In Inter-Regio rail services, an opportunity for a structured transport system Gabriele Venditti Master student in Public Transport Governance University Milano Bicocca Introduction Methodology System before 2005 New


slide-1
SLIDE 1

In Inter-Regio rail services, an opportunity for a structured transport system

Gabriele Venditti Master student in Public Transport Governance University Milano Bicocca

slide-2
SLIDE 2
  • Introduction
  • Methodology
  • System before 2005
  • New «stretegy» and inefficiecy
  • Example cases and key points
  • Proposal of a new governance system
slide-3
SLIDE 3

Introduction

  • Is the governance of medium distance railway service bringing

efficiency in this market segment?

  • Does it provide advantages for travellers and grant the right to

mobility?

  • How can trans-regional train service contribute to a efficient transport

system?

Medium distance journeys historically In the hand of RAILWAYS Progressive weakening of Inter-Regio services Loss of efficiency Loss of competitiveness

slide-4
SLIDE 4

Methodology

  • Public planning point of view (many qualitative aspects)
  • Official data for number of passengers provided by regional

government

  • Elaboration of data conducted in collaboration with the transport

department of Region Lombardia

  • Use of a specific “private” software for drawing timetable schemes
  • Only few data available for costs of production (use of official gross

information)

slide-5
SLIDE 5

Methodology

Reconstruction of the evolution of services in last 15 years

Changes to the structure of the service Evolution of the governance environment

  • Effects on travel solution
  • Changes in demand

(n° passengers)

  • Variation of costs

(subsidies)

Proposal for a new governance

Application of the best practices Change of view > Development of an integrated transport system New rules to define an innovative planning environment

Point out main CRITICAL ISSUES

Benchmark

slide-6
SLIDE 6

Metropolitan and Regional systems Inter Regio (medium distance) High speed / long distance

Consistent infrastructure investments Major part of national transport offer

slide-7
SLIDE 7

System before 2005

  • Implemented from 1985 on main

national axes

  • «Modern system» with regular

timetable and definition of main nodes of the network

  • System of medium and long distance

trains (Inter-Regio and Intercity)

  • No fare integration
slide-8
SLIDE 8

System before 2005

National passenger division

  • Responsible for planning the long distance service
  • Economically autonomous (sustained by fare incomes)

Organisation of National railway company from 2000 (passenger division) Regional passenger division

  • Plan the service in cooperation with regional governments
  • Regions buy the service from Railways and sign a contract service
  • Service is subsidized with public resources

Regional Long distance SYSTEM

DOUBLE REGIME

slide-9
SLIDE 9

Unification of passenger divisions Design of a new service structure Push for an increase of market-services

Long distance Medium distance Regional services Intercity Inter-Regio Regional trains * Eurostar * Intercity Regional trains Till 2005 After 2005

  • New service structure for

medium distances

  • Cut of all IR at the regional

border

  • Switch to Intercity
  • Confirmation and

strengthening of double regime

Change of strategy

slide-10
SLIDE 10

Change of strategy

Fragmentation

  • f trans

regional offer

Overlapping services Missing nodes Heavy regionalisation

slide-11
SLIDE 11

Change of strategy – lack of resources

  • Economical crisis of

FS

  • Reform of the rail

transport service

2005

  • Crisis of public

finance

  • Uncertain resources

for public transports

2007

  • New “expensive”

contract services

  • Relevant cut to

regional train service

2008

  • 19 % of

resources for period 2009- 2016

slide-12
SLIDE 12

Evolution of demand (Milano – Ventimiglia)

MI.P.GARIBALDI MI.GRECO PIRELLI

MILANO CENTRALE

MILANO LAMBRATE

MILANO ROGOREDO

Locate T riulzi Villamaggiore Certosa di Pavia

PAVIA

Cava Manara

BRESSANA BOTT.

Lungavilla

VOGHERA

Pontecurone

TORTONA

Carbonara Scriv. Villalvernia Cassano Spinola Stazzano Serrav.

