HIST O RY O F PFA S IN T HE PL A INFIEL D T O WNSHIP WA T ER - - PowerPoint PPT Presentation

hist o ry o f pfa s in t he pl a infiel d t o wnship wa t
SMART_READER_LITE
LIVE PREVIEW

HIST O RY O F PFA S IN T HE PL A INFIEL D T O WNSHIP WA T ER - - PowerPoint PPT Presentation

HIST O RY O F PFA S IN T HE PL A INFIEL D T O WNSHIP WA T ER SYST EM UNRE GUL AT E D CONT AMI NANT MONI T ORI NG RUL E 3 (UCMR3) Sinc e 1996, a ll la rg e wa te r syste ms ha ve b e e n re q uire d to te st fo r a


slide-1
SLIDE 1

HIST O RY O F PFA S IN T HE PL A INFIEL D T O WNSHIP WA T ER SYST EM

slide-2
SLIDE 2

UNRE GUL AT E D CONT AMI NANT MONI T ORI NG RUL E 3 (UCMR3)

  • Sinc e 1996, a ll la rg e wa te r syste ms ha ve

b e e n re q uire d to te st fo r a list o f a b o ut 30 ne w c o nta mina nts e ve ry 5 ye a rs.

  • T

he c o nta mina nt list is pre pa re d b y the E PA a nd inc lude s b o th c he mic a ls a nd viruse s.

  • T

he E PA use s the da ta fro m this na tio nwide te sting to de ve lo p re g ula to ry de c isio ns.

  • T

he third ro und o f te sting b e g a n in 2013 a nd inc lude d six PF AS c he mic a ls.

slide-3
SLIDE 3

UCMR3 T E ST I NG T I ME L I NE

  • June 2013

F irst sa mple s o f o ur wa te r ta ke n fo r the 30 c o nta mina nts

  • Se pt 2013

Se c o nd sa mple se t ta ke n

  • De c 2013

T hird sa mple se t ta ke n

  • Ma rc h 2014

F ina l sa mple s ta ke n fo r the 30 c o nta mina nts

  • Aug ust 2014

Re sults o f o ur te sts a re ve rifie d a nd sub mitte d to the E PA

  • Ja nua ry 2017

E PA re le a se s fina l re sults o f na tio nwide UCMR3 te sting

slide-4
SLIDE 4

VE RSL UI S WE L L F I E L D OPE RAT I ON T I ME L I NE

  • Histo ric a lly Ve rsluis We ll F

ie ld wa s o nly use d during the pe a k summe r se a so n.

  • T

he Ve rsluis We ll F ie ld wa s in o pe ra tio n fo r the first 2 o f the 4 UCMR 3 sa mpling e ve nts in 2013/ 2014.

  • T

he Ve rsluis We ll F ie ld wa s o pe ra te d no rma lly during the summe rs o f 2014 a nd 2015 a nd wa s shut do wn o n Oc to b e r 1, 2015.

  • Ba se d o n ne w info rma tio n re g a rding PF

AS a ro und the sta te , we de c ide d in the winte r o f 2015/ 2016 tha t we wo uld te st the Ve rsluis We lls dire c tly.

  • I

n Ma rc h 2016 we te ste d the ra w wa te r a t Ve rsluis a nd fo und e le va te d le ve ls. At tha t time we ma de the de c isio n to ke e p the Ve rsluis We lls shut do wn fo r the summe r o f 2016.

slide-5
SLIDE 5

GOI NG F ORWARD

PF AS Mo nito ring

  • Sinc e shutting do wn the Ve rsluis We ll F

ie ld we ha ve b e e n sa mpling a nd te sting fo r the le ve ls o f PF AS in the wa te r tha t le a ve s o ur pla nt.

  • T

he le ve l o f PF OS+PF OA o ve r tha t pe rio d ra ng e d fro m 4.9 to 10.3 ppt with a n a ve ra g e o f 8.5 ppt.

