CRYSTAL CITY - DCA CONNECTION STUDY Public Info Meeting September 2017 Prepared by VHB INTRODUCTION PRESENTATION DIALOGUE 2 Robert M andle + Angie Fox Crystal City BID 3


slide-1
SLIDE 1

CRYSTAL CITY - DCA CONNECTION STUDY

Public Info Meeting September 2017

Prepared by VHB

slide-2
SLIDE 2

INTRODUCTION PRESENTATION DIALOGUE

2

slide-3
SLIDE 3

Robert M andle + Angie Fox

Crystal City BID 3

slide-4
SLIDE 4

MISSION

Vision: To directly link Crystal City with DCA and the National Airport Metro station via a context-sensitive pedestrian connection that enhances economic development opportunities, strengthens the neighborhood’s hotel community,

  • Crystal City to a growing regional rail network.

4

slide-5
SLIDE 5

Doug Davies

VHB 5

slide-6
SLIDE 6

PROCESS DISCOVER

IDENTIFY CONSTRAINTS AND OPPORTUNITIES

SYNTHESIZE

COME TO A COMMON UNDERSTANDING ABOUT WHAT COULD BE

PLAN

DEVELOP A VISION AND ROADMAP FOR THE PROJECT

6

slide-7
SLIDE 7

WHAT DO WE KNOW SO FAR?

7

slide-8
SLIDE 8

CURRENT AND UPCOMING PROJECTS

  • DCA Security and Terminal Improvements
  • Long Bridge Project
  • VRE Station Improvement Project
  • Crystal City 2nd Metrorail Entrance Project/ JBG Smith

Development

  • Southeast High Speed Rail Project

8

slide-9
SLIDE 9

EXISTING CONDITIONS

Airport Access Road

  • 6,500’ (1.2mi) to Crystal City
  • Discontinuous Concrete Sidewalk
  • Narrow Sections
  • Unsignalized Crossings
  • Not ADA Compliant
  • Mt. Vernon Trail Spur
  • 7,200’ (1.4 mi) to Crystal City
  • Heavily Used by Cyclists
  • Blocked Pathways
  • Three Narrow Underpass Sections
  • Dark Airport Underpass Section
  • Circuitous Path
  • Not ADA Compliant
  • Unsignalized Crossings

9

slide-10
SLIDE 10

10

slide-11
SLIDE 11

11

slide-12
SLIDE 12

12

slide-13
SLIDE 13

13

slide-14
SLIDE 14

HOW FAR INTO CRYSTAL CITY CAN YOU GET IN 15 MINUTES?

via walking 14

slide-15
SLIDE 15

HOW FAR INTO CRYSTAL CITY CAN YOU GET IN 15 MINUTES?

via Metro + Walking 15

slide-16
SLIDE 16

WHAT DO WE HOPE TO ACCOMPLISH?

16

slide-17
SLIDE 17

OBJECTIVES FOR CONNECTION

  • 1. Generate Economic Development
  • 2. Create a Direct and Enjoyable Experience
  • 3. Develop a Practical and Implementable Solution
  • 4. Provide Multi-modal Access and Connectivity to Region
  • 5. Celebrate and Preserve Recreational, Cultural, and Historic Resources
  • 6. Align or Integrate with Existing and Planned Infrastructure Projects

17

slide-18
SLIDE 18

POTENTIAL CONNECTIONS

Crystal City

  • Between the two existing walking/trail connections
  • Integrated into existing developments
  • Open spaces with access to Crystal Drive
  • Integrated with VRE potential entrance options

DCA

  • Closest points to Crystal City
  • Closest to proposed security gates
  • Proximity to Metro

18

slide-19
SLIDE 19

HOW FAR INTO CRYSTAL CITY COULD YOU GET IN 15 MINUTES?

via a potential new connection

*walkshed shown is at shortest connection point, for context.

19

slide-20
SLIDE 20

WHAT IS THIS DISTANCE?

20

slide-21
SLIDE 21

21

slide-22
SLIDE 22

Thank you!