crisis opportunity and the submarine cable industry
play

Crisis, Opportunity and the Submarine Cable Industry Apricot 07 28 - PowerPoint PPT Presentation

Crisis, Opportunity and the Submarine Cable Industry Apricot 07 28 February 2007 Wilfred Kwan CTO, Asia Netcom Empowering Communications in the Asian Century Agenda The Recent Crisis How We Survive The Current Status The


  1. Crisis, Opportunity and the Submarine Cable Industry Apricot 07 28 February 2007 Wilfred Kwan CTO, Asia Netcom Empowering Communications in the Asian Century

  2. Agenda • The Recent Crisis • How We Survive • The Current Status • The Future • Discussion 2

  3. GMT 12:26:01, 26 December 2006 Taiwan 7.1 magnitude � quake Multiple � aftershocks 6 cable systems � e fg ected We are the only cable system managed to stay up in Asia… 3

  4. Was it Luck that ANC Survived the Quake ? Luck ? 4

  5. Was it Luck that ANC Survived the Quake ? Made Our Own Luck ? Luck 5

  6. EAC Topology Shima Express Rings Service pair Express Rings Protection pair BU South Local Rings Serv.pair North Local Rings Service pair 1 South Local Rings Prot. pair North Local Rings Protection pair SEG. C SEG. A SEG. L SEG. B Tie Cables Tie Cables Hong Kong Taiwan Taiwan Hong Kong CLS1 CLS 2 CLS2 Ajigaura CLS 1 SEG. 2A-1 SEG. E SEG. K Qingdao SEG. D SEG. F1 SEG. F3 BU BU 2 5 Korea SEG. F2 SEG. 2B-1 SEG. 2B-2 EAC2 Rings Service Pair EAC2 Rings Protection Pair EAC2 Rings Service Pair EAC2 Rings Protection Pair Singapore Philippines 6

  7. 24 Hours at Asia Netcom…First Cut GMT 17:27 – EAC � su fg ers first cut Restoration Control � started 15 minutes after the cut Taiwan Proactively informed � customers Cable Ship mobilized � COTDR readings to � pinpoint exact fault location First service outage: 1 � hour 06 minutes Around 60 minutes service disruption 7

  8. EAC Faults 26th Dec 07 to 5th Feb 07 X Shima Express Rings Service pair Express Rings Protection pair BU South Local Rings Serv.pair North Local Rings Service pair 1 South Local Rings Prot. pair North Local Rings Protection pair SEG. C SEG. A SEG. L SEG. B Tie Cables Tie Cables Hong Kong Taiwan Taiwan Hong Kong CLS1 CLS 2 CLS2 Ajigaura CLS 1 SEG. 2A-1 SEG. E SEG. K Qingdao SEG. D SEG. F1 SEG. F3 BU BU 2 5 Korea SEG. F2 SEG. 2B-1 SEG. 2B-2 EAC2 Rings Service Pair EAC2 Rings Protection Pair EAC2 Rings Service Pair EAC2 Rings Protection Pair Singapore Philippines 8

  9. 24 Hours at Asia Netcom… GMT 03:30 – EAC � su fg ers second cut Second Cut Double cut � Team really under test, � not drills!! Stayed focus � Planned for manual � restoration Notified customers � despite no resolution in place yet Searched external � Taiwan restoration possibility Executed Manual � Restoration Plan Real-time L1 to L3 � visibility GMT 14:13 – All � customer services restored via southern ring  Summary We are the only cable system still up Total duration of � service disruption: 11 in Asia… hours and 49 minutes Total capacity � Provided 20Gb of emergency restored: + 100Gbps 9 restoration bandwidth to the industry