ARQUATA SCRIVIA RONCO SCRIVIA

Mignanego

GENOVA P.PRINC. GE.SAMPIERDARENA

Ge.Cornigliano Genova Sestri P. Genova Pegli Genova Pra Genova Voltri Genova Vesima Arenzano Cogoleto Varazze Celle Albisola

SAVONA

Quiliano Vado Spotorno Noli Finale Ligure M. Borgio Verezzi Pietra Ligure Loano Borghetto S.S. Ceriale

Albenga

Alassio Laigueglia Andora Cervo S.Bartol. Diano Marina Imperia Oneglia

Imperia Porto M.

S.Lorenzo Cipres S.Stefano R.L. Taggia Arma

San Remo

Ospedaletti Lig. Bordighera Vallecrosia

VENTIMIGLIA lug05 B R

MI 702 MI 704

lug05 IR A

1713 1715 1725 1727 1729 1731 1759 2183 2187 2189 2191 2195 2197 2199

lug05 IR R

1707 1730 1733 1735 1737 1738 2156 2159 2161 2163 2165 2167 2172 2173 2175

lug05 R A

20253 20261 20281 20283 20289 20293 20299

lug05 R R

20252 20254 20258 20264 20268 20278 20290 20294

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 400 200 100 50

July 2005 Sunday

slide-13
SLIDE 13

Evolution of demand (Milano – Ventimiglia)

July 2006 sunday

MI.P.GARIBALDI MI.GRECO PIRELLI

MILANO CENTRALE

MILANO LAMBRATE

MILANO ROGOREDO

Locate T riulzi Villamaggiore Certosa di Pavia

PAVIA

Cava Manara

BRESSANA BOTT.

Lungavilla

VOGHERA

Pontecurone

TORTONA

Carbonara Scriv. Villalvernia Cassano Spinola Stazzano Serrav.

ARQUATA SCRIVIA RONCO SCRIVIA

Mignanego

GENOVA P.PRINC. GE.SAMPIERDARENA

Ge.Cornigliano Genova Sestri P. Genova Pegli Genova Pra Genova Voltri Genova Vesima Arenzano Cogoleto Varazze Celle Albisola

SAVONA

Quiliano Vado Spotorno Noli Finale Ligure M. Borgio Verezzi Pietra Ligure Loano Borghetto S.S. Ceriale

Albenga

Alassio Laigueglia Andora Cervo S.Bartol. Diano Marina Imperia Oneglia

Imperia Porto M.

S.Lorenzo Cipres S.Stefano R.L. Taggia Arma

San Remo

Ospedaletti Lig. Bordighera Vallecrosia

VENTIMIGLIA lug06 B A

MI 702

lug06 B R

MI 704

lug06 D R

2184 33878

lug06 IR A

1713 1715 1725 1727 1731 1759 2199 33229 33283 33287 33297 33389 33405 33407

lug06 IR R

1707 1730 1733 1735 1737 1738 2194 33409 33411 33881 33886 33889 33897

lug06 R A

20255 20259 20261 20265 20269 20277 20281 20283

lug06 R R

20252 20254 20260 20264 20266 20272 20276 20278 20280

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 400 200 100 50

Milano-Genoa-Ventimiglia 2005 2006 2015 pax

  • n

board 296 164 250 Variation

  • 44%
  • 15%
slide-14
SLIDE 14

Evolution of demand (Milano – Bologna)

MI.P.GARIBALDI MI.GRECO PIRELLI

MILANO CENTRALE

MILANO LAMBRATE

MILANO ROGOREDO

S.Donato Milan. Borgolombardo
  • S. Giuliano Mil.
Melegnano
  • S. Zenone al L.
Tavazzano Lodi Secugnago

CASALPUSTERLENGO CODOGNO

S.Stefano Lodig.

PIACENZA

Pontenure Cadeo Fiorenzuola Alseno

FIDENZA

Castelguelfo

PARMA

S.Ilario d`Enza Villa Cade`

REGGIO EMILIA

Rubiera

MODENA

C.F ranco Emilia Samoggia Anzola LAVINO

BOLOGNA C.LE gen05 B A

MI 961 MI 963

gen05 B R

MI 812 MI 962 MI 964

gen05 D A

2925 2927

gen05 D R

2912 2922

gen05 IR A

1757 2037 2039 2123 2125 2127 2129 2131 2133 2135 2137 2139 2141

gen05 IR R

2036 2038 2120 2122 2124 2126 2128 2130 2132 2134 2136 2138

gen05 R A

20401 20403 20405 20407 20411 20413 20415 20417 20419 20421 20423 20425 20427 20429 20431 20433 20435 20437 20439

gen05 R R

20400 20402 20404 20406 20408 20412 20414 20416 20418 20420 20422 20424 20426 20428 20430 20432 20434 20436 20438

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 400 200 100 50

January 2005 Working day

slide-15
SLIDE 15

Evolution of demand (Milano – Bologna)

M I.P.GARIBALDI M I.GRECO PIRELLI

MILANO CENTRALE

M ILANO LAM BRAT E

MILANO ROGOREDO

S.Donato M ilan. Borgolom bardo
  • S. Giuliano M
il. M elegnano
  • S. Z
enone al L. T avazzano Lodi Secugnago

CASALPUSTERLENGO CODOGNO

S.Stefano Lodig.

PIACENZA

Pontenure Cadeo F iorenzuola Alseno

FIDENZA

Castelguelfo

PARMA

S.Ilario d`Enza Villa Cade`

REGGIO EMILIA

Rubiera

MODENA

C.F ranco Emilia Sam
  • ggia
Anzola LAVINO

BOLOGNA C.LE gen06 B A

MI 963 MI 961

gen06 B R

MI 962 MI 812 MI 694

gen06 D R

2912

gen06 IR A

1757 2037 2039 2271 2273 2275 2277 2279 2281 2283 2285 2287 2289

gen06 IR R

2036 2038 2122 2272 2274 2276 2278 2280 2282 2284 2286 2288

gen06 R A

20351 20399 20401 20403 20405 20407 20411 20413 20415 20417 20419 20421 20423 20425 20427 20429 20431 20433 20435 20437 20439

gen06 R R

20400 20402 20404 20406 20408 20412 20414 20416 20418 20420 20422 20424 20426 20428 20430 20432 20434 20436 20438

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 400 200 100 50

January 2006 Working day

slide-16
SLIDE 16

Evolution of demand (Milano – Bologna)

MI.P.GARIBALDI MI.GRECO PIRELLI

MILANO CENTRALE

MILANO LAMBRAT E

MILANO ROGOREDO

S.Donato Milan. Borgolombardo
  • S. Giuliano Mil.
Melegnano
  • S. Z
enone al L. T avazzano Lodi Secugnago

CASALPUSTERLENGO CODOGNO

S.Stefano Lodig.

PIACENZA

Pontenure Cadeo F iorenzuola Alseno

FIDENZA

Castelguelfo

PARMA

S.Ilario d`Enza Villa Cade`

REGGIO EMILIA

Rubiera

MODENA

C.F ranco Emilia Samoggia Anzola LAVINO

BOLOGNA C.LE mar11 IR A

1757 2037 2039 2271 2273 2275 2277 2279 2281 2283 2285 2287 2289

mar11 IR R

2036 2038 2122 2272 2274 2276 2278 2280 2282 2284 2286 2288

mar11 R A

20401 20405 20407 20409 20411 20413 20415 20417 20419 20421 20423 20425 20427 20429 20431 20433 20435 20437

mar11 R R

20400 20402 20404 20408 20410 20412 20416 20420 20422 20426 20428 20430 20432 20434 20438 2910 2912 2916

