Icicle Workgroup Presentation Eight-Mile Lake Appraisal Study December 6, 2013 Mike Kaputa Dan Haller, PE Dave Rice, PE OCR Grant Overview Eight-Mile Lake Restoration / Expansion Appraisal Study: Build on TU reconnaissance / site


slide-1
SLIDE 1

Icicle Workgroup Presentation

Eight-Mile Lake Appraisal Study

Dan Haller, PE

December 6, 2013

Dave Rice, PE Mike Kaputa

slide-2
SLIDE 2

Icicle Creek Water Resources Strategy Workgroup #7

OCR Grant Overview

Eight-Mile Lake Restoration / Expansion Appraisal Study:

 Build on TU reconnaissance / site

investigation

 Evaluate structural, operational, permitting,

future use, and costs for four lake levels:

 1,827 acre-feet  2,000 acre-feet  2,500 acre-feet  5,000 acre-feet

slide-3
SLIDE 3

Icicle Creek Water Resources Strategy Workgroup #7

slide-4
SLIDE 4

Icicle Creek Water Resources Strategy Workgroup #7

Eight-Mile Lake Structural / Operational Overview

 Masonry Rock/Concrete Wall and Earthen

Embankment Dam

 Earthen Embankment has Eroded at Masonry

Rock/Concrete Wall

 Masonry Rock/Concrete Wall is Partially Deteriorated

 Spillway

 Was Historically Controlled by Flash Boards at

Opening in Masonry Rock / Concrete Wall

 No Longer Controlled by Flash Boards, Debris in

Spillway

 Primary Spillway Well Appears to be Connected to

Discharge Pipeline

slide-5
SLIDE 5

Icicle Creek Water Resources Strategy Workgroup #7

Eight-Mile Lake Structural / Operational Overview

 Overflow Spillway Channel

 Filled with Large Rock, Boulders  Cutoff Walls Downstream of Dam

 Outlet Gate (Controls Flow to Discharge

Pipeline)

 Original Operator Damaged, Removed  Currently Operated by Inserting Come Along into

Steel Piece Attached to Stem

 Rock Above, Against Gate  Difficult to Operate and Fully Close

slide-6
SLIDE 6

Icicle Creek Water Resources Strategy Workgroup #7

Eight-Mile Lake Structural / Operational Overview

 Discharge Pipeline

 ~36” Corrugated Metal Pipe (CMP)  Submerged at Outlet, Rocks and Boulders  Unable to inspect submerged Inlet

 Rough Measurements

 ~10 Feet from Top of Wall to Spillway Inlet Crest  ~5 Feet from Spillway Inlet Crest to Water Surface  Outlet Pipe Invert ~8 to 9 Feet Below Water Surface

slide-7
SLIDE 7

Icicle Creek Water Resources Strategy Workgroup #7

slide-8
SLIDE 8

Icicle Creek Water Resources Strategy Workgroup #7

slide-9
SLIDE 9

Icicle Creek Water Resources Strategy Workgroup #7

slide-10
SLIDE 10

Icicle Creek Water Resources Strategy Workgroup #7

Permitting Investigation

Current focus is data gathering:

 District files / institutional knowledge  Ecology files (water rights, dam safety, topic,

adjudication files)

 Chelan County Auditor (parcel ownership) and

Superior Court (adjudication files)

 DNR files  USFS files  BLM files

slide-11
SLIDE 11

Icicle Creek Water Resources Strategy Workgroup #7

Next Steps

 Develop restoration / expansion approach  Conceptual design and cost estimates  Documentation of existing permit authority  Identification of required permit authority for

each option

 Documentation of benefits / beneficial uses  Operational changes  Appraisal Report