  • Due to the me a sure me nt b e ing in pa rts pe r trillio n, the le ve ls o f

PF OS+PF OA we ha ve se e n o ve r time a re c o nside re d to b e sta b le .

slide-6
SLIDE 6

GOI NG F ORWARD

Ne w We ll F ie ld

  • I

n 2016 we b e g a n the pro c e ss to find a lo c a tio n fo r a ne w we ll fie ld to re pla c e the c a pa c ity we lo st whe n we c lo se d the Ve rsluis We ll F ie ld.

  • We b e g a n the disc ussio ns inte rna lly a nd q uic kly de te rmine d tha t we ne e de d

to hire a n o utside c o nsulta nt to a ssist us.

  • I

n 2017 we a ppro pria te d funds fo r o ur e ng ine e rs to inve stig a te suita b le g ro undwa te r so urc e s a nd he lp us lo c a te pro pe rty tha t c o uld b e use d.

  • Out o f tha t inve stig a tio n we na rro we d do wn to a n a re a tha t a ppe a re d

suita b le fo r a ne w we ll fie ld. Ho we ve r, sho rtly the re a fte r it wa s de te rmine d tha t the c o nta mina tio n plume fro m the Ho use Stre e t site e xte nde d to this a re a .

  • We ha ve sinc e fo und a se c o nd site tha t we a re in the pro c e ss o f do ing a n

hydra ulic a na lysis o n a nd ho pe to ha ve a ne w we llfie ld unde r de ve lo pme nt in the ne xt 12 mo nths.

slide-7
SLIDE 7

GOI NG F ORWARD

T re a tme nt fo r PF AS

  • Our pre vio us tre a tme nt pro c e ss wa s no t e ffe c tive fo r re mo ving PF

AS.

  • Alo ng with o ur e ng ine e rs, the wa te r pla nt o pe ra to rs b e g a n re se a rc hing

a lte rna tive me tho ds a va ila b le to tre a t fo r PF AS.

  • Disc ussio ns we re ha d with o the r tre a tme nt pla nts tha t ha ve PF

AS pre se nt o r a re c urre ntly utilizing tre a tme nt me tho ds tha t we a re c o nside ring .

  • F

a c to rs tha t we re c o nside re d whe n lo o king a t the a lte rna tive s inc lude d:

1.

T ra c k re c o rd o f the tre a tme nt me tho d

2.

E ffe c tive ne ss o f tre a tme nt me tho d fo r a wide ra ng e o f c o nta mina nts

3.

Ac c e pta b ility to the MDE Q fo r pe rmitting purpo se s

4.

Ong o ing c o st to ma inta in the tre a tme nt syste m

5.

I nitia l c o st to inc o rpo ra te the tre a tme nt syste m

slide-8
SLIDE 8

T ODAY

T re a tme nt fo r PF AS

  • T

ha nks to a $750,000 g ra nt fro m the sta te to pe rfo rm a pilo t study, we ha ve b e e n a b le to c o nve rt o ve r ha lf o f o ur maximum tre a tme nt c a pa c ity to g ra nula r a c tiva te d c a rb o n (GAC) filtra tio n.

  • As pa rt o f this pilo t study we ha ve b e e n a b le to do e xte nsive te sting o f o ur ra w

wa te r, o f the wa te r a t diffe re nt po ints in the tre a tme nt pro c e ss a nd o f the wa te r le a ving the pla nt fo r the distrib utio n syste m.

  • T

e st o utc o me s to da te inc lude :

1.

T he to ta l PF AS in the wa te r c o ming into o ur pla nt is ~ 45 ppt (9 ppt PF OA+PF OS).

2.

T he to ta l PF AS in the wa te r le a ving o ur pla nt is c urre ntly no n-de te c t fo r PF AS.

3.

T he a ntic ipa te d life o f the c a rb o n in o ur filte rs is 3+ ye a rs.

4.

Whe n it c o me s time to re pla c e the c a rbo n, the e xisting g e ts inc ine ra te d a t a ro und 1,800° F , whic h de stro ys the PF AS a nd re a c tiva te s the c a rb o n.

slide-9
SLIDE 9

QUE ST I ONS?