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 400 200 100 50

March 2011 Working day

Milano-Bologna-Ancona 2005 2006 2014 pax

  • n

board 400 136 273 Variation

  • 66%
  • 31%
slide-17
SLIDE 17

Evolution of demand (Bologna-Torino/Genoa)

July 2005 Working day

TORINO P.NUOVA TO.LINGOTTO

Moncalieri

TROFARELLO

Cambiano Santena Pessione Villanova S.Paolo Solbrito Villafranca C. Baldichieri S.Damiano d`Asti

ASTI

Castel.d`Annone Rocchetta T.C. Masio Quattordio Felizzano Solero

ALESSANDRIA

Spinetta S.Giuliano Piem.

TORTONA

Pontecurone

VOGHERA

Casteggio S.Giuletta

BRONI

Stradella Arena Po Castel S.Giovan. Sarmato Rottofreno S.Nicolo

PIACENZA

Pontenure Cadeo Fiorenzuola Alseno

FIDENZA

Castelguelfo

PARMA

S.Ilario d`Enza Villa Cade`

REGGIO EMILIA

Rubiera

MODENA

C.Franco Emilia Samoggia Anzola LAVINO

BOLOGNA C.LE lug05 IR A

2061 2063 2065 2067 2284 2286 2288 2899

lug05 IR R

2062 2064 2066 2068 2276 2278 2280

lug05 R A

4077 4083 4093 20371 20375 20377 20379 20381 20383 20387 20389 20391 20393 20395

lug05 R R

4064 4082 10434 20372 20376 20378 20382 20384 20386 20388 20392 20394

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 400 200 100 50

slide-18
SLIDE 18

Evolution of demand (Bologna-Torino/Genoa)

TORINO P.NUOVA TO.LINGOTTO

Moncalieri

TROFARELLO

Cambiano Santena Pessione Villanova S.Paolo Solbrito Villafranca C. Baldichieri S.Damiano d`Asti

ASTI

Castel.d`Annone Rocchetta T.C. Masio Quattordio Felizzano Solero

ALESSANDRIA

Spinetta S.Giuliano Piem.

TORTONA

Pontecurone

VOGHERA

Casteggio S.Giuletta

BRONI

Stradella Arena Po Castel S.Giovan. Sarmato Rottofreno S.Nicolo

PIACENZA

Pontenure Cadeo Fiorenzuola Alseno

FIDENZA

Castelguelfo

PARMA

S.Ilario d`Enza Villa Cade`

REGGIO EMILIA

Rubiera

MODENA

C.F ranco Emilia Samoggia Anzola LAVINO

BOLOGNA C.LE lug06 IR A

2063 33001 33003 33005 33860 33866 33872

lug06 IR R

2066 2880 33868 33900 33902 33904 34326 34334

lug06 R A

20375 20379 20381 20383 20387 20389 20391 20393 20395 23631 23633 23637 23639 23643 23647 33841

lug06 R R

20372 20378 20382 20384 20386 20388 20392 20394 24600 24604 24608 24612 24616 24620

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 400 200 100 50

July 2006 Working day

slide-19
SLIDE 19

Evolution of demand (Bologna-Torino/Genoa)

TORINO P.NUOVA TO.LINGOTTO

Moncalieri

TROFARELLO

Cambiano Santena Pessione Villanova S.Paolo Solbrito Villafranca C. Baldichieri S.Damiano d`Asti

ASTI

Castel.d`Annone Rocchetta T.C. Masio Quattordio Felizzano Solero

ALESSANDRIA

Spinetta S.Giuliano Piem.

