kentfield school district
play

KENTFIELD SCHOOL DISTRICT MASTER PLANNING PRESENTATION KENTFIE - PowerPoint PPT Presentation

KENTFIELD SCHOOL DISTRICT MASTER PLANNING PRESENTATION KENTFIE NTFIELD D SCHOOL OOL DISTRIC RICT PTA DECEMBER 8, 2014 L I S T E N C O L L A B O R A T E C R E A T E INTROD RODUCTI UCTION TO CSDA Educational facilities planners


  1. KENTFIELD SCHOOL DISTRICT MASTER PLANNING PRESENTATION KENTFIE NTFIELD D SCHOOL OOL DISTRIC RICT PTA DECEMBER 8, 2014 L I S T E N C O L L A B O R A T E C R E A T E

  2. INTROD RODUCTI UCTION TO CSDA • Educational facilities planners since 1952 • 55 employees in San Francisco, Los Angeles and San Diego • Served as consultants to educational facilities planners worldwide Understand and integrate 21 st Century Design Principles • • Look to partner with clients to create long-term, meaningful, professional relationships

  3. CSDA’S HISTORY WITH KENTFIELD SCHOOL DISTRICT

  4. PROCESS CESS Our Master Plan Process 3 4 1 2 Existing Existing Steering Verification Facilities Site Committee / of ED Plan + + + 9 Analysis Analysis Site Groups MASTER PLAN = 5 6 7 8 Site Outreach Verification Concept Groups of Inputs Sketches + + Input

  5. PROCESS CESS 1 2 4 3 Steering Verification Existing Existing Committee of ED Plan Site Facilities STEP 1: Steering Committee / + + + / Site Analysis 9 Analysis Site Groups Groups MASTER PLAN = 5 6 8 7 Site Outreach Concept Verification Groups Sketches of Inputs + + + Input 1 Steering Committee / = Site Groups Purpose: Steering Group- To oversee, interpret, direct and implement the Master Plan Site Groups – To provide programming input which informs the Master Plan Participants: Steering Group – Superintendent, Administrators, Staff, Teachers, Stakeholders Site Groups – Site Representatives

  6. PROCESS CESS 1 2 4 3 Steering Verification Existing Existing Committee of ED Plan Site Facilities + + STEP 2: Verification of ED Plan + / Site Analysis 9 Analysis Groups MASTER PLAN = 5 6 8 7 Site Outreach Concept Verification Groups Sketches of Inputs + + + Input 2 Verification of ED Plan = Purpose: Verification of educational philosophy, beliefs and mission Participants: Steering Committee, Architect (stakeholders if needed)

  7. PROCESS CESS 1 2 3 4 Steering Verification Existing Existing Committee of ED Plan Facilities Site STEP 3: Existing Facilities + + + / Site 9 Analysis Analysis Analysis Groups MASTER PLAN = 5 6 8 7 Site Outreach Concept Verification Groups Sketches of Inputs + + + Input 3 Existing Facilities = Analysis Purpose: Evaluation of existing facilities’ conditions to determine physical condition and educational adequacy Participants: Director of Facilities, Architect, Consultants, Special Consultants (as needed)

  8. PROCESS CESS 1 2 3 4 Steering Verification Existing Existing Committee of ED Plan Facilities Site + + STEP 4: Existing Site Analysis + / Site 9 Analysis Analysis Groups MASTER PLAN = 5 6 8 7 Site Outreach Concept Verification Groups Sketches of Inputs + + + Input 4 Existing Site = Analysis Purpose: Obtain an understanding of the site’s opportunities and challenges Participants: Architect, Consultants, Special Consultants (as needed)

  9. PROCESS CESS 1 2 3 4 Steering Verification Existing Existing Committee of ED Plan Facilities Site + + STEP 5: Site Groups Input + / Site 9 Analysis Analysis Groups MASTER PLAN = 5 6 8 7 Site Outreach Concept Verification Groups Sketches of Inputs + + + Input 5 Site Groups = Input Purpose: Meet with specific site groups to explore / benchmark various elements in support of the educational plan. Areas may include: technology, sustainability, parking, performing arts, student services, demographics, real estate acquisition Participants: Site Groups, Architect

  10. PROCESS CESS SITE GROUPS INPUT SITE GROUPS Technology • Sustainability • Performing Arts • Athletics • Food Service • Student Services • Demographics • Real Estate Acquisition • Security • 21 ST Century Learning • STEERING To Master Plan COMMITTEE

  11. PROCESS CESS 1 2 3 4 Steering Verification Existing Existing Committee of ED Plan Facilities Site + + STEP 6: Outreach + / Site 9 Analysis Analysis Groups MASTER PLAN = 5 6 8 7 Site Outreach Concept Verification Groups Sketches of Inputs + + + Input 6 Outreach = Purpose: Explore issues, provoke discussion / debate, build consensus Participants: Steering Committee, Stakeholders, Architect

  12. PROCESS CESS OUTREACH STAKEHOLDERS Parents • Neighbors • Donors • Local Business Partners • Foundation • Historical Society • After School Programs • Campus Usage • To Master Plan STEERING GROUP

  13. PROCESS CESS 1 2 3 4 Steering Verification Existing Existing Committee of ED Plan Facilities Site + + STEP 7: Verification of Inputs + / Site 9 Analysis Analysis Groups MASTER PLAN = 5 6 8 7 Site Outreach Concept Verification Groups Sketches of Inputs + + + Input 7 Verification of Inputs = Purpose: Review of all pertinent data to confirm basis of design, educational program, mission/vision and existing conditions. Steering Committee and Stakeholders agree upon present and future facilities needs Participants: Steering Committee, Architect, Stakeholders (if needed)

  14. PROCESS CESS 1 2 3 4 Steering Verification Existing Existing Committee of ED Plan Facilities Site + + STEP 8: Concept Sketches + / Site 9 Analysis Analysis Groups MASTER PLAN = 5 6 8 7 Site Outreach Concept Verification Groups Sketches of Inputs + + + Input 8 Concept Sketches = Purpose: A series of graphic choices that will enable you to select the best scheme for your future needs Participants: Steering Committee, Architect

  15. PROCESS CESS 1 2 3 4 Steering Verification Existing Existing Committee of ED Plan Facilities Site + + STEP 9: Master Plan + / Site Analysis 9 Analysis Groups MASTER PLAN = 5 6 8 7 Site Outreach Concept Verification Groups Sketches of Inputs + + + Input 9 MASTER PLAN = Purpose: Document the process and results of identified current conditions and future facilities needs. Provide a specific plan for implementation Participants: Steering Committee, Architect

  16. SCHED EDULE LE

  17. STEERIN ERING G COMM MMITTEE ITTEE KICK ICK-OFF FF MEETING TING DECEMBER CEMBER 4, 2014 4, 2014 • Established goals for master plan • Verified Kentfield School District Strategic Plan objectives • Identified site programming groups • Discussed community outreach • Discussed master plan timeline

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.