EMC BWE
PANDA Services and Mounting
27-Apr-15 HIM - EMC BW Endcap 1
EMC BWE PANDA Services and Mounting 27-Apr-15 HIM - EMC BW Endcap - - PowerPoint PPT Presentation
EMC BWE PANDA Services and Mounting 27-Apr-15 HIM - EMC BW Endcap 1 Boundaries 27-Apr-15 HIM - EMC BW Endcap 2 EMC BWE Surroundings Reminder from June 2014 438 165 Technical Board (in mm) 405 27-Apr-15 HIM - EMC BW Endcap 3 EMC
27-Apr-15 HIM - EMC BW Endcap 1
27-Apr-15 HIM - EMC BW Endcap 2
HIM - EMC BW Endcap 3
405 438 165
Reminder from June 2014 Technical Board (in mm)
27-Apr-15
HIM - EMC BW Endcap 4
STT Services EMC BWE Barrel DIRC MVD
RIBWE=165 RIDIRC=448 LOBWE=405 LISTT=410 ROBWE=438 ROMVD =155
5 10 10
27-Apr-15
HIM - EMC BW Endcap 5 27-Apr-15
STT Services EMC BWE Barrel DIRC MVD
RIBWE=165 RIDIRC=448 LOBWE=405 LISTT=410 ROBWE=438 ROMVD =155
5 10 10
5 160
27-Apr-15 HIM - EMC BW Endcap 6
HIM - EMC BW Endcap 7 27-Apr-15
EMC BWE Services Options
EMC BWE Services ADCs Inside the magnet ADCs Outside the magnet Moving with the trolley Below it Next to it In the rack
HIM - EMC BW Endcap 8 27-Apr-15
(Option)
Patch Panel
HIM - EMC BW Endcap 9 27-Apr-15
Patch Panel Position Services moving with the trolley:
Below it Next to it Left or Right Also ADCs rack
HIM - EMC BW Endcap 10 27-Apr-15
Patch Panel Position Services moving with the trolley:
Next to it Below it STT services interference?? Advantage: No gap needed in the Aux/Mounting Platforms
HIM - EMC BW Endcap 11 27-Apr-15
Patch Panel
Services go to Patch Panel which moves with the BWE trolley. Optic Fibers go directly to the rack
HIM - EMC BW Endcap 12 27-Apr-15
from Patch Panel to Rack
BWE services patch depending on the Patch Panel position
HIM - EMC BW Endcap 13 27-Apr-15
Patch Panel Position Services moving next to the trolley:
Advantage: No gap needed in the Aux/Mounting Platforms
HIM - EMC BW Endcap 14 27-Apr-15
Patch Panel Position Services moving nest to the with the trolley:
STT services interference??
HIM - EMC BW Endcap 15 27-Apr-15
from Patch Panel to Rack
Hole for MVD services through BWE: 1340 cm2
27-Apr-15 HIM - EMC BW Endcap 16
HIM - EMC BW Endcap 17 27-Apr-15
From the last December 2014 MEC meeting
Mounting Platform
HIM - EMC BW Endcap 18 27-Apr-15
Mounting Platform
Agreed in the March Meeting to have a 10 Meter platform in order to mount MVD/STT and BWE at the same time 10m
HIM - EMC BW Endcap 19 27-Apr-15
Mounting Platform
It is extended over the cooling pit
HIM - EMC BW Endcap 20 27-Apr-15
Mounting Platform
3m 4.5m 10m STT from Mounting Platform to the inside?
HIM - EMC BW Endcap 21 27-Apr-15
Mounting Platform
BWE rails divided in 3 sections: · 1.0-1.5 meters in the Auxiliary platform (final position) · 1.0-1.5 meters in the Mounting position · 8-9 meters connecting these two sections
27-Apr-15 HIM - EMC BW Endcap 22