ha nc oc k county f lood risk re duc tion prog ra m
play

Ha nc oc k County F lood Risk Re duc tion Prog ra m Hydr aulic - PowerPoint PPT Presentation

Ha nc oc k County F lood Risk Re duc tion Prog ra m Hydr aulic Impr ove me nts (Phase 1) Pr oje c t Public Pr e se ntation Januar y 24, 2018 INT RODUCT IONS Pro je c t Ove rvie w Ag e nda F lo o dpla in Be nc hing & So il


  1. Ha nc oc k County F lood Risk Re duc tion Prog ra m Hydr aulic Impr ove me nts (Phase 1) Pr oje c t Public Pr e se ntation Januar y 24, 2018

  2. INT RODUCT IONS

  3. Pro je c t Ove rvie w Ag e nda F lo o dpla in Be nc hing & So il Dispo sa l • I n-Rive r Struc ture Re mo va l • So il Sto c kpiling & Sta g ing • Utility Co o rdina tio n • Site Re sto ra tio n • Opinio n o f Pro b a b le Co st Antic ipa te d Be ne fits Pro je c t Sc he dule Pro je c t Sta tio ns

  4. Proje c t Hydra ulic Improve me nts (Pha se 1) Ove rvie w F lo o dpla in Be nc h Wide ning Re mo ve I nline Riffle s/ Da ms No rfo lk-So uthe rn RR Bridg e Mo dific a tio ns in Pha se 2

  5. T re e Cle a ring Proje c t Ove rvie w

  6. F loodpla in Be nc hing Proje c t Ove rvie w

  7. Proje c t loodpla in Be nc hing Cr oss Se c tions F Ove rvie w

  8. Post – Construc tion Re nde ring Proje c t Ove rvie w

  9. E xisting Inline Struc ture Re mova ls Proje c t Ove rvie w

  10. E xisting Inline Struc ture Re mova ls Pr Pr oje c t oje c t Ove r Ove r vie w vie w

  11. Construc te d Riffle s Proje c t Ove rvie w

  12. Propose d Riffle Struc ture s Proje c t Ove rvie w E xample Pr oje c t

  13. Propose d Riffle Struc ture s Proje c t Ove rvie w E xample Pr oje c t

  14. Soil Stoc kpiling & Sta g ing Proje c t Ove rvie w We tland Ar e a Avoidanc e Br andman Ar e a

  15. Utility Coordina tion Proje c t Ove rvie w AE P Ove r he ad E le c tr ic City Combine d Se we r s

  16. Site Re stora tion Proje c t Ove rvie w

  17. Site Re stora tion Proje c t Ove rvie w

  18. Bike Pa th Re a lig nme nt & Site Proje c t Re stora tion (inse rt g ra phic ) Ove rvie w

  19. Bike Pa th Re a lig nme nt & Site Proje c t Re stora tion (inse rt g ra phic ) Ove rvie w

  20. Bike Pa th Re a lig nme nt & Site Proje c t Re stora tion (inse rt g ra phic ) Ove rvie w

  21. Bike Pa th Re a lig nme nt & Site Proje c t Re stora tion (inse rt g ra phic ) Ove rvie w

  22. Proje c t Costs Opinion of Hydra ulic Improve me nts - Pha se I - Opinion of Proba ble Costs Proba ble De sc ription Amount Costs Construc tion Costs I n-Stre a m I mpro ve me nts: $1,401,000 F lo o dpla in Be nc h Wide ning I mpro ve me nts: $7,179,000 Utility a nd Bike Pa th I mpro ve me nts: $1,222,000 Hydra ulic Utility Co o rdina tio n: $750,000 I mpro ve me nts CONST RUCT ION SUBT OT AL $10,552,000 (Pha se 1) Only Co nting e nc y (15%) $1,583,000 CONST RUCT ION T OT AL $12,135,000 Othe r Costs T re e Re mo va l (I nc luding De b ris Re mo va l) $105,000 Stre a m We tla nd a nd T &E Mitig a tio n $75,000 Co nstruc tio n Administra tio n (5%) $607,000 OT HE R SUBT OT AL $787,000 T OT AL PROJE CT COST S $12,922,000

  23. Historic F lood E ve nts L oc a l F looding Se ve n E ve nts Sinc e 2000 July 2017 E ve nt ~4% (25-ye a r) ACE

  24. Antic ipa te d Rive r F low vs De pth a t Ma in Stre e t Be ne fits Ne w Bla nc ha rd Rive r Ra ting Curve a t Ma in Stre e t July 2017 E ve nt ~ 10,500 CF S

  25. Antic ipate d Wa te r Surfa c e E le va tion Be ne fits Ma jo r I nte rse c tio n I mpa c ts

  26. • I nc re a se d We tla nd F unc tio n Antic ipa te d Be ne fits • I mpro ve d Wa te r Qua lity • F ish Pa ssa g e & Aq ua tic Ha b itat • E nha nc e d Re c re a tio na l Oppo rtunitie s • Re duc e d T ra nspo rtatio n I mpa c ts lo o dplain Re duc tio n ~ L OMR T o Be F ile d • 1% ACE F F o llo wing Co nstruc tio n

  27. Inse rt F loodpla in Gra phic 1% ACE F loodpla in

  28. Inse rt F loodpla in Gra phic 1% ACE F loodpla in

  29. Pe rmitting Antic ipa te d • OE PA 401 WQC / USACE 404 Pe rmits Sc he dule Sub mitte d we e k o f De c . 18, 2017 ~ Co mple te ne ss – Re vie w Unde rwa y Pub lic Co mme nt & Ag e nc y Co o rdina tio n Pe rio ds – 401 Pub lic He a ring – Cr itic al Path o f Pr o je c t is • F lo o dpla in Pe rmit (City) thr o ugh Pe r mitting • OE PA Pe rmit to I nstall (Se we r Re pla c e me nts) • OE PA Rule 27-13 Applic a tio n (Bra ndma n Site ) ** T ar ge ting pe r mits to be issue d Summe r 2018 **

  30. De sig n & Construc tion Antic ipa te d Sc he dule • T re e Cle a ring Pro je c t Bid Awa rd: Ja n. 16 th / NT e b . 1 st P: F – S.C.: Ma r. 31 st / F .C.: Ma y 15 th – • F ina l De sig n Cr itic al Path 60% De sig n sub mitte d De c . 8, 2017 – o f Pr o je c t is 95% De sig n due Ma y 1 st – thr o ugh F ina l I F B Pa c ka g e (e stima te July 2018) – Pe r mitting • Co nstruc tio n (**) Bidding & Awa rd: Aug . 2018 / NT P: Se p. 2018 – (**) S.C.: Aug . 2019 / F .C.: Oc t. 2019 – ** T ar ge ting pe r mits to be issue d Summe r 2018 **

  31. Que stions & Pro je c t Sta tio ns in Ha llwa y Comme nts www.Ha nc o c kCo untyF lo o ding .c o m Ste ve Wilso n - sc wilso n@ c o .ha nc o c k.o h.us Pro je c t Ma na g e r Ma ume e Wa te rshe d Co nse rva nc y Distric t 514 So uth Ma in Stre e t F indla y, OH 45840 Pho ne : 419-424-5050

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.