TORTONA

Pontecurone

VOGHERA

Casteggio S.Giuletta

BRONI

Stradella Arena Po Castel S.Giovan. Sarmato Rottofreno S.Nicolo

PIACENZA

Pontenure Cadeo Fiorenzuola Alseno

FIDENZA

Castelguelfo

PARMA

S.Ilario d`Enza Villa Cade`

REGGIO EMILIA

Rubiera

MODENA

C.Franco Emilia Samoggia Anzola LAVINO

BOLOGNA C.LE mar11 R A

20375 20379 20381 20387 20389 20391 20393 4297

mar11 R R

20378 20382 20384 20386 20388 20392 20396

mar11 S A

20371 20395 20399 2061 2063 2065 2067 23631 23637 23639 23643 23647 3961

mar11 S R

20372 20376 2062 2066 2076 2078 2880 3962 3966 3968 3972 6084 6092 6094 6098 6102

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 400 200 100 50

March 2011 Working day

Bologna-Genova/Torino 2005 2006 2014 pax

  • n

board 225 116 83 Variation

  • 48%
  • 62%
slide-20
SLIDE 20

New strategy – loss of efficiency

  • Inter-Regio

cancelled

  • Intercity are

supposed to bring efficiency

2005

  • Contract service also

for the Intercity

  • New category of

market trains for standard lines

2011

  • New “expensive”

contract services for intercity (14 € train*km)

2017

Loss of efficiency! No attractiveness of IC! Subsidies to ex-IR and IC !

Higher fares No integration with regional networks Higher travel times

slide-21
SLIDE 21

New strategy – loss of efficiency

Trans regional standard trains High speed Regional Suburban train services

Fast regional Inter City Freccia Bianca

Flagship market trains Regional networks

  • 3 categories of train (2

subsidized, 1 on market)

  • 3 different fare systems
  • 3 different planning

bodies

slide-22
SLIDE 22

Proposal

Many single train journeys

Fragmentation

  • f offer

Nodes Interchanges System

Integrated transport network

Need to bring efficiency Best planning practices

Integrated transport system

Re establish public control over IR service Redistribution of resources Unitary planning advantages IR base of the network

Efficiency in production Effectiveness

  • f service
slide-23
SLIDE 23

Proposal

Disorder of offer Missed connection between regional networks Interferences between trains Waste of resources and capacity “Tidy” integrated

  • ffer of transport

IR define the nodes Match of different regional systems More effective More fare incomes Less subsidies

slide-24
SLIDE 24

Proposal

Opponents

Market services Lack of vision and coordination of regional governments Monopoly of national rail operator (only actor with coordination capabilities)

Solutions

New rules for running passenger services Force the cooperation for IR trains or change the competences Public tender for service commitments

slide-25
SLIDE 25

Proposal

Fare integration

Maintain regional fare systems All trains are accessible at the same fare (Regional fare allows access to IR/IC) Trans-regional journeys’ tariff: sum of linear fares of regions crossed Allows the redistribution of fare incomes between high revenues lines and small services

New rules for market services

Allow market services where market exists and brings advantages to user Market services on long distance/high speed (elastic demand, more operators) Limit the interferences with planned system (fare competition, timetable) Minimum distance of stops: 150 km

slide-26
SLIDE 26

Proposal

Coordination

Ministry takes competences for all trans- regional trains Need to coordinate service with regions (but solutions can be imposed) Impoverishment of regional contract services Transfer of all competences for trans- regional trains to regions Need to force the collaboration of regions (incentives, resources provision) Development of 1-to-1 IR service, risk of cutting longer services

Hypothesis 1 Hypothesis 2

slide-27
SLIDE 27

Proposal

Assignment of public commitments

Competition for the market Public authorities substitute the market (define the organisation of service) Public tender for the assignment of public commitments Evolution towards a larger use of public tender (small lots, property of rolling stock, access to infrastructure)

Need of competences and resources in public bodies!

slide-28
SLIDE 28

Conclusions

Public governance of Inter-Regio rail services can bring efficiency in this transport segment Use best planning practices to develop an INTEGRATED TRANSPORT SYSTEM “Rich” train incomes can sustain minor services All trains play a defined role in the network Less costly More effective (offers travel solutions for everyone) More competitive (right to mobility) Deregulation towards market trains of IR service + regionalisation without coordination brought to a relevant loss of efficiency of the medium distance rail service