I-35 and I-240 Interchange Reconstruction Agenda I ntro duc tio - - PowerPoint PPT Presentation

i 35 and i 240 interchange reconstruction agenda
SMART_READER_LITE
LIVE PREVIEW

I-35 and I-240 Interchange Reconstruction Agenda I ntro duc tio - - PowerPoint PPT Presentation

The Oklahoma Department of Transportation I-35 and I-240 Interchange Reconstruction Agenda I ntro duc tio ns Pro je c t Ba c kg ro und De sig n Ove rvie w Vide o CORSI M Ana lysis Clo sing Re ma rks Introductions


slide-1
SLIDE 1

I-35 and I-240 Interchange Reconstruction

The Oklahoma Department of Transportation

slide-2
SLIDE 2

Agenda

  • I

ntro duc tio ns

  • Pro je c t Ba c kg ro und
  • De sig n Ove rvie w
  • Vide o
  • CORSI

M Ana lysis

  • Clo sing Re ma rks
slide-3
SLIDE 3

Introductions

Frank Roesler III, ODOT

  • Bria n T

a ylo r, ODOT Divisio n 4, We lc o me 8 Ye a r Wo rk Pla n

  • Da vid Stre b , Po e & Asso c ia te s, Ba c kg ro und
  • Je rry E

dg in, Po e & Asso c ia te s, De sig n Co nc e pt

  • He le ne Murdo c k, Po e & Asso c ia te s, CORSI

M

slide-4
SLIDE 4

Welcome

Brian Taylor, ODOT Division 4

slide-5
SLIDE 5

8 Year Construction Workplan

  • 2016

Rig ht o f Wa y

  • 2016

Co nstruc tio n

  • 2017

Utilitie s

  • 2018

Co nstruc tio n

  • 2020

Co nstruc tio n

  • 2021

Co nstruc tio n

Brian Taylor, ODOT Division 4 Engineer

slide-6
SLIDE 6

Project Background

  • L

a st Pub lic Me e ting

  • Ac c e ss Po ints
  • E

nviro nme nta l Asse ssme nt

David Streb, Poe & Associates

slide-7
SLIDE 7

Design Overview

Current Design Jerry Edgin, Poe & Associates

slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13

Design Overview

CORSIM Analysis Helene Murdock, Poe & Associates

slide-14
SLIDE 14

Closing Remarks

Brian Taylor, ODOT Division 4