hist o ry o f pfa s in t he pl a infiel d t o wnship wa t
play

HIST O RY O F PFA S IN T HE PL A INFIEL D T O WNSHIP WA T ER - PowerPoint PPT Presentation

HIST O RY O F PFA S IN T HE PL A INFIEL D T O WNSHIP WA T ER SYST EM UNRE GUL AT E D CONT AMI NANT MONI T ORI NG RUL E 3 (UCMR3) Sinc e 1996, a ll la rg e wa te r syste ms ha ve b e e n re q uire d to te st fo r a


  1. HIST O RY O F PFA S IN T HE PL A INFIEL D T O WNSHIP WA T ER SYST EM

  2. UNRE GUL AT E D CONT AMI NANT MONI T ORI NG RUL E 3 (UCMR3) Sinc e 1996, a ll la rg e wa te r syste ms ha ve • b e e n re q uire d to te st fo r a list o f a b o ut 30 ne w c o nta mina nts e ve ry 5 ye a rs. T he c o nta mina nt list is pre pa re d b y the • E PA a nd inc lude s b o th c he mic a ls a nd viruse s. • T he E PA use s the da ta fro m this na tio nwide te sting to de ve lo p re g ula to ry de c isio ns. T he third ro und o f te sting b e g a n in 2013 • a nd inc lude d six PF AS c he mic a ls.

  3. UCMR3 T E ST I NG T I ME L I NE June 2013 F irst sa mple s o f o ur wa te r ta ke n fo r the 30 c o nta mina nts • Se pt 2013 Se c o nd sa mple se t ta ke n • • De c 2013 T hird sa mple se t ta ke n Ma rc h 2014 F ina l sa mple s ta ke n fo r the 30 c o nta mina nts • Aug ust 2014 Re sults o f o ur te sts a re ve rifie d a nd sub mitte d to the E PA • Ja nua ry 2017 E PA re le a se s fina l re sults o f na tio nwide UCMR3 te sting •

  4. VE RSL UI S WE L L F I E L D OPE RAT I ON T I ME L I NE • Histo ric a lly Ve rsluis We ll F ie ld wa s o nly use d during the pe a k summe r se a so n. T he Ve rsluis We ll F ie ld wa s in o pe ra tio n fo r the first 2 o f the 4 UCMR 3 • sa mpling e ve nts in 2013/ 2014. T he Ve rsluis We ll F ie ld wa s o pe ra te d no rma lly during the summe rs o f 2014 • a nd 2015 a nd wa s shut do wn o n Oc to b e r 1, 2015. Ba se d o n ne w info rma tio n re g a rding PF AS a ro und the sta te , we de c ide d in • the winte r o f 2015/ 2016 tha t we wo uld te st the Ve rsluis We lls dire c tly. I n Ma rc h 2016 we te ste d the ra w wa te r a t Ve rsluis a nd fo und e le va te d • le ve ls. At tha t time we ma de the de c isio n to ke e p the Ve rsluis We lls shut do wn fo r the summe r o f 2016.

  5. GOI NG F ORWARD PF AS Mo nito ring • Sinc e shutting do wn the Ve rsluis We ll F ie ld we ha ve b e e n sa mpling a nd te sting fo r the le ve ls o f PF AS in the wa te r tha t le a ve s o ur pla nt. T he le ve l o f PF OS+PF OA o ve r tha t pe rio d ra ng e d fro m 4.9 to 10.3 • ppt with a n a ve ra g e o f 8.5 ppt. Due to the me a sure me nt b e ing in pa rts pe r trillio n, the le ve ls o f • PF OS+PF OA we ha ve se e n o ve r time a re c o nside re d to b e sta b le .

  6. GOI NG F ORWARD Ne w We ll F ie ld • I n 2016 we b e g a n the pro c e ss to find a lo c a tio n fo r a ne w we ll fie ld to re pla c e the c a pa c ity we lo st whe n we c lo se d the Ve rsluis We ll F ie ld. We b e g a n the disc ussio ns inte rna lly a nd q uic kly de te rmine d tha t we ne e de d • to hire a n o utside c o nsulta nt to a ssist us. • I n 2017 we a ppro pria te d funds fo r o ur e ng ine e rs to inve stig a te suita b le g ro undwa te r so urc e s a nd he lp us lo c a te pro pe rty tha t c o uld b e use d. Out o f tha t inve stig a tio n we na rro we d do wn to a n a re a tha t a ppe a re d • suita b le fo r a ne w we ll fie ld. Ho we ve r, sho rtly the re a fte r it wa s de te rmine d tha t the c o nta mina tio n plume fro m the Ho use Stre e t site e xte nde d to this a re a . We ha ve sinc e fo und a se c o nd site tha t we a re in the pro c e ss o f do ing a n • hydra ulic a na lysis o n a nd ho pe to ha ve a ne w we llfie ld unde r de ve lo pme nt in the ne xt 12 mo nths.

  7. GOI NG F ORWARD T re a tme nt fo r PF AS Our pre vio us tre a tme nt pro c e ss wa s no t e ffe c tive fo r re mo ving PF AS. • Alo ng with o ur e ng ine e rs, the wa te r pla nt o pe ra to rs b e g a n re se a rc hing • a lte rna tive me tho ds a va ila b le to tre a t fo r PF AS. • Disc ussio ns we re ha d with o the r tre a tme nt pla nts tha t ha ve PF AS pre se nt o r a re c urre ntly utilizing tre a tme nt me tho ds tha t we a re c o nside ring . F a c to rs tha t we re c o nside re d whe n lo o king a t the a lte rna tive s inc lude d: • T ra c k re c o rd o f the tre a tme nt me tho d 1. E ffe c tive ne ss o f tre a tme nt me tho d fo r a wide ra ng e o f c o nta mina nts 2. Ac c e pta b ility to the MDE Q fo r pe rmitting purpo se s 3. Ong o ing c o st to ma inta in the tre a tme nt syste m 4. I nitia l c o st to inc o rpo ra te the tre a tme nt syste m 5.

  8. T ODAY T re a tme nt fo r PF AS T ha nks to a $750,000 g ra nt fro m the sta te to pe rfo rm a pilo t study, we ha ve • b e e n a b le to c o nve rt o ve r ha lf o f o ur maximum tre a tme nt c a pa c ity to g ra nula r a c tiva te d c a rb o n (GAC) filtra tio n. As pa rt o f this pilo t study we ha ve b e e n a b le to do e xte nsive te sting o f o ur ra w • wa te r, o f the wa te r a t diffe re nt po ints in the tre a tme nt pro c e ss a nd o f the wa te r le a ving the pla nt fo r the distrib utio n syste m. T e st o utc o me s to da te inc lude : • T he to ta l PF AS in the wa te r c o ming into o ur pla nt is ~ 45 ppt (9 ppt PF OA+PF OS). 1. T he to ta l PF AS in the wa te r le a ving o ur pla nt is c urre ntly no n-de te c t fo r PF AS. 2. T he a ntic ipa te d life o f the c a rb o n in o ur filte rs is 3+ ye a rs. 3. Whe n it c o me s time to re pla c e the c a rbo n, the e xisting g e ts inc ine ra te d a t 4. a ro und 1,800° F , whic h de stro ys the PF AS a nd re a c tiva te s the c a rb o n.

  9. ONS? I ST QUE

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend