SLIDE 1
Local Planning Panel 5 February 2020
12 Toxteth Road, Glebe D/2019/1242 Applicant: Maira Zugman Owner: Paul Rathborne Architect: Cadence & Co Design
SLIDE 2 proposal
- amending development application to modify previously approved
alterations and additions to the existing dwelling (approved under D/2018/681)
- the following amendments are proposed:
― construction of a new basement ― increase in width of rear garage and studio by 360mm ― re-configuration of garage windows and doors ― repositioning of swimming pool ― installation of new solar panels R1 Zone: the development is permissible with consent
SLIDE 3
recommendation
approve subject to conditions
SLIDE 4 notification information
- exhibition period 12 November 2019 to 26 November 2019
- 58 properties were notified
- 27 submissions were received (26 objections and 1 non-
- bjection)
SLIDE 5 submissions
- damage to neighbouring property through excavation
- water table issues
- noise impacts
- traffic management
- use of basement as habitable space
- cost of works
SLIDE 6 subject site submitters
submissions
SLIDE 7
site
SLIDE 8
site
site viewed from Toxteth Road
SLIDE 9
rear of site - Church Lane
SLIDE 10
rear of site and neighbouring laneway development at 14 Toxteth Road
SLIDE 11
rear of site – looking west site
SLIDE 12
alterations and additions approved under D/2018/681/A – laneway elevation
background
SLIDE 13
alterations and additions approved under D/2018/681/A – east elevation
SLIDE 14
alterations and additions approved under D/2018/681/A – ground floor plan
SLIDE 15
proposed new basement
proposal
SLIDE 16
proposed ground floor plan
SLIDE 17
proposed first floor plan
SLIDE 18
proposed roof plan
SLIDE 19
side elevations
SLIDE 20
sections
SLIDE 21
laneway elevation
SLIDE 22
section
SLIDE 23
compliance with key LEP development standards
control proposed compliance
height 6m 5.6m yes floor space ratio 0.7:1 0.51:1 yes
SLIDE 24 issues
- basement addition
- noise impacts
SLIDE 25 basement addition
- ground water - the proposed development will not penetrate or displace the
water table
- excavation - basement is appropriately setback from side boundaries
- conditions are recommended to address construction impacts:
- dilapidation reports be prepared for adjacent property
- structural certification to be submitted at CC stage
- construction management plan be prepared
- condition on use of high noise emission appliances
SLIDE 26 noise
- air conditioning unit is located along SW boundary of site
- mechanical equipment located in the NW corner of the basement
- condition recommended to address emission of noise
SLIDE 27 recommendation
- approval subject to conditions