  10. L1 – L3 Monitoring Capability 10

  11. EAC Faults 26th Dec 07 to 5th Feb 07 X Shima Express Rings Service pair Express Rings Protection pair BU South Local Rings Serv.pair North Local Rings Service pair 1 South Local Rings Prot. pair North Local Rings Protection pair SEG. C SEG. A SEG. L SEG. B Tie Cables Tie Cables Hong Kong Taiwan Taiwan Hong Kong CLS1 CLS 2 CLS2 Ajigaura CLS 1 SEG. 2A-1 SEG. E SEG. K Qingdao SEG. D SEG. F1 SEG. F3 BU BU 2 5 Korea X SEG. F2 SEG. 2B-1 SEG. 2B-2 EAC2 Rings Service Pair EAC2 Rings Protection Pair EAC2 Rings Service Pair EAC2 Rings Protection Pair Singapore Philippines 11

  12. Was it Luck that ANC Survived the Quake ? Luck ? � The Almighty spared ANC by taking down only two of the three segments connecting Hong Kong and Taiwan � Multi-point Topology 12

  13. Was it Luck that ANC Survived the Quake ? Made Our Own Luck ? Luck � The Almighty spared ANC by taking down only two of the three segments connecting Hong Kong and Taiwan � Operational efficiency  Teamwork � Multi-point  Routine Preparations & Topology Drills  Stayed Focus � Proactive attitude in customer communications 13 � L1 through L3 visibility

  14. Still skeptical….? 14

  15. The Preparations started 12 months ago….. 15

  16. The Preparations started 12 months ago….. SHI SNG HKG HKG TWN QDA KOR AJG PHL TWN EAC2 Capacity Upgrade EAC1 Capacity Upgrade 16

  17. The Preparations started 12 months ago….. SHI SNG HKG HKG TWN QDA KOR AJG PHL TWN EAC2 Capacity Upgrade EAC1 Capacity Upgrade SDH NE Upgrade Lambda Lambda Unite Unite TDM ATDM BWM BWM 10G 10G 2F 2F STM-6 STM-6 4 MS- 4 MS- 4F SPRIN SPRIN STM-6 G G 4 MS- SPRIN G (with TOP) 1+1 1+1 MSP MSP ADM ADM BWM BWM 16/1 16/1 Lambda Lambda Unite Unite 17

  18. The Preparations started 12 months ago….. SHI SNG HKG HKG TWN QDA KOR AJG PHL TWN EAC2 Capacity Upgrade EAC1 Capacity Upgrade SDH NE Upgrade Qingdao Extension Japan Korea Ajigaura Lambda Lambda Qingda Unite Unite Shima o TDM ATDM BWM BWM 10G 10G 2F 2F STM-6 STM-6 Taiwan 4 MS- 4 MS- Hong Kong 4F SPRIN SPRIN STM-6 G G 4 MS- SPRIN G (with TOP) 1+1 1+1 Philippines MSP MSP ADM ADM BWM BWM 16/1 16/1 Lambda Lambda Unite Unite 18 Singapore

  19. Was it Luck that ANC Survived the Quake ? Industry Network Made Our Own Luck ? Capacity Survivability Luck Restoration � Capacity Expansion � The Almighty � Network Expansion • Assisted numerous spared ANC by carriers and � SDH Equipment taking down only enterprise Upgrade two of the three customers to restore segments over 20Gb of connecting Hong bandwidth Kong and Taiwan � Operational efficiency  Teamwork � Multi-point  Routine Preparation & Topology Drills  Stayed Focus � Proactive attitude in customer communications 19 � L1 through L3 visibility

  20. …and the future 20

  21. Future Enhancements • Network-to-Network Overlay / Backup Solution • Meshed Topology • Protection Schemes – SDH – ASON / GMPLS – IP over DWDM • Pre-emptive Service • Unprotect Service 21

  22. Cable Construction of EAC Pacific Multi-ring architecture in Asia and across the Pacific 22

  23. Some Closing Thoughts… • It took the right technology, the right preparation, the right attitude and definitely some luck to successfully conduct any restorations. • You can’t prevent natural events like earthquakes, but what you can do is to prepare well, in advance, and have the people with the right attitude to execute the plan. • Co-operations amongst carriers can improve the chances of overcoming subsea network events, whether these events are 23 triggered by natural disasters, external

  24. Discussion… Empowering Communications in the Asian Century

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend