Der erek ek A. . Was assink, , P.E. .E., R R.A .A., S.I - - PowerPoint PPT Presentation

der erek ek a was assink p e e r r a a s i s i l leed eed
SMART_READER_LITE
LIVE PREVIEW

Der erek ek A. . Was assink, , P.E. .E., R R.A .A., S.I - - PowerPoint PPT Presentation

Der erek ek A. . Was assink, , P.E. .E., R R.A .A., S.I S.I., ., L LEED EED A AP Vice President September 2018 Solicitation PNC2115981P1 Broward C County B y Board o of County C y Commis issio ioners Thornton Tomasetti


slide-1
SLIDE 1

Der erek ek A. . Was assink, , P.E. .E., R R.A .A., S.I S.I., ., L LEED EED A AP

Vice President September 2018 Solicitation PNC2115981P1 Broward C County B y Board o

  • f County C

y Commis issio ioners

slide-2
SLIDE 2

Thornton Tomasetti Background

slide-3
SLIDE 3

Boston, Massachusetts Chicago, Illinois Washington, D.C. San Diego, California San Francisco, California Portland, Maine Philadelphia, Pennsylvania Newark, New Jersey New York, Madison Ave / Wallstreet Los Angeles, California Downtown/ LAX Tampa, Florida Miami, Florida

  • Ft. Lauderdale, Florida

Denver, Colorado Dallas, Texas Beijing, China Christchurch, New Zealand Ho Chi Minh City, Vietnam Mumbai, India Moscow, Russia Hong Kong, China Shanghai, China UAE London, UK (Head Office) São Paulo, Brazil

60

1300 Engineers,

Architects and Professionals

41 Offices

6 Continents

Projects in

Our Locations

Countries

London, UK (PLC City Office) Seattle, Washington Albuquerque, New Mexico Austin, Texas Cupertino, California West Hartford, Connecticut Bristol, UK

Reach

Glasgow, UK Edinburgh, UK Irvine, California Toronto, CA

slide-4
SLIDE 4

Florida Operations

  • 50 Year Old Company
  • 18 Years in Florida
  • Broward C

Cou

  • unty O

Offi fice S Since ce 2000 2000

  • 50 Employees in Florida-Based Offices
  • Backed by 1,300 Employees Worldwide

Fort L Lau aude derdal ale, T Tam ampa & & Miam iami Offices

50 People Practices

Structural Engineering Construction Engineering Renewal Forensics Property Loss Consulting Façade Engineering Protective Design Markets Aviation Sports Higher Education Healthcare Commercial Tall Buildings

Miami International Airport, North Terminal Peer Review, Miami, FL

slide-5
SLIDE 5

Team Organization

slide-6
SLIDE 6

Derek Wassink, P.E., R.A., S.I., LEED AP Pr Prin incipal-in in-Cha harge/ P Project M Manager Thomas Poulos, P.E., S.E., SECB, MLSE Qu Quality A Assurance / / Qu Quality C Control Craven T Thompson & & Associat iates (Civil Engineer Subconsultant)

Project Team

Gurri ri Matute te (Architecture Subconsultant and CBE Team Member)

slide-7
SLIDE 7

Select Experience

slide-8
SLIDE 8

Aviation Experience

  • Award-Winning Firm Specializing in Unique and

Complex Structures

  • Our experience in executing complex structural

systems for long-span aviation facilities includes:

  • Air-supported, tensile structures
  • Space frames
  • Space trusses
  • Stressed-skin systems
  • Long-span trusses
  • Long-span joist systems
  • Arches
  • Laminated long-span wood systems
  • Cable-suspended systems
  • Hybrids
slide-9
SLIDE 9

51

Airports

>40

Years in Aviation

Rank nk Company ny 20 2016 A 6 Airpor

  • rt

Rev evenue 1 AECOM $208,200,000 2 Burns & McDonnell $67,493,841

3 4 5 6

7 Thornton Tomasetti $10,382,597

8

9 WP Moore $6,707,551

10 11

12 Magnussen Klemensic $4,763,377

Source: Top 30 airport engineering firms, Building Design+Construction, October 3, 2017 table reduced to show relevant competitors

Top 30 airport engineering firms

Aviation Experience

slide-10
SLIDE 10

BIM Expertise

  • Integrate 3D modeling into our design and analysis work, a technique that

streamlines work flow.

  • BIM Benefits:
  • Improved efficiency
  • Better design team coordination
  • Enhanced client communications
  • Interoperability with analysis models
  • Greater design flexibility
  • These benefits translate into higher design quality, decreased design cycle time,

and fewer coordination problems in the field.

slide-11
SLIDE 11

Local Aviation Experience

  • 25+ years of experience
  • Florida Aviation Portfolio:
  • Wayman Aviation Academy,

North P Perry Air Airport Pembroke Pines, FL

  • Jetscape Westside Development

FLL Fort Lauderdale, FL

  • FLL Terminal 1 Concourse B + C

Derek A. Wassink, P.E., R.A., S.I., LEED AP

slide-12
SLIDE 12

Select Airport Study Experience

  • Miam

ami I Internat ational al A Airpor

  • rt, M

Miami W World ld Gateway, N North T Terminal D al Develo lopment, M Miami, F FL: Peer review of a new terminal structure and automated people mover system. The project consists of reinforced concrete and structural steel framing of over two million square feet of terminal space.

