EMC BWE PANDA Services and Mounting 27-Apr-15 HIM - EMC BW Endcap - - PowerPoint PPT Presentation

EMC BWE PANDA Services and Mounting 27-Apr-15 HIM - EMC BW Endcap 1 Boundaries 27-Apr-15 HIM - EMC BW Endcap 2 EMC BWE Surroundings Reminder from June 2014 438 165 Technical Board (in mm) 405 27-Apr-15 HIM - EMC BW Endcap 3 EMC


slide-1
SLIDE 1

EMC BWE

PANDA Services and Mounting

27-Apr-15 HIM - EMC BW Endcap 1

slide-2
SLIDE 2

Boundaries

27-Apr-15 HIM - EMC BW Endcap 2

slide-3
SLIDE 3

HIM - EMC BW Endcap 3

405 438 165

Reminder from June 2014 Technical Board (in mm)

EMC BWE Surroundings

27-Apr-15

slide-4
SLIDE 4

HIM - EMC BW Endcap 4

EMC BWE Surroundings

STT Services EMC BWE Barrel DIRC MVD

RIBWE=165 RIDIRC=448 LOBWE=405 LISTT=410 ROBWE=438 ROMVD =155

5 10 10

27-Apr-15

slide-5
SLIDE 5

HIM - EMC BW Endcap 5 27-Apr-15

EMC BWE Surroundings

STT Services EMC BWE Barrel DIRC MVD

RIBWE=165 RIDIRC=448 LOBWE=405 LISTT=410 ROBWE=438 ROMVD =155

5 10 10

5 160

slide-6
SLIDE 6

Services

27-Apr-15 HIM - EMC BW Endcap 6

slide-7
SLIDE 7

HIM - EMC BW Endcap 7 27-Apr-15

EMC BWE Services Options

EMC BWE Services ADCs Inside the magnet ADCs Outside the magnet Moving with the trolley Below it Next to it In the rack

slide-8
SLIDE 8

HIM - EMC BW Endcap 8 27-Apr-15

(Option)

Patch Panel

slide-9
SLIDE 9

HIM - EMC BW Endcap 9 27-Apr-15

Patch Panel Position Services moving with the trolley:

Below it Next to it Left or Right Also ADCs rack

slide-10
SLIDE 10

HIM - EMC BW Endcap 10 27-Apr-15

Patch Panel Position Services moving with the trolley:

Next to it Below it STT services interference?? Advantage: No gap needed in the Aux/Mounting Platforms

slide-11
SLIDE 11

HIM - EMC BW Endcap 11 27-Apr-15

Patch Panel

Services go to Patch Panel which moves with the BWE trolley. Optic Fibers go directly to the rack

slide-12
SLIDE 12

HIM - EMC BW Endcap 12 27-Apr-15

from Patch Panel to Rack

BWE services patch depending on the Patch Panel position

slide-13
SLIDE 13

HIM - EMC BW Endcap 13 27-Apr-15

Patch Panel Position Services moving next to the trolley:

Advantage: No gap needed in the Aux/Mounting Platforms

slide-14
SLIDE 14

HIM - EMC BW Endcap 14 27-Apr-15

Patch Panel Position Services moving nest to the with the trolley:

STT services interference??

slide-15
SLIDE 15

HIM - EMC BW Endcap 15 27-Apr-15

from Patch Panel to Rack

Hole for MVD services through BWE: 1340 cm2

slide-16
SLIDE 16

Mounting Platform

27-Apr-15 HIM - EMC BW Endcap 16

slide-17
SLIDE 17

HIM - EMC BW Endcap 17 27-Apr-15

From the last December 2014 MEC meeting

Mounting Platform

slide-18
SLIDE 18

HIM - EMC BW Endcap 18 27-Apr-15

Mounting Platform

Agreed in the March Meeting to have a 10 Meter platform in order to mount MVD/STT and BWE at the same time 10m

slide-19
SLIDE 19

HIM - EMC BW Endcap 19 27-Apr-15

Mounting Platform

It is extended over the cooling pit

slide-20
SLIDE 20

HIM - EMC BW Endcap 20 27-Apr-15

Mounting Platform

3m 4.5m 10m STT from Mounting Platform to the inside?

slide-21
SLIDE 21

HIM - EMC BW Endcap 21 27-Apr-15

Mounting Platform

BWE rails divided in 3 sections: · 1.0-1.5 meters in the Auxiliary platform (final position) · 1.0-1.5 meters in the Mounting position · 8-9 meters connecting these two sections

slide-22
SLIDE 22

Thank you