ENGLEWOOD AND DARDENNE PARK CHANNEL IMPROVEMENTS (PROJECT #P-7) - - PowerPoint PPT Presentation

englewood and dardenne park channel improvements project
SMART_READER_LITE
LIVE PREVIEW

ENGLEWOOD AND DARDENNE PARK CHANNEL IMPROVEMENTS (PROJECT #P-7) - - PowerPoint PPT Presentation

ENGLEWOOD AND DARDENNE PARK CHANNEL IMPROVEMENTS (PROJECT #P-7) PUBLIC MEETING - September 11, 2013 PROJECT LOCATION PROJECT AREA PROJECT OVERVIEW PROJECT PURPOSE Improve Water Quality Stabilize the Existing Channel Reduce


slide-1
SLIDE 1

PUBLIC MEETING - September 11, 2013

ENGLEWOOD AND DARDENNE PARK CHANNEL IMPROVEMENTS (PROJECT #P-7)

slide-2
SLIDE 2

PROJECT LOCATION

slide-3
SLIDE 3

PROJECT AREA

slide-4
SLIDE 4

PROJECT OVERVIEW

slide-5
SLIDE 5

PROJECT PURPOSE

 Improve Water Quality  Stabilize the Existing Channel  Reduce Stream Erosion  Riparian Corridor Renovation  Sustainable Solutions

slide-6
SLIDE 6

SITE PHOTOS

slide-7
SLIDE 7

SITE PHOTOS

slide-8
SLIDE 8

SITE PHOTOS

slide-9
SLIDE 9

SITE PHOTOS

slide-10
SLIDE 10

UPSTREAM REACH – BRADBURY CRT. TO HEATHERFORD CRT.

slide-11
SLIDE 11

DOWNSTREAM REACH – HEATHERFORD CRT. TO DEW CRT.

slide-12
SLIDE 12

Example Stream Revetments

 Armoring vs. Stream Training Revetments

slide-13
SLIDE 13

Example Stream Revetments

 Rock Vane with Graded Rock  Note interlocking and smooth well blended surfaces

slide-14
SLIDE 14

Example Stream Revetments

 Note Roughened Surface  Top is elevation is grade specific

slide-15
SLIDE 15

Example Restored Energy Dissipation Downstream of Encasement

slide-16
SLIDE 16

Example Vortex Weir used for flow deflection and stream training

slide-17
SLIDE 17

Example Live Planting

slide-18
SLIDE 18

Example Zone 2 Planting

slide-19
SLIDE 19

Example Plantings

Marsh Marigold Common Rush Torrey’s Rush

slide-20
SLIDE 20

Example Plantings

Frank’s Sedge Gray’s Sedge Blunt Spike Rush

slide-21
SLIDE 21

Completed Projects – Pre Construction

slide-22
SLIDE 22

Completed Projects – During Construction

slide-23
SLIDE 23

Completed Projects – Acceptance

slide-24
SLIDE 24

Completed Projects – Post Construction

slide-25
SLIDE 25

Completed Projects

slide-26
SLIDE 26

Completed Projects

slide-27
SLIDE 27

Completed Projects

slide-28
SLIDE 28

Completed Projects

slide-29
SLIDE 29

Completed Projects

slide-30
SLIDE 30

QUESTIONS?

 Thank you for attending the Public Meeting.  Please do not hesitate to ask questions or voice

comments/concerns.

Jim Dunajcik, P.E. jdunajcik@gbateam.com 636.240.2444 (o) 314.691.1520 (m)