San F r anc isquito Cr e e k F lood Pr ote c tion E c osyste - - PowerPoint PPT Presentation

san f r anc isquito cr e e k
SMART_READER_LITE
LIVE PREVIEW

San F r anc isquito Cr e e k F lood Pr ote c tion E c osyste - - PowerPoint PPT Presentation

San F r anc isquito Cr e e k F lood Pr ote c tion E c osyste m Re stor ation Re c r e ation San F r anc isc o Bay to Highway 101 San Francisquito Creek Joint Powers Authority San Francisquito Creek Watershed Santa Clara


slide-1
SLIDE 1

San F r anc isquito Cr e e k

F lood Pr

  • te c tion • E

c osyste m Re stor ation • Re c r e ation San F r anc isc o Bay to Highway 101

slide-2
SLIDE 2

San Francisquito Creek Joint Powers Authority Palo Alto East Palo Alto Menlo Park

50 square miles; two counties; six towns; local, state and national parks sites; major rail & highways, regional airport and USPS facility, and major research university

Watershed

Floodplain

Santa Clara Valley Water District San Mateo County Flood Control District

San Francisquito Creek

Project areas

slide-3
SLIDE 3

East Palo Alto Palo Alto Menlo Park

Northern Boundary: Redwood City

X X

Southern Boundary: Mountain View

X

Sa n F ra nc isq uito Cre e k a re a

floodplains and pr

  • je c ts

Creek floodplain: 3,500 parcels Bay floodplain with 3 ft. sea level rise: 2,700+ parcels Overlap of creek and Bay floodplains: 2,200 parcels

slide-4
SLIDE 4

Floodwalls New levee set back into golf course Degrade Bay levee

Protect previously flooded people and property from SF Bay to Hwy. 101 against the maximum possible creek flow during a high tide with over 3 feet of Sea Level Rise

Enhance marsh levee Enhance public experience Excavate sediment and create marsh transition zones

S.F . Ba y to Hig hwa y 101 Pro je c t

slide-5
SLIDE 5

Until August 31, 2016

  • Sept. 1 – Oct. 15

No restrictions!

June and July: PG&E tower construction 50 foot exception at edge of zone

  • Oct. 15 – Jan. 31

No work in creek

  • Feb. 1 – June 15, 2017

June 15 – Aug. 31, 2017

No construction zone

slide-6
SLIDE 6

Sa nta Cla ra Va lle y Wa te r Distric t $28 millio n SF CJPA $8.83 millio n E a st Pa lo Alto $1.26 millio n Sa n Ma te o Co unty $2.06 millio n Me nlo Pa rk $0.8 millio n Pa lo Alto $0.4 millio n Ca ltra ns (Hwy 101 b ridg e re pla c e me nt) $18 millio n

S.F . Ba y to Hig hwa y 101 Pro je c t

T

  • tal e stimate d c ost: $41.35 million

Shar ing the c o st a nd the b e ne fits

slide-7
SLIDE 7

De sig n a nd c onstr

uc tion

slide-8
SLIDE 8

Caltr ans Hig hwa y 101 Bridg e Pro je c t

2015-2017

slide-9
SLIDE 9

Palo Alto Go lf Co urse

Re c o nfig ura tio n Pro je c t

slide-10
SLIDE 10

During

c onstr uc tion

slide-11
SLIDE 11
  • Ma inta in a nd tune

e q uipme nt to mfg ’ s spe c s

  • Minimize no ise impa c ts

fro m e q uipme nt

  • Re duc e idling time o f

die se l e q uipme nt

  • I

nte rna l c o mb ustio n e ng ine s will ha ve a de q ua te muffle rs a nd b e st e missio n re duc tio n te c hno lo g y

Re duc e e q uipme nt impa c ts

slide-12
SLIDE 12

Pr

  • te c t the c r

e e k fro m spills

slide-13
SLIDE 13

Pro te c t a nd e nhanc e our

r e sour c e s

slide-14
SLIDE 14

1 5

3 ways to ge t pr

  • je c t

update s

Pro je c t we b site :

sfc jpa.or g

Atte nd a mo nthly

SF CJPA boar d me e ting

Sig n up to re c e ive pro je c t update s via

e mail using the link o n

the pro je c t we b site o r the QR c o de .

slide-15
SLIDE 15

F

  • r mo re info rma tio n:

K riste n Ya suka wa (650) 382-3331 kya suka wa @ va lle ywa te r.o rg

T hank you