Lahontan Basin Area Office Water Supply Outlook
March 2019
Presented by: Dan Lahde
Lahontan Basin Area Office Water Supply Outlook March 2019 - - PowerPoint PPT Presentation
Lahontan Basin Area Office Water Supply Outlook March 2019 Presented by: Dan Lahde Topics Newlands Project Credit Water Water Year 2019 Outlook NRCS/RFC Forecasted Data Current/Projected Reservoir Operations 2 Truckee and
Presented by: Dan Lahde
2
LAKE TAHOE DONNER INDEPENDENCE PROSSER Tahoe City MARTIS Nixon Fernley Derby Dam WINNEMUCCA LAKE (dry) STAMPEDE TRUCKEE RIVER CARSON LAKE CARSON RIVER Pyramid Lake Indian Reservation Stillwater NWR LAHONTAN BOCA Reno/Sparks Newlands Project Carson City Fallon Fallon Indian Reservation PYRAMID LAKE MARBLE BLUFF TRUCKEE CANAL
3
4
5
6
7
8
9
10
RFC Mar 10 Forecast
11
RFC Mar 10 Forecast
12
RFC Mar 10 Forecast
13
Farad AJ Vol (KAF) Carson AJ Vol (KAF) Tahoe Gate Closed Rise (ft.) 30% (W) 563 330 2.6 50% (M)
487 275 2.1
70% (D) 389 196 1.6
14
15
16
17
18
19
20
21
22
23
47 out of 59 Traces (79%) store on the boards 20 of 59 Traces (33%) stores to the top of the boards
24
26 of 59 (43%) Traces Require Precautionary Drawdown
25
CKM6
Slide 25 CKM6 Need to edit
Clancey, Katherine Marie, 3/8/2019
26