ENGLEWOOD AND DARDENNE PARK CHANNEL IMPROVEMENTS (PROJECT #P-7) - - PowerPoint PPT Presentation
ENGLEWOOD AND DARDENNE PARK CHANNEL IMPROVEMENTS (PROJECT #P-7) - - PowerPoint PPT Presentation
ENGLEWOOD AND DARDENNE PARK CHANNEL IMPROVEMENTS (PROJECT #P-7) PUBLIC MEETING - September 11, 2013 PROJECT LOCATION PROJECT AREA PROJECT OVERVIEW PROJECT PURPOSE Improve Water Quality Stabilize the Existing Channel Reduce
SLIDE 2
SLIDE 3
PROJECT AREA
SLIDE 4
PROJECT OVERVIEW
SLIDE 5
PROJECT PURPOSE
Improve Water Quality Stabilize the Existing Channel Reduce Stream Erosion Riparian Corridor Renovation Sustainable Solutions
SLIDE 6
SITE PHOTOS
SLIDE 7
SITE PHOTOS
SLIDE 8
SITE PHOTOS
SLIDE 9
SITE PHOTOS
SLIDE 10
UPSTREAM REACH – BRADBURY CRT. TO HEATHERFORD CRT.
SLIDE 11
DOWNSTREAM REACH – HEATHERFORD CRT. TO DEW CRT.
SLIDE 12
Example Stream Revetments
Armoring vs. Stream Training Revetments
SLIDE 13
Example Stream Revetments
Rock Vane with Graded Rock Note interlocking and smooth well blended surfaces
SLIDE 14
Example Stream Revetments
Note Roughened Surface Top is elevation is grade specific
SLIDE 15
Example Restored Energy Dissipation Downstream of Encasement
SLIDE 16
Example Vortex Weir used for flow deflection and stream training
SLIDE 17
Example Live Planting
SLIDE 18
Example Zone 2 Planting
SLIDE 19
Example Plantings
Marsh Marigold Common Rush Torrey’s Rush
SLIDE 20
Example Plantings
Frank’s Sedge Gray’s Sedge Blunt Spike Rush
SLIDE 21
Completed Projects – Pre Construction
SLIDE 22
Completed Projects – During Construction
SLIDE 23
Completed Projects – Acceptance
SLIDE 24
Completed Projects – Post Construction
SLIDE 25
Completed Projects
SLIDE 26
Completed Projects
SLIDE 27
Completed Projects
SLIDE 28
Completed Projects
SLIDE 29
Completed Projects
SLIDE 30
QUESTIONS?
Thank you for attending the Public Meeting. Please do not hesitate to ask questions or voice
comments/concerns.
Jim Dunajcik, P.E. jdunajcik@gbateam.com 636.240.2444 (o) 314.691.1520 (m)