corrections to infrastructure presentation gen gener eral
play

Corrections to Infrastructure Presentation Gen Gener eral al In - PowerPoint PPT Presentation

Corrections to Infrastructure Presentation Gen Gener eral al In Infr fras astructure e Projec ect Des escrip iptio ion Water lines will be replaced along 4 th , 6 th , Island View, Furman and Edgecliff to Furman Sewer systems


  1. Corrections to Infrastructure Presentation

  2. Gen Gener eral al In Infr fras astructure e Projec ect Des escrip iptio ion • Water lines will be replaced along 4 th , 6 th , Island View, Furman and Edgecliff to Furman • Sewer systems updated along sections of 3 rd , 6 th , Al Anderson and new mains installed along Furman, Decker and Edgecliff to Furman • Storm systems will be updated along 6 th and new systems installed along Furman, Decker and Edgecliff to the county outlet • Pedestrian walkway along 6 th street with curbs • Repave and install thickened edges along Furman, Decker and Edgecliff 9/27/19 2

  3. Th Thic ickened Edge for Storm Water Man anag agement & Walk alkway North of Edgecliff with Walkway on 6 th Street and thickened edge South side of Edgecliff w/o walkway 9/27/19 3

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend