis/Movement Disconnected Ops Custom GETAC Interface Data at the Speed of Ops
AF Item Data Mgmt Munitions Mgmt FIAR DLMS IUID Agile
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
8
IMLCI Scope CTMA 1.0 Scope CTMA 2.0 Scope
IMCS
D043 D043 A D043 B D143 C D220 D155 D169 D086 D046 D036 D071
IMCS
D043 D043 A D043 B D143 C D220 D155 D169 D086 D046 D036 D071
Class V Data
Munitions Cluster
IMDB RAM Classi fied AMST Hollo wman CAS Amm
RAM S/TM RS Amm
SIPR MC2
IMCS
D043 D043 A D043 B D143 C D220 D155 D169 D086 D046 D036 D071
Core Lifecycle Logistics (Items)
(Foundation) Risk Reduction Effort
Prototype to Production
Requirements
Capability
for opportunities
11 Systems 11 Systems 11 Systems 9 Systems
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
9
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7 Enhance AF decision making - Improve Combat Support to the Warfighter
Enables Complete Supply Logistics Capability
Providing Total Asset Visibility across the Supply Chain
Providing accurate Supply accountability, reducing on-hand inventory
Reducing Cannibalization Rates, MICAPS and Backorders
Delivering required Financial information
Providing Lifecycle Asset Management
10
Supply
Order Management Inventory Management Procurement Asset Management
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
11 11
and Retail
for items requiring special handling
Order Management
maintenance
Inventory Management
MIPR Package processes
status visibility
Procurement
Standardized Supply Process
Asset Management
As of 7 Sep 16
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
The Field Mx initiative will improve the Air Force Field Maintenance communities’ capability across Mission Generation Network and Repair Network business areas—addressing planning, scheduling, execution & oversight functional deficiencies:
12
repair nodes
engineering, supply and depot mx
capabilities required by emerging weapon systems as evident in 5th generation aircraft fleets
Field Mx
Capability 1 Enhanced Work Control Capability 2 Optimized Mx Support Capability 3 Net-centric Mx Support Capability 4 Agile and Consistent Mx Decision Support
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
Improved MC Rates, Reduced Cost of Mx, Improved QoL
13
documentation
Capability 1 Enhanced Work Control
to execution
activities at wing level and repair network
Capability 1 Optimized Maintenance Support
automated in-flight "debriefing“ automated fault-signals fed to MIS automated fleet analytics
specific Mx Information Systems (MIS).
such as High Velocity Maintenance (HVM) concepts
Capability 1 Net-centric Maintenance Support
weapon system management
training, and emergent Mx requirements
decisions
Capability 1 Enhanced Work Control
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
14