  • O’Har

are I Internat ation

  • nal A

al Airpor

  • rt, T

Terminal 2 al 2 E / F Up Upgrad ades, C Chicago,

  • , I

IL: Feasibility studies and concept design for an existing 31-gate terminal. The project scope included the development of several schemes with the architect to upgrade and modernize the building to improve the passenger

  • experience. The project included evaluation of the existing 50-year-old building structure to conform to

modern building codes.

  • O’Har

are I Internat ation

  • nal A

al Airpor

  • rt, ConRAC

AC and A ATS E Extension

  • n, Chicag

ago, IL: Structural engineering peer review services and BIM support for the joint-use ConRAC / parking facility and automated transit system (ATS) extension. The project will consolidate all of the airport’s rental car companies and will provide additional public parking spaces.

  • Detroit M

Metrop

  • poli
  • litan

an W Wayne C County A Airpor

  • rt, F

Feas asibili lity S Study, D Detroi

  • it, M

MI: Study and analysis to determine the feasibility of converting the Smith Terminal into an administration facility for the airport.

  • Los
  • s A

Angeles Wor

  • rld A

Air irports, On On-Call all Engineering S Services, T Task 015, L Los A Angele les, C CA: Structural investigation and design of Continental Airport Phase 1.

  • Incheon I

Internat ational A al Airpor

  • rt, P

Phase I III, Incheon, KOR: Structural peer review services through 90% CD for Terminal 2 at Incheon International Airport. Structural challenges included achieving structural safety, efficiency, constructability and cost savings, while providing an exceeding structure. Thornton Tomasetti also provided façade peer review services for the cable net wall.

slide-13
SLIDE 13

Fort Lauderdale le/Holly lywoo

  • od I

Internat ation

  • nal A

al Airpor

  • rt (FLL)
  • Eastside D

Dredge & & Fill E l Engineeri ring S Study, P , Phase 1 1A & & 1B (Engineering)

  • Port E

Eve vergla lades C Crane E Eva valu luation A Area f for FAA R Report (Surveying)

  • St

Stormwat ater D Drainage M Mas aster Pl Plan an (Surveying Services)

  • Wast

stewater S Syst stem A Analysi sis s - Wastewat ater S Study dy (Engineering Study)

  • Air

irport Pl Plan anning Co Consultan ant Se Services

  • Norths

hside J Jet C Center - Renovat atio ion a and Expansio ion o

  • f Existin

ing F Facil ilit ity (Surveying, Planning, Engineering, Landscape Architecture, Construction Observation)

  • Westside J

Jet C Center - Develop lopment o

  • f a 47-Acr

Acre F Facility (Planning, Engineering, Surveying)

  • Bombar

ardie dier - Learje jet C Corporat ate H Hangar ar - Expan ansion o

  • f Exis

isting F Fac acility (Engineering)

  • Huizenga A

a Aviat iatio ion H Hangar ar - 12 12-acre A Aircra raft H Hangar / / Office C Comple lex (Engineering)

  • Runway 9

9L/27R O Ove verla rlay (Surveying)

  • Air

irport E Expan ansion Pr Program ( (Co Co-Man anag aged) d) Projects included:

  • New 4,900-space garage
  • Renovation of existing three terminals
  • New Terminal 1, Concourse C - additional 9 gates
  • Terminal 1, Concourse B - 9 gates
  • New entrance roadway system
  • Consolidated of vehicle parking and rental car facilities

North th P Perry A Airport t (HWD)

  • Peri

rimeter R Roa

  • ad (Engineering)
  • Taxi

xiways a s and Runways E s Expa xpansi sions a s and O Overlays s (Surveying)

  • Roadw

adway B Beau autification Pr Proje ject (Landscape Architecture)

.

CRAVEN T EN THOMPSON N & ASSOC OCIATES’ R REL ELEV EVANT NT EX EXPER ERIENC NCE

slide-14
SLIDE 14

Services es:

Design Planning Studies, Building Assessment Reports, Preliminary Cost Estimates, Phasing Diagrams, Life Safety Consulting, ADA Surveys, Zoning Studies, Feasibility Studies, Design Criteria Packages, Programming, Test Fits Design, Construction Documents, Construction Administration & Close-out Owner Representation, Peer Review

  • Established over 22 yrs
  • Offices: Miami – Deerfield Beach
  • CBE/SBE/DBE/8(a)
  • 21 yrs. Aviation Firm Experience
  • FLL & MIA
  • De

Design Professional o

  • f Record -

Li Life Safety Design for

  • r the entire

T-4 E Expa pansion P Project ( (Sub ub to PG PGAL AL/Zyscov

  • vich)
slide-15
SLIDE 15

Thank Thank Y You

  • u