Icicle Workgroup Presentation Eight-Mile Lake Appraisal Study December 6, 2013 Mike Kaputa Dan Haller, PE Dave Rice, PE OCR Grant Overview Eight-Mile Lake Restoration / Expansion Appraisal Study: Build on TU reconnaissance / site


  1. Icicle Workgroup Presentation Eight-Mile Lake Appraisal Study December 6, 2013 Mike Kaputa Dan Haller, PE Dave Rice, PE

  2. OCR Grant Overview Eight-Mile Lake Restoration / Expansion Appraisal Study:  Build on TU reconnaissance / site investigation  Evaluate structural, operational, permitting, future use, and costs for four lake levels:  1,827 acre-feet  2,000 acre-feet  2,500 acre-feet  5,000 acre-feet Icicle Creek Water Resources Strategy Workgroup #7

  3. Icicle Creek Water Resources Strategy Workgroup #7

  4. Eight-Mile Lake Structural / Operational Overview  Masonry Rock/Concrete Wall and Earthen Embankment Dam  Earthen Embankment has Eroded at Masonry Rock/Concrete Wall  Masonry Rock/Concrete Wall is Partially Deteriorated  Spillway  Was Historically Controlled by Flash Boards at Opening in Masonry Rock / Concrete Wall  No Longer Controlled by Flash Boards, Debris in Spillway  Primary Spillway Well Appears to be Connected to Discharge Pipeline Icicle Creek Water Resources Strategy Workgroup #7

  5. Eight-Mile Lake Structural / Operational Overview  Overflow Spillway Channel  Filled with Large Rock, Boulders  Cutoff Walls Downstream of Dam  Outlet Gate (Controls Flow to Discharge Pipeline)  Original Operator Damaged, Removed  Currently Operated by Inserting Come Along into Steel Piece Attached to Stem  Rock Above, Against Gate  Difficult to Operate and Fully Close Icicle Creek Water Resources Strategy Workgroup #7

  6. Eight-Mile Lake Structural / Operational Overview  Discharge Pipeline  ~36” Corrugated Metal Pipe (CMP)  Submerged at Outlet, Rocks and Boulders  Unable to inspect submerged Inlet  Rough Measurements  ~10 Feet from Top of Wall to Spillway Inlet Crest  ~5 Feet from Spillway Inlet Crest to Water Surface  Outlet Pipe Invert ~8 to 9 Feet Below Water Surface Icicle Creek Water Resources Strategy Workgroup #7

  7. Icicle Creek Water Resources Strategy Workgroup #7

  8. Icicle Creek Water Resources Strategy Workgroup #7

  9. Icicle Creek Water Resources Strategy Workgroup #7

  10. Permitting Investigation Current focus is data gathering:  District files / institutional knowledge  Ecology files (water rights, dam safety, topic, adjudication files)  Chelan County Auditor (parcel ownership) and Superior Court (adjudication files)  DNR files  USFS files  BLM files Icicle Creek Water Resources Strategy Workgroup #7

  11. Next Steps  Develop restoration / expansion approach  Conceptual design and cost estimates  Documentation of existing permit authority  Identification of required permit authority for each option  Documentation of benefits / beneficial uses  Operational changes  Appraisal Report Icicle Creek Water Resources Strategy Workgroup #7

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.