Harvey Jones Channel Improvements Project Non-Mandatory Pre-Bid Conference April 14, 2014 1 Harvey Jones Channel Improvements Project Introductions: SSCAFCA Staff Charles Thomas, P.E., Executive Engineer Jim Service, Field


slide-1
SLIDE 1

Harvey Jones Channel Improvements Project

Non-Mandatory Pre-Bid Conference April 14, 2014

1

slide-2
SLIDE 2

Harvey Jones Channel Improvements Project

  • Introductions:

– SSCAFCA Staff

  • Charles Thomas, P.E., Executive Engineer
  • Jim Service, Field Services Director
  • Debbie Casaus, Procurement Officer
  • Andres Sanchez, Drainage Engineer

– Bohannan Huston Inc.

  • Scott Armstrong, P.E.

2

slide-3
SLIDE 3

Harvey Jones Channel Improvements Project

  • Funding

– SSCAFCA Bonds Funds – State Funds – FHWA Federal Funds

  • Federal Funds mandate federal requirements

3

slide-4
SLIDE 4

Harvey Jones Channel Improvements Project

  • Where exactly is the project?

4

slide-5
SLIDE 5

Harvey Jones Channel Improvements Project

  • Current site conditions

5

slide-6
SLIDE 6

Harvey Jones Channel Improvements Project

  • Bid Highlights

– The bid includes:

  • Removal of 3,648 SY of existing concrete channel invert
  • Reshape invert into trapezoidal shape
  • Install concrete along new trapezoidal shaped invert
  • Install concrete ramps and working pad in sediment

pond at end of concrete channel

6

slide-7
SLIDE 7

Harvey Jones Channel Improvements Project

Site layout – Demolition

7

ITEMS 2 THRU 6 ARE BY OTHERS

slide-8
SLIDE 8

Harvey Jones Channel Improvements Project

  • Site Layout – Concrete placement

8

slide-9
SLIDE 9

Harvey Jones Channel Improvements Project

  • Site Layout – Concrete placement (cont’d)

9

Sediment pond Excavation by others End of existing channel New working pad And access ramps

slide-10
SLIDE 10

Harvey Jones Channel Improvements Project

  • Stormwater Pollution Prevention Plan

(SWPPP)

– The SWPPP was written to cover both the sedimentation basin excavation and the concrete removal and replacement – The successful bidder will assume maintenance of the SWPPP upon mobilization – Sediment pond excavation contractor will be complete with that element of the project by May 10, 2014

10

slide-11
SLIDE 11

Harvey Jones Channel Improvements Project

11

  • Bid Schedule

– Last day to submit written questions is Wednesday, April 16 by 5:00 PM

  • Submit all questions via e-mail to dcasaus@sscafca.com

– SSCAFCA will post responses to written questions

  • n web page by Friday, April 18 by 5:00 PM

– Bids are due to SSCAFCA by 3:00 PM on Tuesday, April 22. Public bid opening shortly after 3:00 PM.

slide-12
SLIDE 12

Harvey Jones Channel Improvements Project

  • Response to Questions vs. Addenda

– SSCAFCA may receive questions not meriting an

  • fficial Addenda (e.g. bid process questions).

SSCAFCA may issue a “Response to Questions” document that will be posted to our website to answer those questions. These DO NOT need to be acknowledged on the bid form. – Addenda will be separate documents (aside from the “Response to Questions” document) posted on our

  • website. Addenda will be clearly labeled and MUST

be acknowledged on the bid form. – It is the responsibility of the bidder to be familiar with all documents posted on the website for this bid.

12/12/2012 12

slide-13
SLIDE 13

Harvey Jones Channel Improvements Project

  • Project Schedule:

– SSCAFCA will determine the lowest responsive bidder by Thursday, April 24 – SSCAFCA will contact the lowest responsive bidder by Thursday, April 24 and begin the contracting process – Upon completion of the contracting process and issuance of notice to proceed, contractor will have until June 15, 2014 to achieve final completion.

  • Extensions MAY be granted depending on weather forecast
  • Why this last condition?

13

slide-14
SLIDE 14

Harvey Jones Channel Improvements Project

  • Because:

14

slide-15
SLIDE 15

Harvey Jones Channel Improvements Project

  • Remember:

– Mandatory bid attachments

  • Bid Security with Agent’s Affidavit
  • List of proposed subcontractors
  • Non-Debarment Certification
  • New Mexico Pay Equity Reporting Acknowledgment
  • Bidder’s List of Quoters for the Disadvantaged Business Enterprise Program
  • Race-Conscious Measure Project Contract Goal for DBE Program in Highway

Construction

  • SSCAFCA Campaign Contribution Disclosure Form
  • Non-Collusion affidavit
  • Federal Disclosure of Lobbying Activities, if required

– Make sure prime AND all subcontractors (not suppliers) are currently registered with the Department of Workforce Solutions – Make sure to acknowledge any Addenda on your Bid Form

15

slide-16
SLIDE 16

Harvey Jones Channel Improvements Project

  • Questions?